← Back
Over six families without stores
2798 WEBB AVENUE
💬 Discuss this project
2023Year Built
4Stories
C1Building Class
R6Zoning
9,323 sfGross Floor Area
17Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 2798 WEDD AVE LLC · 5,408 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof36p · 1 filing · 20 docs
Penthouse36p · 1 filing · 20 docs
Floor 436p · 1 filing · 20 docs
Floor 331p · 1 filing · 20 docs
Floor 236p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER'S REP503/22/2026
2798 WEDD AVE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/19/2022$1.1M—Private party → 2798 WEDD AVENUE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES501/17/2024
AVISHAY I. MAZOR, P.E.510/29/2023
FL&M ENGINEERING DESIGN &INSPECTION104/21/2023
JRS CONSULTING302/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1303/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCELLENT INTERIOR INCGeneral Contractor1507/08/2026
BB EMPIRE CORPGeneral Contractor603/21/2026
D & W ELECTRICAL CONT CORElectrical303/22/2026
MANHATTAN D ENTERPRISESGeneral Contractor303/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681201/17/2024
Building Lifecycle
All (90)Filed (14)Permit Issued (16)Signed Off (8)Violation (9)Inspection (9)Objection (4)Special Inspection (30)
07/23/2025
Violation issued (HPD, closed)
B
04/25/2025
Violation issued (HPD, closed)
B
04/25/2025
Violation issued (HPD, closed)
B
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/03/2024
Violation issued (HPD, closed)
A
02/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
01/18/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
01/18/2024
Special inspection requirement — Lighting controls
Soorjbally Harilall
01/18/2024
Special inspection requirement — Interior lighting power
Soorjbally Harilall
01/18/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
01/18/2024
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
01/18/2024
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
01/18/2024
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
01/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
01/18/2024
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
01/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
01/18/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Boss
01/18/2024
Special inspection requirement — Masonry
SOORJBALLY HARILALL
01/18/2024
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
01/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
01/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
01/18/2024
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
01/18/2024
Special inspection requirement — Maintenance information
Soorjbally Harilall
01/18/2024
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
01/18/2024
Special inspection requirement — Metering
Soorjbally Harilall
01/18/2024
Special inspection requirement — Fenestration areas
Soorjbally Harilall
01/18/2024
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
01/17/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-A3
01/02/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
01/02/2024
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
01/02/2024
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
01/02/2024
Special inspection requirement — Lighting controls
Soorjbally Harilall
01/02/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Boss
01/02/2024
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
01/02/2024
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
01/02/2024
Special inspection requirement — Metering
Soorjbally Harilall
12/26/2023
Signed off — Alteration
Foundation work type hereby filed to vest for 421A in conjunction with Alt. CO job number: X00640033-I1
X00750254-I1
12/18/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-S3
12/18/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-S2
12/18/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-S6
12/18/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-S1
12/18/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-S5
11/22/2023
Objection resolved — Addressed
10/29/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-P8
10/27/2023
Objection raised — Admin
10/26/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-A2
10/26/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT CONVERTING EXISTING TWO (2) STORY, TWO (2) UNIT BUILDING, INTO A FOUR (4) STORY + PENTHOUSE, SEVENTEEN (17) UNIT RESIDENTIAL BUILDING.
