City university
CUNY SC > LC_386_Lehman College
2790 GOULDEN AVENUE · Bedford Park · BIN 2015246
💬 Discuss this project
1969Year Built
4Stories
W5Building Class
R6Zoning
280,539 sfGross Floor Area
1Units
LL97 Covered17 Open Violations ▸
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 135,400 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction54p · 5 filings · 20 docs
Floor 466p · 1 filing · 14 docs
Floor 3Under Construction126p · 5 filings · 20 docs
Floor 2Under Construction124p · 5 filings · 20 docs
Floor 1Under Construction112p · 4 filings · 20 docs
CellarUnder Construction58p · 4 filings · 20 docs
Basement1p · 1 filing · 19 docs
Sub-BasementUnder Construction99p · 8 filings · 20 docs
Site & exterior4p · 1 filing · 6 docs
Filed — no permit issued26p · 5 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY4409/26/2026
DORMITORY AUTHORITY STATE OF NEW2103/21/2026
DEPT OF DESIGN CONSTRUCTION1303/21/2026
CUNY409/13/2026
DORMITORY AUTH THE STATE OF NY203/21/2026
DORMITORY AUTHORITY OF THE STATE OF NEW YORK103/22/2026
ONTRAC103/22/2026
DORMITORY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2403/21/2026
WILLIAM VITACCO ASSOCIATES603/21/2026
NERIS403/21/2026
SUPERSTRUCTURES ENG + ARCH203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & J ELECTRICAL CONTRACGeneral Contractor1307/08/2026
RK CONTRACTING INCGeneral Contractor1107/08/2026
VERNON CONSTR & DEV LLCGeneral Contractor409/26/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
CESAR QUERYElectrical303/21/2026
VALMAR ELECTRIC CORPGeneral Contractor303/21/2026
5 J'S ELECTL CONTS CORPElectrical203/22/2026
ELDOR ELECTRIC LLCGeneral Contractor203/21/2026
IANNELLI CONSTRUCTION COGeneral Contractor108/16/2026
C.Q. ELECTR'L CONTRG CORPElectrical103/22/2026
SIRINA FIRE PROTPlumbing103/22/2026
TRISTATE PLBG SVCS CORPPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061401/02/2026
UNIVERSAL TESTING AND INS400305/01/2024
Building Lifecycle
All (116)Filed (27)Permit Issued (25)Signed Off (1)Violation (18)Inspection (5)Objection (10)Special Inspection (30)
09/25/2026
Permit issued — General Construction
X00784923-I1-GC
09/25/2026
Permit issued — Mechanical Systems
X00784964-I1-MS
08/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2026
Permit issued — General Construction
X01128085-S2-GC
07/28/2026
Filed — Alteration
X01128085-S2
03/18/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/16/2026
Filed — Alteration
remove, replace and install new sprinkler heads and plumbing fixtures as per plans
X01365589-I1
03/16/2026
Filed — Alteration
Remove replace and install new SPLIT AC UNITS as per plans submitted herewith.
X01365394-I1
03/09/2026
Permit issued — Construction Fence
X01186074-I1-FN
03/09/2026
Permit issued — General Construction
X00996673-I1-GC
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/27/2026
Special inspection requirement — Sprinkler Systems
02/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/09/2026
Permit issued — Plumbing
X00784996-I1-PL
02/09/2026
Permit issued — General Construction
X00784923-I1-GC
02/06/2026
Permit issued — Mechanical Systems
X00784964-I1-MS
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
01/23/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
01/23/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/23/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Lighting controls
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/07/2026
Filed — Alteration
Mechanical work as shown on plans.
X00784964-P1
01/07/2026
Filed — Alteration
Plumbing work as shown on plans.
X00784996-P1
01/02/2026
Filed — Alteration
Application filed for Interior renovation of public toilets and adjoining spaces, including removal and installation of nonbearing partitions, fixtures and finishes. no change is proposed to use, occupancy or egress.
