← Back
BuildNYC
Three families
2773 UNIVERSITY AVENUE
BRONX · BIN 2015337
💬 Discuss this project
1930Year Built
3Stories
C0Building Class
R6Zoning
4,536 sfGross Floor Area
3Units
Rent Stabilized73 Active Violations ▸
Three families · Owner of record: Universe Equiities · 2,500 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 1 filing · 20 docs
BulkheadUnder Construction1p · 1 filing · 20 docs
Floor 3Under Construction15p · 1 filing · 20 docs
Floor 2Under Construction15p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
Site & exteriorUnder Construction22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
65th Place Holdings1511/08/2026
Rockawawy Equities NY611/08/2026
Universe Equiities103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2024$1.1M—— → —$254/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG Engineering811/05/2026
Vasilios Artemiou PE210/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xpdite Group LLC (104)503/21/2026
Xpdite Group LLC 104403/21/2026
Xpdite Group LLC 105103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Revamp NYCGeneral Contractor311/08/2026
Revamp NYCScaffold111/08/2026
Brook Plumbing & HeatingFire Protection110/28/2026
Pipe Solutions AdvisPlumbing110/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI Consulting Services8904811/05/2026
Building Lifecycle
11/05/2026
Filed — Alteration CO
MECHANICAL APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION X01099978-I1
X01099978-P8
11/05/2026
Permit renewed — General Construction
Renewed with changes
X01099978-I1-GC
11/04/2026
Permit issued — Construction Fence
X01099978-S5-FN
11/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/03/2026
Special inspection requirement — Mechanical Systems
MD ISLAM
182 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRevamp NYC11/05/2026
DOB NOWConstruction FencePermit IssuedRevamp NYC11/04/2026
DOB NOWSprinklersPermit IssuedBrook Plumbing & Heating10/27/2026
DOB NOWPlumbingPermit IssuedPipe Solutions Advis10/19/2026
DOB NOWGeneral ConstructionPermit IssuedRevamp NYC09/17/2026
DOB NOWMechanical SystemsPermit IssuedRevamp NYC09/17/2026
1 project · most recent 11/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
11/05/2026Permit IssuedRevamp NYCHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 11/05/2026
Sprinkler System
FiledStatusContractorScope
11/05/2026Permit IssuedBrook Plumbing & HeatingSprinkler System
1 project · most recent 11/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/05/2026Permit IssuedPipe Solutions AdvisGas, Water/Sanitary
2 projects · most recent 11/05/2026
General Wiring
FiledStatusContractorScope
11/05/2026Permit IssuedPower Direct ElectricGeneral Wiring
11/05/2026Permit IssuedPower Direct Electric—
1 project · most recent 11/05/2026
Masonry Wood
FiledStatusContractorScope
11/05/2026Permit IssuedRevamp NYCMasonry, Wood
1 project · most recent 11/05/2026
Fence
FiledStatusContractorScope
11/05/2026Permit IssuedRevamp NYCFence
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
11/03/2026Structural Stability – Alterations of existing buildings—special
11/03/2026Mechanical SystemsMD ISLAMspecial
11/03/2026Duct leakage testing, insulation and designMD ISLAMenergy_progress
11/03/2026HVAC-R and service water piping design and insulationMD ISLAMenergy_progress
11/03/2026HVAC-R and service water heating system controlsMD ISLAMenergy_progress
11/03/2026Permanent certificateMD ISLAMenergy_progress
11/03/2026HVAC-R and service water heating equipmentMD ISLAMenergy_progress
11/03/2026Maintenance informationMD ISLAMenergy_progress
11/03/2026FinalMD ISLAMprogress
10/19/2026Fire-Resistant Penetrations and JointsMD ISLAMspecial
10/19/2026Energy Code Compliance InspectionsMD ISLAMprogress
10/19/2026HVAC-R and service water heating system controlsMD ISLAMenergy_progress
10/19/2026HVAC-R and service water piping design and insulationMD ISLAMenergy_progress
10/19/2026Maintenance informationMD ISLAMenergy_progress
10/19/2026HVAC-R and service water heating equipmentMD ISLAMenergy_progress
10/13/2026Fire-Resistant Penetrations and JointsMD ISLAMspecial
10/13/2026Post-installed AnchorsMD ISLAMspecial
10/13/2026Sprinkler SystemsMD ISLAMspecial
09/24/2026Interior lighting powerMD ISLAMenergy_progress
09/24/2026Fire-Resistant Penetrations and JointsMD ISLAMspecial
09/24/2026Structural Stability – Alterations of existing buildingsMD ISLAMspecial
09/24/2026Energy Code Compliance InspectionsMD ISLAMprogress
09/24/2026Fire-Resistance Rated ConstructionMD ISLAMprogress
09/24/2026Fenestration air leakageMD ISLAMenergy_progress
09/24/2026Maintenance informationMD ISLAMenergy_progress
Latest 25 of 59.
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account