← Back
Primarily 3 family with 1 store or office
2777 WEBSTER AVENUE
BRONX · Bedford Park · BIN 2016411
💬 Discuss this project
1939Year Built
3Stories
S3Building Class
R7DZoning
3,450 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸
Primarily 3 family with 1 store or office · Owner of record: 2777 WEBSTER AVE LLC · 2,089 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 3 docs
Floor 31p · 1 filing · 12 docs
Floor 2
Floor 12p · 1 filing · 12 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2777 WEBSTER AVE1907/08/2026
2777 WEBSTER LLC703/22/2026
2777 WEBSTER FINANCE DELI303/22/2026
2777 REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/08/2022$700K—2777 WEBSTER LLC → 2777 WEBSTER AVE LLC$203/sf building
09/08/2022$700K—2777 WEBSTER LLC → 2777 WEBSTER AVE LLC$203/sf building
03/16/2017$744K—2777 REALTY LLC → 2777 WEBSTER LLC$216/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB109/19/2024
SION CONSULTING ENGINEERING PC512/07/2023
PAUL PERDEK, PROF. ENG. PLLC104/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
SION CONSULTING ENGINEERING1003/21/2026
LOXTON203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDERSINGH CONSTRUCTIONGeneral Contractor507/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor403/21/2026
JOHN EVAN CONTRACTING CORGeneral Contractor303/21/2026
SOURCE ELECTRIC INCElectrical103/22/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181109/19/2024
SION CONSULTING ENG. PC1108512/07/2023
Building Lifecycle
All (143)Filed (7)Permit Issued (7)Signed Off (3)Violation (49)Inspection (8)Objection (54)Special Inspection (15)
07/29/2026
Violation issued (HPD, open)
B
09/26/2024
Permit issued — Mechanical Systems
X01112668-I1-MS
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2024
Filed — Alteration
Replace the Commerical Hood and Ductwork. No change of use, egress, or occupancy.
X01112668-I1
04/03/2024
Violation issued (HPD, closed)
A
01/22/2024
Signed off — Alteration
INTERIOR RENOVATION, NO CHANGE EGRESS, US GROPE, OCCUPANCY
X08024516-I1
01/08/2024
Permit issued — General Construction
X08024516-I1-MS
12/20/2023
Signed off — Alteration
THIS IS A THREE-FAMILY BUILDING THIS PLUMBING APPLICATION IS IN CONJUNCTION WITH GC APPLICATION X08024516
X08024617-I1
12/20/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/07/2023
Filed — Alteration
INTERIOR RENOVATION, NO CHANGE EGRESS, US GROPE, OCCUPANCY
X08024516-P2
12/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
12/07/2023
Special inspection requirement — Lighting in dwelling units
sion hourizadeh
12/07/2023
Special inspection requirement — Maintenance information
sion hourizadeh
12/07/2023
Special inspection requirement — Heating Systems
sion hourizadeh
12/07/2023
Special inspection requirement — Mechanical Systems
sion hourizadeh
12/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
12/07/2023
Special inspection requirement — Final
sion hourizadeh
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
12/07/2023
Special inspection requirement — Structural Wood Frame
sion hourizadeh
12/07/2023
Special inspection requirement — Interior lighting power
sion hourizadeh
12/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
12/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
12/07/2023
Special inspection requirement — Permanent certificate
sion hourizadeh
12/05/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
10/30/2023
Objection raised — Other
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection raised — Other
10/30/2023
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/24/2023
Objection raised — Admin
10/24/2023
Objection raised — Fire_Protection
10/23/2023
Filed — Alteration
THIS IS A THREE-FAMILY BUILDING THIS PLUMBING APPLICATION IS IN CONJUNCTION WITH GC APPLICATION X08024516
X08024617-P1
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
10/16/2023
Objection raised — Admin
10/16/2023
Objection resolved — Addressed
10/16/2023
Objection resolved — Addressed
10/05/2023
Objection raised — C/O of existing property requi
10/04/2023
Filed — Alteration
INTERIOR RENOVATION, NO CHANGE EGRESS, US GROPE, OCCUPANCY
X08024516-P1
09/28/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00707032-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2023
Permit issued — Sidewalk Shed
X00707032-I1-SH
03/30/2023
Permit issued — Plumbing
X08024617-I1-PL
03/21/2023
Permit issued — Mechanical Systems
X08024516-I1-GC
03/21/2023
Permit issued — Structural
X08024516-I1-ST
03/17/2023
Violation issued (HPD, closed)
A
02/12/2023
Objection raised — Other
02/12/2023
Objection resolved — Addressed
02/12/2023
Objection raised — Other
02/12/2023
Objection resolved — Addressed
11/29/2022
Objection raised — Fire_Protection
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Scope
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJOHN EVAN CONTRACTING COR09/26/2024
DOB NOWGeneral ConstructionSigned-offANDERSINGH CONSTRUCTION01/08/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/03/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/30/2023
DOB NOWMechanical SystemsSigned-offANDERSINGH CONSTRUCTION03/21/2023
DOB NOWStructuralSigned-offANDERSINGH CONSTRUCTION03/21/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/04/2022
BISOTISSUEDELGIN CONSTRUCTION CORP06/21/2002
3 projects · most recent 06/28/2024
General Wiring Lighting
FiledStatusContractorScope
06/28/2024Permit IssuedSOURCE ELECTRIC INCGeneral Wiring, Lighting
04/03/2023Permit IssuedBRANDL ELECTRIC INC.General Wiring
03/24/2022CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/20/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/05/2023Fail-Final General Construction Non-Directive 14FailView ↗
11/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/07/2023HVAC-R and service water heating system controlssion hourizadehenergy_progress
12/07/2023Lighting in dwelling unitssion hourizadehenergy_progress
12/07/2023Maintenance informationsion hourizadehenergy_progress
12/07/2023Heating Systemssion hourizadehspecial
12/07/2023Mechanical Systemssion hourizadehspecial
12/07/2023Structural Stability – Alterations of existing buildingssion hourizadehspecial
12/07/2023Finalsion hourizadehprogress
12/07/2023Fire-Resistance Rated Constructionsion hourizadehprogress
12/07/2023Structural Wood Framesion hourizadehprogress
12/07/2023Interior lighting powersion hourizadehenergy_progress
12/07/2023HVAC-R and service water heating equipmentsion hourizadehenergy_progress
12/07/2023HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
12/07/2023Permanent certificatesion hourizadehenergy_progress
10/31/2023Fire-Resistant Penetrations and Jointssion hourizadehspecial
10/23/2023Fire-Resistant Penetrations and Jointssion hourizadehspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00707032-I1Request digital key ↗
08/23/2026X08024516-I1Request digital key ↗
08/23/2026X08024516-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00707032-I1Open ↗
08/23/2026X08024516-P1Open ↗
08/23/2026X08024516-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/18/2026X08024617-I1Open ↗
08/26/2026X08024516-P2Open ↗
08/25/2026X08024617-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X08024516-P2Open ↗
08/26/2026X08024516-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026X08024516-I1Open ↗
08/15/2026X08024516-P1Open ↗
08/15/2026X08024617-I1Open ↗
Showing 3 of 6 on file for this type