← Back
Two family converted from one family
278 11 STREET
BROOKLYN · BIN 3022868
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,400 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,667 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralOther
Floor 214p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Sub-Basement11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 278 11 STREET103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/16/2023$2.2M—Private party → Private party$917/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTANT AND BROWN ENGINEERING DPC605/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AYE CONSULTING GROUP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTOWN CONSULTANTS INCGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252205/27/2026
CONSTANT AND BROWN ENGINE7565402/29/2024
Building Lifecycle
All (41)Filed (6)Permit Issued (2)Violation (3)Inspection (4)Objection (18)Special Inspection (8)
05/27/2026
Filed — Alteration
Relocation of kitchen to 1st floor. Conversion of bathroom to powder room at 1st floor. Relocation of one bathroom and installation of one new bathroom at 2nd floor, and installation of new washer and dryer at basement and 2nd Floors.
B00919649-P4
05/14/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/29/2024
Filed — Alteration
Relocation of kitchen to 1st floor. Conversion of bathroom to powder room at 1st floor. Relocation of one bathroom and installation of one new bathroom at 2nd floor, and installation of new washer and dryer at basement and 2nd Floors.
B00919649-P3
02/20/2024
Filed — Alteration
Relocation of kitchen to 1st floor. Conversion of bathroom to powder room at 1st floor. Relocation of one bathroom and installation of one new bathroom at 2nd floor, and installation of new washer and dryer at basement and 2nd Floors.
B00919649-P2
02/16/2024
Special inspection requirement — Energy Code Compliance Inspections
VLADIMIR CONSTANT
02/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VLADIMIR CONSTANT
02/06/2024
Objection resolved — Addressed
01/04/2024
Objection raised — Scope
01/02/2024
Filed — Alteration
Relocation of kitchen to 1st floor. Conversion of bathroom to powder room at 1st floor. Relocation of one bathroom and installation of one new bathroom at 2nd floor, and installation of new washer and dryer at basement and 2nd Floors.
B00919649-P1
12/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
VLADIMIR CONSTANT
12/24/2023
Special inspection requirement — Energy Code Compliance Inspections
VLADIMIR CONSTANT
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2023
Permit issued — Plumbing
B00919649-S1-PL
10/19/2023
Filed — Alteration
Relocation of kitchen to 1st floor. Conversion of bathroom to powder room at 1st floor. Relocation of one bathroom and installation of one new bathroom at 2nd floor, and installation of new washer and dryer at basement and 2nd Floors.
B00919649-S1
10/06/2023
Permit issued — General Construction
B00919649-I1-GC
10/03/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
09/23/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
08/25/2023
Objection raised — Inspections
08/25/2023
Objection raised — Energy
08/25/2023
Objection raised — Fire_Protection
08/25/2023
Objection raised — Other
08/25/2023
Objection raised — Scope
08/25/2023
Objection raised — Other
08/24/2023
Objection raised — Scope
08/24/2023
Objection raised — Scope
08/18/2023
Filed — Alteration
Relocation of kitchen to 1st floor. Conversion of bathroom to powder room at 1st floor. Relocation of one bathroom and installation of one new bathroom at 2nd floor, and installation of new washer and dryer at basement and 2nd Floors.
B00919649-I1
08/15/2023
Special inspection requirement — Energy Code Compliance Inspections
VLADIMIR CONSTANT
08/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
08/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/16/2022
Violation issued (HPD, closed)
I
11/01/2018
Violation issued (HPD, closed)
I
02/26/2007
Violation issued (ECB, closed)
Site Safety
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/21/2023
DOB NOWGeneral ConstructionPermit IssuedINTOWN CONSULTANTS INC10/06/2023
BISOTISSUEDBPS CONSTRUCTION & HOME04/08/2009
BISOTISSUEDBPS CONSTRUCTION & HOME12/12/2008
1 project · most recent 05/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/27/2026Signed-offT & T PLUMBING INCGas, Water/Sanitary
1 project · most recent 11/20/2023
General Wiring
FiledStatusContractorScope
11/20/2023CompleteKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/14/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/16/2024Energy Code Compliance InspectionsVLADIMIR CONSTANTprogress
02/16/2024Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
12/24/2023Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
12/24/2023Energy Code Compliance InspectionsVLADIMIR CONSTANTprogress
08/15/2023Energy Code Compliance InspectionsVLADIMIR CONSTANTprogress
08/15/2023Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
08/15/2023Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
08/15/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B00919649-P3Request digital key ↗
08/25/2026B00919649-P2Request digital key ↗
08/25/2026B00919649-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
02/24/2009310213952Open ↗
10/15/2008310213952Open ↗
▸BISWORK PERMIT APPLICATION2
04/09/2009310213952Open ↗
12/12/2008310213952Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B00919649-P2Open ↗
08/25/2026B00919649-P1Open ↗
08/25/2026B00919649-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B00919649-P1Open ↗
09/01/2026B00919649-P2Open ↗
08/24/2026B00919649-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00919649-P1Open ↗
09/01/2026B00919649-P2Open ↗
08/24/2026B00919649-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/29/2017310213952Open ↗
10/15/2008310213952Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/15/2008310213952Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/15/2008310213952Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B00919649-S1Open ↗
08/25/2026B00919649-P4Open ↗
08/25/2026B00919649-P3Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/15/2008310213952Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/15/2008310213952Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/29/2017310213952Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/15/2008310213952Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
12/29/2017310213952Open ↗
12/29/2017310213952Open ↗
▸BISEFILING COVER SHEET1
10/15/2008310213952Open ↗