← Back
Walk-up cooperative
276 EAST 7 STREET
MANHATTAN · East Village · BIN 1004487
💬 Discuss this project
1920Year Built
6Stories
C6Building Class
R8BZoning
13,248 sfGross Floor Area
19Units
Rent Stabilized21 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: LES 278 HOUSING DEVELOPMENT FUND CORPORA TION · 2,772 sf lot · 4.78 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JLP METRO MANAGEMENT1307/08/2026
METRO CONTRACTING NY503/22/2026
LES 278 HOUSING DEVELOPMENT FUND CORPORA TION203/22/2026
UHAB HOUSING DEVELOPMENT103/22/2026
UHAB203/21/2026
UHAB HDFC903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2019$1.3M—UHAB HOUSING DEVELOPMENT FUND CORPORATION → LES 278 HOUSING DEVELOPMENT FUND CORPORATION$96/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.308/09/2023
ENTHINK ENGINEERS LLC108/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE-ATLAS PLBING & HTGPlumbing407/08/2026
METRO CONTRACTING NY, INC.General Contractor203/21/2026
DA SILVA, JAMESElectrical103/21/2026
LEWKOWICZ, MIKEElectrical103/21/2026
LOPEZ, ERICElectrical103/21/2026
RICHARDSON, RICHARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851108/17/2021
Building Lifecycle
All (80)Filed (4)Permit Issued (5)Signed Off (3)Violation (60)Inspection (2)Special Inspection (6)
04/29/2026
Violation issued (HPD, open)
A
04/16/2026
Violation issued (HPD, open)
A
04/16/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, closed)
C
12/01/2023
Violation issued (HPD, open)
C
10/25/2023
Signed off — Alteration
REPLACE GAS BOILER WITH INDIRECT WATER HEATER. CONNECT TO EXISTING GAS PIPING.
M00574733-I1
10/25/2023
Signed off — Alteration
REPLACE TWO BOILERS WITH ONE BOILER AND ONE INDIRECT WATER HEATER. REPLACE FLUE VENTS TO ROOF.
M00574750-I1
09/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/09/2023
Filed — Alteration
REPLACE GAS BOILER WITH INDIRECT WATER HEATER. CONNECT TO EXISTING GAS PIPING.
M00574733-P1
08/09/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2022
Permit issued — Plumbing
M00574733-I1-PL
11/09/2022
Permit issued — Boiler Equipment
M00574750-I1-BE
06/15/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF.
M00568486-I1
05/11/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2022
Violation issued (ECB, open)
Construction
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
01/18/2022
Violation issued (HPD, open)
C
01/18/2022
Violation issued (HPD, closed)
B
01/18/2022
Violation issued (HPD, closed)
C
01/18/2022
Violation issued (HPD, closed)
B
01/18/2022
Violation issued (HPD, open)
C
01/18/2022
Violation issued (HPD, closed)
C
12/15/2021
Violation issued (HPD, open)
B
11/26/2021
Violation issued (HPD, closed)
B
11/26/2021
Violation issued (HPD, closed)
C
11/16/2021
Violation issued (HPD, closed)
C
11/10/2021
Violation issued (HPD, open)
I
10/29/2021
Violation issued (HPD, open)
A
10/29/2021
Violation issued (HPD, open)
C
10/29/2021
Violation issued (HPD, closed)
C
10/29/2021
Violation issued (HPD, closed)
C
10/29/2021
Violation issued (HPD, closed)
C
10/29/2021
Violation issued (HPD, open)
A
10/29/2021
Violation issued (HPD, closed)
C
10/29/2021
Violation issued (HPD, open)
A
10/29/2021
Violation issued (HPD, open)
A
10/29/2021
Violation issued (HPD, open)
A
10/29/2021
Violation issued (HPD, open)
C
10/29/2021
Violation issued (HPD, closed)
C
10/29/2021
Violation issued (HPD, closed)
C
08/25/2021
Permit issued — Boiler Equipment
M00574750-I1-BE
08/25/2021
Permit issued — Plumbing
M00574733-I1-PL
08/17/2021
Filed — Alteration
REPLACE GAS BOILER WITH INDIRECT WATER HEATER. CONNECT TO EXISTING GAS PIPING.
