Elevator apt, semi-fireproof with stores
The Grove LIC
28-08 38TH AVENUE · BIN 4004659
💬 Discuss this project
2023Year Built
7Stories
D7Building Class
M1-2/R6AZoning
75,772 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized0 Active Violations
Elevator apt, semi-fireproof with stores · Owner of record: Realty 38 · 13,250 sf lot · 5.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRealty 38 LLC127p · 4 filings · 20 docs
BulkheadRealty 38 LLC5p · 2 filings · 20 docs
Floor 7Realty 38 LLC131p · 4 filings · 20 docs
Floor 6Realty 38 LLC130p · 4 filings · 20 docs
Floor 5Realty 38 LLC130p · 4 filings · 20 docs
Floor 4Realty 38 LLC133p · 4 filings · 20 docs
Floor 3Realty 38 LLC133p · 4 filings · 20 docs
Floor 2Realty 38 LLC132p · 4 filings · 20 docs
Floor 1Realty 38 LLC131p · 6 filings · 20 docs
CellarRealty 38 LLC157p · 6 filings · 20 docs
Sub-CellarRealty 38 LLC20p · 1 filing · 15 docs
Site & exteriorRealty 38 LLC103p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Realty 3810807/08/2026
Munder Realty703/21/2026
Smart Consulting NY607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2018$10.2M—MUNDER REALTY CORP. → Realty 38— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering1405/05/2025
Ashraf401/21/2024
Enthink Engineers210/10/2023
Philibert Engineering208/09/2023
Proh Development108/04/2023
Angelo NG & Anthony NG Architects S304/11/2023
HPL Engineering607/05/2022
Associates103/19/2019
Joel Phagoo P.E202/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting4603/21/2026
JM Zoning103/21/2026
A1 Expediting Service403/21/2026
Sierra Safety403/21/2026
S Y Consulting Violations203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IX ConstructionScaffold1007/08/2026
IX ConstructionGeneral Contractor1007/08/2026
345 Management GroupScaffold603/21/2026
Dynamic InstallationScaffold507/08/2026
MPS Plumbing & HeatingFire Protection307/08/2026
Andamio ScaffoldingScaffold307/08/2026
MPS Plumbing & HeatingPlumbing207/08/2026
Goodall ElectricElectrical203/22/2026
Borowide Elect'l ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing3941805/05/2025
Building Lifecycle
All (227)Filed (34)Permit Issued (29)Signed Off (15)Violation (28)Inspection (12)Objection (79)Special Inspection (30)
09/11/2025
Signed off — Alteration
Q00130332-I1
08/08/2025
Signed off — Alteration
PROPOSE SPRINKLER AND STANDPIPE SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00597730-I1
07/11/2025
Signed off — Alteration
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883
Q00525815-I1
06/25/2025
Signed off — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00525832-I1
05/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
05/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
05/22/2025
Special inspection requirement — Maintenance information
Paul Raymond
05/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
05/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
05/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
05/14/2025
Signed off — Alteration
Q00130324-I1
05/09/2025
Signed off — Alteration
Filing for engineering enclosure system in conjunction with Pipe scaffold applicatino #Q00872787
Q00910325-I1
05/05/2025
Filed — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00525832-P6
05/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
05/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
05/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
05/01/2025
Special inspection requirement — Maintenance information
Paul Raymond
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
05/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
05/01/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
04/29/2025
Signed off — Alteration
PROPOSE TO INSTALL NEW DROP CURB, 12 LF AS PER PLAN FILED IN CONJUNCTION WITH NB # 421133883.
Q00553309-I1
04/28/2025
Signed off — Alteration
Q00913130-I1
04/08/2025
Special inspection requirement — Standpipe Systems
Paul Raymond
04/08/2025
Special inspection requirement — Sprinkler Systems
Paul Raymond
03/28/2025
Filed — Alteration
PROPOSE SPRINKLER AND STANDPIPE SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00597730-P4
03/28/2025
Filed — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00525832-P5
03/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
03/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/25/2025
Special inspection requirement — Maintenance information
Paul Raymond
03/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
03/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
03/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
03/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/19/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/07/2025
Signed off — Alteration
FILING FOR TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APP 421133883.
Q00630452-I1
02/28/2025
Filed — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00525832-P4
02/27/2025
Filed — Alteration
PROPOSE SPRINKLER AND STANDPIPE SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00597730-P3
02/20/2025
Special inspection requirement — Sprinkler Systems
Paul Raymond
02/20/2025
Special inspection requirement — Standpipe Systems
Paul Raymond
02/14/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
02/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/14/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/10/2025
Permit issued — Curb Cut
Q00553309-I1-CC
02/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
02/10/2025
Special inspection requirement — Maintenance information
Paul Raymond
02/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
02/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
02/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
01/16/2025
Permit issued — Sprinklers
Q00597730-I1-EW-SP
01/16/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/16/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/28/2024
Permit issued — Construction Fence
Q00913130-I1-FN
10/24/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00869451-I1
10/17/2024
Violation issued (ECB, closed)
Boilers
09/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Filed — Alteration
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883
Q00525815-P2
09/10/2024
Filed — Alteration
PROPOSE SPRINKLER AND STANDPIPE SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00597730-P1
09/10/2024
Filed — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 421133883.