X00640033-P9
10/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/14/2023
Signed off — Alteration
Installation of a temporary construction fence filed in conjunction with ALT-CO: X00640033-I1
X00709567-I1
09/07/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/04/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/28/2023
Permit issued — Sprinklers
X00640033-S2-EW-SP
07/20/2023
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00862633-I1
06/29/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/15/2023
Permit issued — Construction Fence
X00709567-I1-FN
06/15/2023
Permit issued — Mechanical Systems
X00640033-S1-MS
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC08/28/2023
DOB NOWConstruction FenceSigned-offEXCELLENT INTERIOR INC06/15/2023
DOB NOWMechanical SystemsSigned-offEXCELLENT INTERIOR INC06/15/2023
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT INTERIOR INC06/15/2023
DOB NOWPlumbingSigned-offYG SERVICES INC05/15/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/21/2023
DOB NOWFoundationSigned-offEXCELLENT INTERIOR INC02/01/2023
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT INTERIOR INC12/03/2022
DOB NOWStructuralSigned-offEXCELLENT INTERIOR INC12/01/2022
DOB NOWFoundationPermit IssuedEXCELLENT INTERIOR INC12/01/2022
DOB NOWStructuralSigned-offEXCELLENT INTERIOR INC11/15/2022
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT INTERIOR INC11/12/2022
DOB NOWConstruction FenceSigned-offEXCELLENT INTERIOR INC06/21/2022
DOB NOWFoundationPermit IssuedEXCELLENT INTERIOR INC06/21/2022
DOB NOWConstruction FenceSigned-offBB EMPIRE CORP06/13/2022
DOB NOWFoundationPermit IssuedBB EMPIRE CORP06/13/2022
4 projects · most recent 02/21/2024
General Wiring
FiledStatusContractorScope
02/21/2024CompleteD & W ELECTRICAL CONT CORGeneral Wiring
11/06/2023CompleteD & W ELECTRICAL CONT CORGeneral Wiring
11/06/2023CompleteD & W ELECTRICAL CONT COR—
04/24/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 01/17/2024
Steel Concrete
FiledStatusContractorScope
01/17/2024Signed-offA M B MECHANICAL INCSteel, Concrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/27/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/29/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/05/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
01/18/2024Interior lighting powerSoorjbally Harilallenergy_progress
01/18/2024Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
01/18/2024Lighting in dwelling unitsSoorjbally Harilallenergy_progress
01/18/2024Exterior lighting powerSoorjbally Harilallenergy_progress
01/18/2024Fenestration areasSoorjbally Harilallenergy_progress
01/18/2024HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
01/18/2024MeteringSoorjbally Harilallenergy_progress
01/18/2024Air barrier - visual inspectionSoorjbally Harilallenergy_progress
01/18/2024Lighting controlsSoorjbally Harilallenergy_progress
01/18/2024Insulation placement and R valuesSoorjbally Harilallenergy_progress
01/18/2024Maintenance informationSoorjbally Harilallenergy_progress
01/18/2024Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
01/18/2024Fenestration air leakageSoorjbally Harilallenergy_progress
01/18/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
01/18/2024Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
01/18/2024Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
01/18/2024MasonrySOORJBALLY HARILALLspecial
01/18/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
01/18/2024Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
01/18/2024Subsurface Investigations (Borings/Test Pits)Daniel Bossspecial
01/18/2024Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
01/18/2024Subgrade InspectionsSOORJBALLY HARILALLspecial
01/02/2024MeteringSoorjbally Harilallenergy_progress
01/02/2024Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
01/02/2024Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
Latest 25 of 118.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/25/2026X00640033-P8Request digital key ↗
08/25/2026X00640033-P2Request digital key ↗
08/25/2026X00640033-S6Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00640033-P2Open ↗
08/13/2026X00640033-I1Open ↗
08/13/2026X00640033-A2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X00640033-P2Open ↗
08/13/2026X00640033-A3Open ↗
08/13/2026X00640033-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00640033-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWSpecial Inspector Seal & Signature21
08/28/2026X00640033-P2Open ↗
08/28/2026X00640033-P2Open ↗
08/28/2026X00640033-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/28/2026X00640033-P2Open ↗
08/28/2026X00640033-P2Open ↗
08/27/2026X00640033-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/25/2026X00640033-S5Open ↗
08/25/2026X00640033-P8Open ↗
08/25/2026X00640033-P2Open ↗
Showing 3 of 14 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00640033-I1Open ↗
08/13/2026X00640033-A3Open ↗
08/13/2026X00640033-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00640033-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00640033-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00640033-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026X00750254-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00640033-I1Open ↗
08/13/2026X00750254-I1Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT7
08/13/2026X00640033-S6Open ↗
08/13/2026X00640033-P9Open ↗
08/13/2026X00640033-A2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026X00640033-S6Open ↗
08/13/2026X00750254-I1Open ↗
08/13/2026X00640033-I1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026X00640033-I1Open ↗
08/13/2026X00750254-I1Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial4
08/13/2026X00640033-A3Open ↗
08/13/2026X00640033-I1Open ↗
08/13/2026X00640033-A2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00640033-A2Open ↗
08/13/2026X00640033-I1Open ↗
08/13/2026X00640033-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026X00640033-P2Open ↗
08/25/2026X00640033-I1Open ↗
08/25/2026X00640033-A3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X00640033-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00640033-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X00750254-I1Open ↗