M00574733-I1
08/17/2021
Filed — Alteration
REPLACE TWO BOILERS WITH ONE BOILER AND ONE INDIRECT WATER HEATER. REPLACE FLUE VENTS TO ROOF.
M00574750-I1
08/11/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
08/11/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/11/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/11/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
08/09/2021
Permit issued — Sidewalk Shed
M00568486-I1-SH
08/04/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF.
M00568486-I1
08/02/2021
Special inspection requirement — Final
Sunil Saigal
05/13/2021
Violation issued (HPD, closed)
C
05/13/2021
Violation issued (HPD, closed)
A
05/13/2021
Violation issued (HPD, closed)
A
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offACE-ATLAS PLBING & HTG11/09/2022
DOB NOWBoiler EquipmentSigned-offACE-ATLAS PLBING & HTG11/09/2022
DOB NOWBoiler EquipmentSigned-offACE-ATLAS PLBING & HTG08/25/2021
DOB NOWPlumbingSigned-offACE-ATLAS PLBING & HTG08/25/2021
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.08/09/2021
BISPLISSUEDA REAL GOOD PLUMBER INC02/07/2017
BISOTISSUEDP J HOME IMPROVEMENT INC10/19/2012
BISOTISSUEDG.M. CONSTRUCTION & WATERPROOF04/12/2006
BISBLISSUEDNEW YORK HEATING CORP01/07/2005
BISPLISSUEDA REAL GOOD PLUMBER INC10/22/2004
BISEQISSUEDMBR CONTRACTING INC01/28/2004
BISOTISSUEDG.M. CONSTRUCTION & WATERPROOF11/24/2003
3 projects · most recent 11/05/2023
Boiler Controls General Wiring
FiledStatusContractorScope
11/05/2023CompleteSTX ELECTRICAL CORPBoiler Controls
08/25/2023CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
08/02/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/09/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
08/11/2021Heating SystemsLOUIS ARENAspecial
08/11/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/11/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/11/2021Maintenance informationLOUIS ARENAenergy_progress
08/02/2021FinalSunil Saigalprogress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00568486-I1Request digital key ↗
09/03/2026M00574733-I1Request digital key ↗
09/03/2026M00574733-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
02/09/2018103572652Open ↗
08/23/2012121345268Open ↗
▸BISWORK PERMIT APPLICATION1
10/23/2012121345268Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M00574750-I1Open ↗
09/23/2026M00574750-I1Open ↗
09/23/2026M00574750-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00568486-I1Open ↗
09/03/2026M00574750-I1Open ↗
08/13/2026M00574733-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/23/2012121345268Open ↗
08/23/2012121345268Open ↗
08/23/2012121345268Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/25/2013121345268Open ↗
06/06/2013121345268Open ↗
08/23/2012121345268Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/23/2012121345268Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026M00574750-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/09/2018103572652Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00574750-I1Open ↗
08/13/2026M00574733-P1Open ↗
08/13/2026M00574733-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/23/2012121345268Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/25/2013121345268Open ↗
08/23/2012121345268Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/06/2013121345268Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00574750-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/25/2013121345268Open ↗
06/06/2013121345268Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/23/2012121345268Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/03/2026M00568486-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
06/06/2013121345268Open ↗
08/23/2012121345268Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
10/23/2012121345268Open ↗
▸Filing & Intake Forms3
▸BISeFiling Job Application Cover Sheet1
08/23/2012121345268Open ↗
▸BISADDITIONAL INFORMATION1
02/09/2018103572652Open ↗
▸BISBOROUGH INTAKE FORM1
02/09/2018103572652Open ↗