← Back
Primarily 3 family with 1 store or office
28-09 8 STREET
QUEENS · BIN 4005565
💬 Discuss this project
1916Year Built
2Stories
S3Building Class
R6AZoning
1,720 sfGross Floor Area
4Units
68 Open Violations 60 unresolved · 8 paperwork only ▸
Primarily 3 family with 1 store or office · Owner of record: PERFECT STONY BROOK, LLC · 2,100 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 2 filings · 20 docs
Floor 63p · 2 filings · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION & DEVELOPMENT503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/11/2022$770K—— → —$448/sf building
04/03/2019$1.2M—Private party → YOU + HOME LLC$671/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC512/22/2025
FL&M ENGINEERING DESIGN &INSPECTION108/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKY HEIGHTS CONSTRUCTIONGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010106/19/2025
Building Lifecycle
All (141)Filed (6)Permit Issued (1)Violation (60)Objection (44)Special Inspection (30)
05/08/2026
Objection resolved — Resolved
01/21/2026
Objection raised — Admin
12/22/2025
Filed — Alteration
INSTALL NEW PLUMBING SYSTEM FOR NEW 6-STORY RESIDENTIAL BUILDING SUBSEQUENT WITH NB JOB#Q01313924-I1
Q01313924-I1
12/19/2025
Objection raised — Other
12/16/2025
Objection raised — Scope
11/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING MIXED-USE 3-STORY BUILDING TO 6-STORY 8-FAMILY MIXED-USE BUILDING AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q00813049-P1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Objection resolved — Addressed
09/05/2025
Permit issued — Sidewalk Shed
Q01262799-I1-SH
08/30/2025
Objection resolved — Addressed
08/30/2025
Objection resolved — Addressed
08/30/2025
Objection resolved — Addressed
08/30/2025
Objection resolved — Addressed
08/30/2025
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
08/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
08/30/2025
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
08/30/2025
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
08/30/2025
Special inspection requirement — Fenestration areas
XIUCHENG LI
08/21/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01262799-I1
07/24/2025
Violation issued (ECB, open)
Construction
07/24/2025
Violation issued (ECB, open)
Construction
07/24/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2025
Violation issued (ECB, open)
Construction
07/18/2025
Objection raised — Structural
07/18/2025
Objection raised — Structural
07/18/2025
Objection raised — Structural
07/18/2025
Objection raised — Energy
07/18/2025
Objection raised — Structural
07/04/2025
Special inspection requirement — Vestibules
07/04/2025
Special inspection requirement — Exterior lighting power
07/04/2025
Special inspection requirement — Metering
07/04/2025
Special inspection requirement — Fenestration air leakage
07/04/2025
Special inspection requirement — Insulation placement and R values
07/04/2025
Special inspection requirement — Air barrier - visual inspection
07/04/2025
Special inspection requirement — Maintenance information
07/04/2025
Special inspection requirement — Air barrier — testing
07/04/2025
Special inspection requirement — Lighting in dwelling units
07/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/04/2025
Special inspection requirement — Concrete - Cast-In-Place
07/04/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
07/04/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/04/2025
Special inspection requirement — Energy Code Compliance Inspections
07/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/04/2025
Special inspection requirement — Lighting controls
07/04/2025
Special inspection requirement — Interior lighting power
07/04/2025
Special inspection requirement — Fenestration areas
07/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/19/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING MIXED-USE 3-STORY BUILDING TO 6-STORY 8-FAMILY MIXED-USE BUILDING AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q00813049-S1
05/28/2025
Violation issued (ECB, open)
Boilers
05/02/2025
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
05/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
05/02/2025
Special inspection requirement — Structural Steel - Details
XIUCHENG LI
05/02/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIUCHENG LI
05/02/2025
Special inspection requirement — Masonry
XIUCHENG LI
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2024
Filed — Alteration
Q01010279-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2023
Violation issued (ECB, open)
Construction
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSKY HEIGHTS CONSTRUCTION09/05/2025
1 project · most recent 12/22/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/22/2025——Storm, Water/Sanitary
2 projects · most recent 10/16/2025
General Wiring
FiledStatusContractorScope
10/16/2025Permit IssuedPROJECT ONE ELECTRIC INCGeneral Wiring
10/02/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 11/26/2025
Steel Concrete
FiledStatusContractorScope
11/26/2025——Steel, Concrete
1 project · most recent 08/21/2025
Sidewalk Shed
FiledStatusContractorScope
08/21/2025Permit IssuedSKY HEIGHTS CONSTRUCTIONSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
08/30/2025Air barrier - visual inspectionXIUCHENG LIenergy_progress
08/30/2025Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
08/30/2025Fenestration air leakageXIUCHENG LIenergy_progress
08/30/2025Insulation placement and R valuesXIUCHENG LIenergy_progress
08/30/2025Fenestration areasXIUCHENG LIenergy_progress
07/04/2025Vestibules—energy_progress
07/04/2025Exterior lighting power—energy_progress
07/04/2025Metering—energy_progress
07/04/2025Fenestration air leakage—energy_progress
07/04/2025Insulation placement and R values—energy_progress
07/04/2025Air barrier - visual inspection—energy_progress
07/04/2025Maintenance information—energy_progress
07/04/2025Air barrier — testing —energy_progress
07/04/2025Lighting in dwelling units—energy_progress
07/04/2025Fire-Resistance Rated Construction—progress
07/04/2025Concrete - Cast-In-Place—special
07/04/2025Construction Operations Influencing Adjacent Structures—special
07/04/2025Exterior Insulation and Finish Systems (EIFS)—special
07/04/2025Fire-Resistant Penetrations and Joints—special
07/04/2025Energy Code Compliance Inspections—progress
07/04/2025Structural Stability – Alterations of existing buildings—special
07/04/2025Lighting controls—energy_progress
07/04/2025Interior lighting power—energy_progress
07/04/2025Fenestration areas—energy_progress
07/04/2025Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 55.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q01010279-I1Request digital key ↗
08/19/2026Q00813049-S3Request digital key ↗
08/19/2026Q01262799-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00813049-I1Open ↗
08/13/2026Q00813049-P1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q01010279-I1Open ↗
08/19/2026Q00813049-P1Open ↗
08/19/2026Q00813049-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q00813049-S1Open ↗
08/24/2026Q00813049-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00813049-S1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00813049-P1Open ↗
08/13/2026Q00813049-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026Q00813049-P1Open ↗
08/15/2026Q00813049-I1Open ↗
08/14/2026Q00813049-S1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q00813049-S1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial3
08/13/2026Q00813049-S1Open ↗
08/13/2026Q00813049-I1Open ↗
08/13/2026Q00813049-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00813049-P1Open ↗
08/13/2026Q00813049-I1Open ↗
08/13/2026Q00813049-S1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026Q00813049-P1Open ↗
08/15/2026Q00813049-I1Open ↗