X00784923-P2
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/04/2025
Special inspection requirement — Final
12/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/04/2025
Special inspection requirement — Post-installed Anchors
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
12/04/2025
Special inspection requirement — Mechanical Systems
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/22/2025
Filed — Alteration
X01128085-I1
10/22/2025
Filed — Alteration
X01128085-S1
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
09/29/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/16/2025
Permit issued — Sprinklers
X00859378-S2-EW-SP
09/02/2025
Permit issued — Mechanical Systems
X00677763-I1-MS
08/15/2025
Permit issued — General Construction
X00996673-I1-GC
08/12/2025
Permit issued — Construction Fence
X01186074-I1-FN
08/05/2025
Permit issued — Construction Fence
X01186074-I1-FN
08/05/2025
Permit issued — General Construction
X00996673-I1-GC
06/25/2025
Permit issued — General Construction
X00996673-I1-GC
06/25/2025
Special inspection requirement — Final
Paul Millman
06/25/2025
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
06/25/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
06/25/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/23/2025
Filed — Alteration
Lehman College, Carman Hall Courtyards & Main Staircases waterproofing: Removal / replacement /repairs of waterproofing membrane, spalled concrete & deteriorated reinforcements, flashing @ various locations, drains. New trench drain and conc. Topping slab
X00996673-P1
06/16/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/14/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01186074-P1
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVERNON CONSTR & DEV LLC09/25/2026
DOB NOWMechanical SystemsPermit IssuedVERNON CONSTR & DEV LLC09/25/2026
DOB NOWGeneral ConstructionPermit IssuedIANNELLI CONSTRUCTION CO08/14/2026
DOB NOWConstruction FencePermit IssuedRK CONTRACTING INC03/09/2026
DOB NOWGeneral ConstructionPermit IssuedRK CONTRACTING INC03/09/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP02/09/2026
DOB NOWGeneral ConstructionPermit IssuedVERNON CONSTR & DEV LLC02/09/2026
DOB NOWMechanical SystemsPermit IssuedVERNON CONSTR & DEV LLC02/06/2026
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP09/16/2025
DOB NOWMechanical SystemsPermit IssuedM & J ELECTRICAL CONTRAC09/02/2025
DOB NOWGeneral ConstructionPermit IssuedRK CONTRACTING INC08/15/2025
DOB NOWConstruction FencePermit IssuedRK CONTRACTING INC08/12/2025
DOB NOWConstruction FencePermit IssuedRK CONTRACTING INC08/05/2025
DOB NOWGeneral ConstructionPermit IssuedRK CONTRACTING INC08/05/2025
DOB NOWGeneral ConstructionPermit IssuedRK CONTRACTING INC06/25/2025
DOB NOWConstruction FencePermit IssuedRK CONTRACTING INC03/05/2025
DOB NOWConstruction FencePermit IssuedRK CONTRACTING INC02/27/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP09/20/2024
DOB NOWMechanical SystemsPermit IssuedVALMAR ELECTRIC CORP09/09/2024
DOB NOWGeneral ConstructionSigned-offM & J ELECTRICAL CONTRAC12/06/2023
DOB NOWMechanical SystemsPermit IssuedM & J ELECTRICAL CONTRAC12/06/2023
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP09/08/2023
DOB NOWMechanical SystemsPermit IssuedELDOR ELECTRIC LLC02/02/2023
DOB NOWMechanical SystemsPermit IssuedM & J ELECTRICAL CONTRAC01/18/2023
DOB NOWGeneral ConstructionSigned-offM & J ELECTRICAL CONTRAC01/04/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/28/2025
BISOTISSUEDACS SYSTEM ASSOCIATES INC.04/28/2025
BISOTISSUEDACS SYSTEM ASSOCIATES INC.04/25/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/25/2024
BISOTISSUEDACS SYSTEM ASSOCIATES INC.04/24/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/24/2023
BISOTISSUEDACS SYSTEM ASSOCIATES INC.07/27/2022
