← Back
Single or multiple dwelling with stores or offices
279 1 AVENUE
MANHATTAN · BIN 1082157
💬 Discuss this project
1950Year Built
1Stories
S9Building Class
C1-6AZoning
5,115 sfGross Floor Area
9Units
Rent Stabilized15 Open Violations 14 unresolved · 1 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: 279 FIRST AVENUE, · 1,860 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof1p · 1 filing · 7 docs
Floor 12p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
279 FIRST AVE1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES408/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KATAN P & H INCPlumbing907/08/2026
SHAM CONSTRUCTION GROUPGeneral Contractor507/08/2026
BONHOMME GERBERTElectrical103/21/2026
GERBERT BONHOMMEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050308/09/2023
Building Lifecycle
All (33)Filed (4)Permit Issued (4)Signed Off (4)Violation (4)Inspection (3)Special Inspection (14)
06/04/2024
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES & GAS COMMERCIAL COOKING EQUIPMENT, IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER APP #M00902463
M00902468-I1
06/04/2024
Signed off — Alteration
INTERIOR CLEANUP & REMOVE NON-BEARING WALLS BETWEEN 2 COMMERCIAL STORES AT FIRST FLOOR (COMMERCIAL ONLY). REMOVE SUSPENDED CEILING & REMOVE EXISTING FLOORING.
M00889128-I1
06/04/2024
Signed off — Alteration
MERGE TWO STORES WITH INTERIOR RENOVATION TO CREATE A NEW COMMERCIAL KITCHEN WITH EXHAUST DUCTWORK AND VENTILATION ON THE ROOF. NEW COMMERCIAL HOOD. REPLACE STORE FRONT. PLUMBING FILED UNDER M00902468.
M00902463-I1
06/03/2024
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH 1ST FLOOR COMMERCIAL SPACE RENOVATIONS
M00889119-I1
10/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2023
Permit issued — Plumbing
M00902468-I1-PL
08/15/2023
Permit issued — General Construction
M00902463-I1-GC-CX
08/09/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES & GAS COMMERCIAL COOKING EQUIPMENT, IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER APP #M00902463
M00902468-I1
08/03/2023
Filed — Alteration
MERGE TWO STORES WITH INTERIOR RENOVATION TO CREATE A NEW COMMERCIAL KITCHEN WITH EXHAUST DUCTWORK AND VENTILATION ON THE ROOF. NEW COMMERCIAL HOOD. REPLACE STORE FRONT. PLUMBING FILED UNDER M00902468.
M00902463-I1
07/12/2023
Permit issued — General Construction
M00889128-I1-GC
07/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
07/11/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
07/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
PAUL MARINO
07/11/2023
Special inspection requirement — Mechanical Systems
PAUL MARINO
07/11/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
07/11/2023
Special inspection requirement — Final
Hany Demetry
07/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
PAUL MARINO
07/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
06/28/2023
Filed — Alteration
INTERIOR CLEANUP & REMOVE NON-BEARING WALLS BETWEEN 2 COMMERCIAL STORES AT FIRST FLOOR (COMMERCIAL ONLY). REMOVE SUSPENDED CEILING & REMOVE EXISTING FLOORING.
M00889128-I1
06/23/2023
Permit issued — Construction Fence
M00889119-I1-FN
06/21/2023
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH 1ST FLOOR COMMERCIAL SPACE RENOVATIONS
M00889119-I1
06/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
PAUL MARINO
06/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
06/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
06/14/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
06/12/2023
Special inspection requirement — Final
Hany Demetry
04/19/2015
Violation issued (ECB, closed)
Unknown
04/30/2009
Violation issued (ECB, closed)
Construction
02/17/1999
Violation issued (ECB, open)
Construction
01/10/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKATAN P & H INC08/31/2023
DOB NOWGeneral ConstructionSigned-offSHAM CONSTRUCTION GROUP08/15/2023
DOB NOWGeneral ConstructionSigned-offSHAM CONSTRUCTION GROUP07/12/2023
DOB NOWConstruction FenceSigned-offSHAM CONSTRUCTION GROUP06/23/2023
BISOTISSUEDOLYMPUS GENERAL CONSTRUCT05/29/2009
BIS—ISSUED236 WINE & LIQUORS INC.08/05/1996
BISPLISSUEDBERCO PLG .08/05/1996
2 projects · most recent 06/27/2023
General Wiring
FiledStatusContractorScope
06/27/2023Permit IssuedBOROWIDE ELECT'L CONTR'SGeneral Wiring
01/14/2021Permit IssuedK & R ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/11/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
07/11/2023Energy Code Compliance InspectionsPAUL MARINOprogress
07/11/2023Tenant Protection Plan CompliancePAUL MARINOspecial
07/11/2023Mechanical SystemsPAUL MARINOspecial
07/11/2023Energy Code Compliance InspectionsPAUL MARINOprogress
07/11/2023FinalHany Demetryprogress
07/11/2023Tenant Protection Plan CompliancePAUL MARINOspecial
07/11/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/11/2023Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
06/14/2023Tenant Protection Plan CompliancePAUL MARINOspecial
06/14/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/14/2023Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
06/14/2023Energy Code Compliance InspectionsPAUL MARINOprogress
06/12/2023FinalHany Demetryprogress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/30/2026M00889119-I1Request digital key ↗
08/30/2026M00889128-I1Request digital key ↗
08/29/2026M00902463-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/29/2026124057420Open ↗
05/29/2009120047083Open ↗
▸BISWORK PERMIT APPLICATION1
06/01/2009120047083Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature6
09/26/2026M00902468-I1Open ↗
08/31/2026M00889128-I1Open ↗
08/31/2026M00889128-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/30/2026M00889119-I1Open ↗
08/29/2026M00902463-I1Open ↗
08/13/2026M00902468-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/26/2026M00902468-I1Open ↗
08/31/2026M00889128-I1Open ↗
08/23/2026M00902463-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/22/2010120047083Open ↗
05/29/2009120047083Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/29/2009120047083Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/29/2009120047083Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026M00902463-I1Open ↗
08/13/2026M00889128-I1Open ↗
08/13/2026M00902468-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/29/2009120047083Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
05/29/2009120047083Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/22/2010120047083Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/22/2010120047083Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/22/2010120047083Open ↗
05/29/2009120047083Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
01/29/2026124057420Open ↗
05/29/2009120047083Open ↗