ECB04/16/2025REISSUE #35676459L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT CELLAR LEVEL GAS AND ELECTRIC METERS, STEEL BEAM HAS LARGE CRACK IN THE RUSTED STEEL. REMEDY: REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB04/16/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT CELLARLEVEL BY GAS AND ELECTRIC METERS LARGE AMOUNT OF STORAGE, CARDBOARD BOXES AND SUPPLIES. OBSTRUCTING ACCESS TO INSPECT METERS. REMOVE UNLAWFUNothing owed — awaiting certificate of correction
ECB03/11/2025REISSUE #35676460Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT EXP #4(28 STREET SIDE) STUCCO MATERIAL AT PARAPET WALL IS CRACKED AND CRUMBLING. REMEDY: REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB07/18/2024CONTROL PIPING WRONG PIPE SIZE, NO PIGTAIL ON STEAM GAUGE GAS VENTING NEEDS TO BE HARD PIPED DISCHARGE PIPE ON RELIEF VALVE ON WATER HEATER WRONG MATERIAL CORRECT ALL VIOLATING CONDITIONS AND SUMIT A CERTIFICATNothing owed — awaiting certificate of correction
ECB02/08/2024FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT EXP#4(28 STREET SIDE)FACADE STUCCO FINISH AT PARAPET LEVEL LEDGE HAS AN APPROX 1FT IN LENGTH VERTICAL CRACK,WITH SPALLING MATERIAL AROUND THE AREA.Nothing owed — awaiting certificate of correction
ECB02/08/2024REISSUE#35636272P,FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT CELLAR LEVEL ADJACENT TO ELECTRIC & GAS METERS STEEL BEAM ABOVE THE FRESH AIR VENT HAS LARGE CRACKS IN THE CONVETE CASING SECTIONNothing owed — awaiting certificate of correction
ECB02/04/2022FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTED:@CELLAR LEVEL ELECTRICAL&GAS METER RM;STEEL BEAM BY FRESH AIR VENT HAS MASONRY W/LARGE CRACKS,SECS MISSING&ACTIVELY LEAKING.LEAVING STEEL EXPOSED,WHICH ISNothing owed — awaiting certificate of correction