One family attached or semi-detached
28-06 34 AVENUE
QUEENS · BIN 4007312
💬 Discuss this project
1945Year Built
2Stories
A5Building Class
R5Zoning
1,700 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction7p · 1 filing · 13 docs
Floor 1Under Construction12p · 1 filing · 13 docs
Sub-BasementUnder Construction7p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/24/2025$1.6M—— → —$947/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE STUDIO312/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIS RENOVATIONS CORPGeneral Contractor207/08/2026
THOMAS F. CASH & SONS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURE STUDIO3777112/03/2025
Building Lifecycle
All (30)Filed (3)Permit Issued (3)Inspection (3)Objection (10)Special Inspection (11)
07/15/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/12/2026
Permit issued — Mechanical Systems
Q01320338-S2-MS
05/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/23/2026
Objection resolved — Resolved
03/09/2026
Permit issued — Plumbing
Q01320338-S1-PL
03/06/2026
Permit issued — General Construction
Q01320338-I1-GC
01/28/2026
Objection resolved — Addressed
12/29/2025
Objection resolved — Addressed
12/23/2025
Objection raised — Cost
12/22/2025
Objection resolved — Resolved
12/22/2025
Objection resolved — Addressed
12/22/2025
Special inspection requirement — Maintenance information
William Gati
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Gati
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Gati
12/22/2025
Special inspection requirement — Maintenance information
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Gati
12/19/2025
Objection raised — Inspections
12/19/2025
Objection raised — Energy
12/19/2025
Objection raised — Cost
12/19/2025
Objection raised — Structural
12/04/2025
Filed — Alteration
Provide and install a new multi-zone ductless split HVAC system with wall-mounted indoor units at the first floor, second floor, and basement, connected to two new rear-yard Mitsubishi Hyper-Heat outdoor condensing units per mechanical plans.
Q01320338-S1
12/03/2025
Filed — Alteration
Provide and install a new multi-zone ductless split HVAC system with wall-mounted indoor units at the first floor, second floor, and basement, connected to two new rear-yard Mitsubishi Hyper-Heat outdoor condensing units per mechanical plans.
Q01320338-S2
12/02/2025
Filed — Alteration
Provide and install a new multi-zone ductless split HVAC system with wall-mounted indoor units at the first floor, second floor, and basement, connected to two new rear-yard Mitsubishi Hyper-Heat outdoor condensing units per mechanical plans.
Q01320338-I1
11/25/2025
Special inspection requirement — Mechanical Systems
William Gati
11/25/2025
Special inspection requirement — Final
William Gati
11/17/2025
Special inspection requirement — Final
William Gati
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAIS RENOVATIONS CORP05/12/2026
DOB NOWPlumbingSigned-offTHOMAS F. CASH & SONS INC03/09/2026
DOB NOWGeneral ConstructionPermit IssuedAIS RENOVATIONS CORP03/06/2026
1 project · most recent 12/04/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025Permit IssuedAIS RENOVATIONS CORPAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Mitsubishi Electric MSZ-GX18NL 18 BTU · Fan Coil Indoor ×2
MSZ-GX15NL 15 BTU · Fan Coil Indoor ×1
Heat / Cool
Mitsubishi Electric MSZ-GX06NL 6 BTU · Fan Coil Indoor ×2
MSZ-GX09NL 9 BTU · Fan Coil Indoor ×2
MXZ-SM36NLHZ 36 tons · Heat Pump Outdoor ×1
MXZ-SM48NLHZ 48 tons · Heat Pump Outdoor ×1
1 project · most recent 12/04/2025
Water/Sanitary
FiledStatusContractorScope
12/04/2025Signed-offTHOMAS F. CASH & SONS INCWater/Sanitary
1 project · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 12/04/2025
Wood
FiledStatusContractorScope
12/04/2025Permit IssuedAIS RENOVATIONS CORPWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
12/22/2025Maintenance informationWilliam Gatienergy_progress
12/22/2025HVAC-R and service water heating equipmentWilliam Gatienergy_progress
12/22/2025HVAC-R and service water piping design and insulation—energy_progress
12/22/2025HVAC-R and service water heating system controls—energy_progress
12/22/2025HVAC-R and service water heating equipment—energy_progress
12/22/2025HVAC-R and service water piping design and insulationWilliam Gatienergy_progress
12/22/2025Maintenance information—energy_progress
12/22/2025HVAC-R and service water heating system controlsWilliam Gatienergy_progress
11/25/2025Mechanical SystemsWilliam Gatispecial
11/25/2025FinalWilliam Gatiprogress
11/17/2025FinalWilliam Gatiprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01320338-S2Request digital key ↗
08/18/2026Q01320338-I1Request digital key ↗
08/18/2026Q01320338-S1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q01320338-S1Open ↗
08/13/2026Q01320338-S2Open ↗
08/13/2026Q01320338-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026Q01320338-I1Open ↗
08/23/2026Q01320338-S2Open ↗
08/23/2026Q01320338-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01320338-S2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q01320338-I1Open ↗
08/13/2026Q01320338-S1Open ↗
08/13/2026Q01320338-S2Open ↗