Q00525832-P3
Latest 60 of 227 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offIX Construction02/10/2025
DOB NOWSprinklersSigned-offMPS Plumbing & Heating01/16/2025
DOB NOWConstruction FenceSigned-off345 Management Group10/28/2024
DOB NOWPlumbingSigned-offMPS Plumbing & Heating07/05/2024
DOB NOWConstruction FenceSigned-offIX Construction06/17/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding05/09/2024
DOB NOWMechanical SystemsSigned-offIX Construction04/04/2024
DOB NOWStandpipeSigned-offMPS Plumbing & Heating03/22/2024
DOB NOWSprinklersSigned-offMPS Plumbing & Heating11/21/2023
DOB NOWConstruction FenceSigned-off345 Management Group11/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offIX Construction09/12/2023
DOB NOWConstruction FenceSigned-off345 Management Group08/18/2023
DOB NOWStructuralSigned-offIX Construction06/14/2023
DOB NOWPlumbingSigned-offMPS Plumbing & Heating05/23/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding05/20/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding05/20/2023
DOB NOWConstruction FenceSigned-offIX Construction04/08/2023
DOB NOWFoundationSigned-offIX Construction04/04/2023
DOB NOWSupport of ExcavationSigned-offIX Construction03/30/2023
DOB NOWStructuralSigned-offIX Construction05/27/2022
DOB NOWFoundationSigned-offIX Construction05/27/2022
DOB NOWSupport of ExcavationSigned-offIX Construction05/26/2022
DOB NOWConstruction FenceSigned-offIX Construction05/26/2022
DOB NOWConstruction FenceSigned-offIX Construction05/03/2021
DOB NOWConstruction FenceSigned-offIX Construction07/23/2019
DOB NOWSidewalk ShedSigned-offDynamic Installation07/22/2019
DOB NOWConstruction FenceSigned-offIX Construction03/19/2019
DOB NOWSidewalk ShedSigned-offDynamic Installation02/21/2019
DOB NOWConstruction FenceSigned-offDynamic Installation02/21/2019
BIS—ISSUEDIX Construction02/26/2025
BIS—ISSUEDIX Construction09/17/2024
BIS—ISSUEDIX Construction09/22/2023
BIS—RE-ISSUEDIX Construction05/19/2023
BISEQISSUEDColgate Scaffolding and Equipment04/07/2003
BISEQISSUEDColgate Scaffolding and Equipment04/07/2003
BISEQISSUEDColgate Scaffolding and Equipment09/05/2002
6 projects · most recent 08/14/2025
General Wiring
FiledStatusContractorScope
08/14/2025CompleteKwong Ming Electric—
05/31/2025CompleteGoodall ElectricGeneral Wiring
07/05/2023CompleteGoodall Electric1 meters, 1 new_meters
05/26/2023CompleteBorowide Elect'l Contractors—
05/05/2023CompleteGoodall Electric—
01/31/2019CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/19/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/14/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/14/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/16/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/16/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/07/2023Pass-Final PL - UndergroundPassView ↗
06/02/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
05/22/2025HVAC-R and service water heating equipmentPaul Raymondenergy_progress
05/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
05/22/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/22/2025HVAC-R and service water heating system controlsPaul Raymondenergy_progress
05/22/2025Maintenance informationPaul Raymondenergy_progress
05/22/2025HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
05/22/2025Energy Code Compliance InspectionsPaul Raymondprogress
05/01/2025Energy Code Compliance InspectionsPaul Raymondprogress
05/01/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
05/01/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/01/2025Maintenance informationPaul Raymondenergy_progress
05/01/2025HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
05/01/2025HVAC-R and service water heating system controlsPaul Raymondenergy_progress
05/01/2025HVAC-R and service water heating equipmentPaul Raymondenergy_progress
04/08/2025Sprinkler SystemsPaul Raymondspecial
04/08/2025Standpipe SystemsPaul Raymondspecial
03/25/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/25/2025HVAC-R and service water heating equipmentPaul Raymondenergy_progress
03/25/2025Energy Code Compliance InspectionsPaul Raymondprogress
03/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
03/25/2025Maintenance informationPaul Raymondenergy_progress
03/25/2025HVAC-R and service water heating system controlsPaul Raymondenergy_progress
03/25/2025HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
02/20/2025Sprinkler SystemsPaul Raymondspecial
02/20/2025Standpipe SystemsPaul Raymondspecial
Latest 25 of 83.