BISMHISSUEDACS SYSTEM ASSOCIATES INC.07/27/2022
BISOTISSUEDACS SYSTEM ASSOCIATES INC.05/11/2021
BISMHISSUEDON-TRAC CONSTRUCTION ASSO01/27/2021
BISOTISSUEDON-TRAC CONSTRUCTION ASSO01/27/2021
BISPLISSUEDAJIT ONE MECH&GEN'L CONTR01/26/2021
BISSPISSUEDSIRINA FIRE PROT CORP06/15/2020
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/28/2020
BISOTISSUEDACS SYSTEM ASSOCIATES INC.04/28/2020
+ 34 more permits on file
4 projects · most recent 03/16/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Associated Ducts and Piping Others
FiledStatusContractorScopeMake / Model / Capacity
03/16/2026——Heating and Air Conditioning Systems—
01/07/2026Permit IssuedVERNON CONSTR & DEV LLCAir Conditioning Systems, Ventilation Systems
Cooling
Iec FXY06 51,877 BTU · Fan Coil Indoor ×12
Ventilation
Greenheck G-130-VG 1,750 CFM · Exhaust Fan ×6
G-160-VG 2,370 CFM · Exhaust Fan ×2
Panasonic FV-0811VF5 110 CFM · Exhaust Fan ×2
05/01/2024Permit IssuedELDOR ELECTRIC LLCAir Conditioning Systems, Ventilation Systems
Cooling
Carrier 38VMA048 48 BTU · Condensing Unit ×2
Ventilation
Carrier 40VMF048A 1,200 CFM · Fan Coil Indoor ×2
11/10/2022Permit IssuedM & J ELECTRICAL CONTRACAssociated Ducts and Piping, Others
Other
Mitsubishi Electric MODEL#: PUZ-A24NHA7 24,000 BTU · Heat Pump Outdoor ×2
PUZ-A24NHA7 24,000 BTU · Split System ×2
2 projects · most recent 03/16/2026
FiledStatusContractorScope
03/16/2026——10 heads
07/30/2024Signed-offSIRINA FIRE PROT CORP—
2 projects · most recent 03/16/2026
Water/Sanitary
FiledStatusContractorScope
03/16/2026——Water/Sanitary
01/07/2026Permit IssuedTRISTATE PLBG SVCS CORPWater/Sanitary
8 projects · most recent 08/06/2026
General Wiring Lighting
FiledStatusContractorScope
08/06/2026Permit IssuedMULTI-PHASE ELEC'L SVCSGeneral Wiring
12/08/2025Permit IssuedELDOR ELECTRIC LLCGeneral Wiring
03/01/2024Complete5 J'S ELECTL CONTS CORPGeneral Wiring
03/01/2024Complete5 J'S ELECTL CONTS CORPGeneral Wiring
02/21/2024CompleteELDOR ELECTRIC LLCGeneral Wiring
12/23/2022Complete5 J'S ELECTL CONTS CORPGeneral Wiring
04/20/2022CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
09/07/2018CompleteTRU-VAL ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 06/23/2025
Concrete
FiledStatusContractorScope
06/23/2025Permit IssuedRK CONTRACTING INCConcrete
1 project · most recent 03/14/2025
Fence
FiledStatusContractorScope
03/14/2025Permit IssuedRK CONTRACTING INCFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
03/06/2026Fire-Resistant Penetrations and Joints—special
02/27/2026Sprinkler Systems—special
01/23/2026Post-installed AnchorsGEORGE GHEBRYALspecial
01/23/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
01/23/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/23/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
01/23/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/23/2026Mechanical SystemsGEORGE GHEBRYALspecial
01/23/2026FinalGEORGE GHEBRYALprogress
01/20/2026FinalGEORGE GHEBRYALprogress
01/20/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/20/2026Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
01/20/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
01/20/2026Interior lighting powerGEORGE GHEBRYALenergy_progress
01/20/2026Maintenance informationGEORGE GHEBRYALenergy_progress
01/20/2026Lighting controlsGEORGE GHEBRYALenergy_progress
12/04/2025HVAC-R and service water piping design and insulation—energy_progress
12/04/2025Final—progress
12/04/2025Energy Code Compliance Inspections—progress
12/04/2025Post-installed Anchors—special
12/04/2025Fire-Resistant Penetrations and Joints—special
12/04/2025Mechanical Systems—special
12/04/2025Fire-Resistant Penetrations and Joints—special
09/29/2025FinalGEORGE GHEBRYALprogress
09/29/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
Latest 25 of 90.
