ECB02/18/2026VISION PANEL AT FRONT DOOR BROKEN AND MISSING SECTIONS LEAVING SHARDS EXPOSING PUBLIC AND TENANTS TO SEVERE INJURY, REPAIR AND/REPLACE$25K due
ECB02/09/2026NO CERTIFICATE OF CORRECTIONS FILED FOR VIOLATION NUMBER 39143567M, FILE A CERTIFICATE OF CORRECTION$6K due
ECB04/02/2025ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1 - 28-118.3.2. NOTED: AT TIME OF INSPECTION - 2ND & 3RD FLRS OBSERVED CREATED & OCCUPIED BY 2 SEPARATE FAMILIES. 2013$2K due
ECB04/02/2025FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION - 1. GLASS PANE AT FRONT ENTRY DOOR OBSERVED BADLY CRACKED WITH SHARP SHARDS CREATING A CUT HAZARD; 2. INTERIOR STEPS TO ROOF$12K due
HPD12/17/2024§ 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT THE RANGE IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD12/17/2024§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND BUZZER SYSTEM FROM BUILDING ENTRANCE TO PANEL AT THE SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD12/17/2024§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD12/17/2024§ 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD12/17/2024§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD12/17/2024§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
ECB09/01/2014FAILURE TO PROVIDE APPROVED PLANS AT JOB SITE AT TIME OF INSPECTION. NOTED: ON GOING WORK UNDER APPL #220283057,NO APPROVED PLANS ON SITE TOCONDUCT INSPECTION. REMEDY: STOP ALL WORK - IMMEDIATELY PROVIDE APPROVNothing owed — awaiting certificate of correction