▾Documents — 317 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch32
08/29/2026Q00916564-I1Request digital key ↗
08/27/2026Q00525815-P2Request digital key ↗
08/26/2026Q00521584-P1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00130332-I1Request digital key ↗
08/28/2026Q00131850-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00130324-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION30
11/03/2025421133883Open ↗
06/12/2025421133883Open ↗
06/11/2025421133883Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION3
12/20/2023421133883Open ↗
08/17/2023421133883Open ↗
08/03/2019421587312Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
10/04/2021440676715Open ↗
06/16/2021440676715Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
06/16/2021440676715Open ↗
04/20/2021421133883Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/20/2021421133883Open ↗
▸BISVERIFY TAX LOT1
07/22/2025421133883Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/22/2025421133883Open ↗
▸BISZONING DIAGRAM1
10/20/2021421133883Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/20/2021421133883Open ↗
▸BISZONING RESOLUTION DETERMINATION1
10/20/2021421133883Open ↗
▸Seals & Professional Certifications115
▸DOB NOWProgress Inspector Seal & Signature45
08/28/2026Q00525832-P6Open ↗
08/28/2026Q00525832-P6Open ↗
08/28/2026Q00525832-P6Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/28/2026Q00130332-I1Open ↗
08/28/2026Q00131850-I1Open ↗
08/27/2026Q00521600-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
08/29/2026Q00597730-I1Open ↗
08/29/2026Q00597730-I1Open ↗
08/29/2026Q00597730-P3Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/03/2019421587312Open ↗
06/07/2018421587312Open ↗
06/07/2018421622471Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/16/2021440676715Open ↗
▸Trade Schedules & Equipment7
▸BISELECTRIC CUT-OFF2
08/03/2019421587312Open ↗
08/03/2019421587312Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
10/14/2025421133883Open ↗
▸BISSEWER CUT-OFF1
08/03/2019421587312Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
10/20/2021421133883Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/22/2025421133883Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
07/22/2025421133883Open ↗
▸Safety & Tenant Protection15
▸BISSRO MD ANTI-HARASSMENT CHECKLIST4
08/03/2019421587312Open ↗
06/07/2018421587312Open ↗
06/07/2018421622471Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
06/07/2018421587312Open ↗
06/07/2018421622471Open ↗
06/07/2018421622462Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
05/18/2023421133883Open ↗
08/03/2019421587312Open ↗
▸BISSTREET TREE CHECKLIST2
06/16/2021440676715Open ↗
04/20/2021421133883Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
05/18/2023421133883Open ↗
06/16/2021440676715Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/04/2021440676715Open ↗
▸BISSTREET TREE SIGNOFF1
07/22/2025421133883Open ↗
▸Environmental & Asbestos4
▸BISRODENT CONTROL3
08/03/2019421587312Open ↗
08/03/2019421587312Open ↗
08/03/2019421587312Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/03/2019421587312Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/22/2025421133883Open ↗
05/16/2025421133883Open ↗
05/18/2023421133883Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00525815-I1Open ↗
08/13/2026Q00525832-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/16/2025421133883Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/16/2025421133883Open ↗
▸BISFENESTRATION AREAS1
05/16/2025421133883Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/22/2025421133883Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/16/2025421133883Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/16/2025421133883Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/16/2025421133883Open ↗
▸BISELECTRIC MOTORS1
05/16/2025421133883Open ↗
▸BISLIGHTING CONTROLS1
05/16/2025421133883Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/17/2023421133883Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/16/2025421133883Open ↗
05/18/2023421133883Open ↗
10/20/2021421133883Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
07/22/2025421133883Open ↗
05/18/2023421133883Open ↗
▸DOB NOWSOIL REPORT2
08/15/2026Q00521584-I1Open ↗
08/13/2026Q00521584-P1Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/16/2025421133883Open ↗
▸BISSOIL REPORT1
10/20/2021421133883Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/16/2025421133883Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/17/2023421133883Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/20/2021421133883Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00521584-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00521584-I1Open ↗
▸Approvals, Objections & Sign-offs26
▸BISSCHEDULE A - OCCUPANCY / USE14
11/03/2025421133883Open ↗
06/12/2025421133883Open ↗
06/11/2025421133883Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
06/20/2025440676715Open ↗
06/20/2025440676715Open ↗
06/20/2025421133883Open ↗
Showing 3 of 9 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
08/03/2019421587312Open ↗
▸BISFOUNDATION/SOE APPROVAL.1
05/17/2023421133883Open ↗
▸BISLANDMARKS APPROVAL1
08/03/2019421587312Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
12/20/2023421133883Open ↗
08/17/2023421133883Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION4
06/20/2025421133883Open ↗
06/20/2025421133883Open ↗
12/13/2024421133883Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
12/20/2023421133883Open ↗
08/17/2023421133883Open ↗
02/25/2019421622462Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
06/07/2018421587312Open ↗
06/07/2018421622471Open ↗
06/07/2018421622462Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION2
06/16/2021440676715Open ↗
06/16/2021440676715Open ↗
▸BISPLOT DIAGRAM2
07/22/2025421133883Open ↗
04/20/2021421133883Open ↗
▸BISMETERING1
12/03/2025421133883Open ↗
▸BISVESTIBULES1
05/16/2025421133883Open ↗
▸BISMAINTENANCE INFORMATION1
05/16/2025421133883Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
05/16/2025421133883Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00521600-I1Open ↗