▾Documents — 420 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch24
08/24/2026X00662587-I1Request digital key ↗
08/23/2026X00677720-P1Request digital key ↗
08/23/2026X00677720-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/21/2026X01085910-I1Request digital key ↗
08/21/2026X01085928-I1Request digital key ↗
08/21/2026X01085919-I1Request digital key ↗
▸Applications & Permits75
▸BISPLAN / WORK APPROVAL APPLICATION48
05/19/2022220410534Open ↗
05/11/2022220410534Open ↗
05/05/2022220410534Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION23
06/03/2019220410534Open ↗
05/16/2019220410525Open ↗
04/23/2019220410534Open ↗
Showing 3 of 23 on file for this type
▸BISPLACE OF ASSEMBLY2
04/20/2017220592561Open ↗
04/20/2017220592589Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/21/2024240094009Open ↗
09/20/2021220486034Open ↗
▸Seals & Professional Certifications121
▸DOB NOWProgress Inspector Seal & Signature34
09/25/2026X00996673-I1Open ↗
09/25/2026X00996673-I1Open ↗
09/02/2026X01085919-I1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
03/23/2020240094009Open ↗
04/23/2019220410534Open ↗
04/23/2019220410534Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/24/2026X00662587-I1Open ↗
08/23/2026X00677763-I1Open ↗
08/23/2026X00677763-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/25/2026X00996673-I1Open ↗
09/02/2026X00677763-I1Open ↗
09/01/2026X00996673-P1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
10/21/2016220410534Open ↗
07/13/2015240104301Open ↗
07/13/2015240104310Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
03/11/2021220410534Open ↗
10/21/2016220410534Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/13/2015240104301Open ↗
07/13/2015240104310Open ↗
04/16/2015240094009Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/13/2015240104301Open ↗
07/13/2015240104310Open ↗
04/16/2015240094009Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/28/2020240094009Open ↗
09/27/2016220551855Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
02/17/2022220410525Open ↗
02/17/2022220410525Open ↗
01/10/2022220410525Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
08/09/2022220410516Open ↗
03/22/2019220389390Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
06/09/2022220410534Open ↗
05/31/2022220410534Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/31/2022220410534Open ↗
▸BISSPRINKLER SYSTEMS1
03/17/2022220410525Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026X00662587-I1Open ↗
08/21/2026X00996673-I1Open ↗
08/21/2026X00996673-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
08/17/2022220410516Open ↗
02/06/2018220380843Open ↗
07/03/2017220429864Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
04/23/2019220410525Open ↗
04/23/2019220410534Open ↗
08/13/2018220551855Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/17/2022220410516Open ↗
04/16/2015240094009Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00677720-I1Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
05/19/2022220410534Open ↗
05/18/2022220410534Open ↗
05/05/2022220410534Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
04/23/2019220410534Open ↗
03/23/2018220551855Open ↗
02/06/2018220380843Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/08/2018220380843Open ↗
07/03/2017220429864Open ↗
▸BISINTERIOR LIGHTING POWER1
05/24/2022220410534Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/13/2015240104310Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/26/2022220410534Open ↗
▸BISLIGHTING CONTROLS1
05/24/2022220410534Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00677720-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/05/2022220410534Open ↗
04/28/2022220410534Open ↗
04/22/2022220410534Open ↗
Showing 3 of 8 on file for this type
▸BIS* EXIT SIGNS1
05/31/2022220410534Open ↗
▸Approvals, Objections & Sign-offs60
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
08/21/2026X00996673-I1Open ↗
08/21/2026X00996673-P1Open ↗
08/21/2026X00859378-I1Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
08/17/2022220410516Open ↗
06/09/2022220410534Open ↗
05/31/2022220410534Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
11/28/2018220679335Open ↗
02/05/2018220380843Open ↗
07/03/2017220429864Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026X00784923-I1Open ↗
08/13/2026X00784996-I1Open ↗
08/13/2026X00784964-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
03/17/2022220410525Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT21
08/16/2022220410516Open ↗
05/31/2022220410534Open ↗
05/31/2022220410534Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/17/2022220410516Open ↗
05/31/2022220410534Open ↗
▸Filing & Intake Forms36
▸BISADDITIONAL INFORMATION13
05/11/2022220410534Open ↗
03/14/2022220410534Open ↗
02/17/2022220410525Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET13
11/28/2018220679335Open ↗
09/27/2016220551855Open ↗
09/27/2016220551855Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM7
02/21/2024240094009Open ↗
03/23/2020240094009Open ↗
01/28/2020240094009Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/13/2015240104301Open ↗
07/13/2015240104310Open ↗
Showing 2 of 3 on file for this type
▸Other Documents3
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION2
05/26/2022220410534Open ↗
05/26/2022220410534Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/16/2015240104310Open ↗