Three families
28-11 37 STREET
QUEENS · BIN 4010703
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R5BZoning
3,670 sfGross Floor Area
3Units
Three families · 2,503 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Floor 33p · 1 filing · 14 docs
Floor 21p · 1 filing · 13 docs
Floor 13p · 1 filing · 20 docs
2 jobs · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026CompleteKJK ELECTRIC INCGeneral Wiring
10/17/2024Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
Building Lifecycle
All (78)Filed (9)Permit Issued (7)Signed Off (6)Inspection (6)Objection (20)Special Inspection (30)
04/02/2026
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 3 STORY BUILDING WORK IN 3RD FLOOR. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01316066-S1
03/13/2026
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 3 STORY BUILDING WORK IN 3RD FLOOR. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01316066-I1
03/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/24/2025
Permit issued — Plumbing
Q01316066-S1-PL
12/19/2025
Signed off — Alteration
Replacement of (1) existing boiler & (1) existing hot water heater. Replacing with (2) combination boilers.
Q01095788-S1
12/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2025
Permit issued — General Construction
Q01316066-I1-GC-CX
11/26/2025
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 3 STORY BUILDING WORK IN 3RD FLOOR. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01316066-S1
11/25/2025
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 3 STORY BUILDING WORK IN 3RD FLOOR. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01316066-I1
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
11/25/2025
Special inspection requirement — Maintenance information
Eric Sun
11/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
11/25/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
11/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
11/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
11/17/2025
Permit issued — General Construction
Q01317404-I1-GC
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
11/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
11/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
11/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/11/2025
Filed — Alteration
REPAIR STUCCO AND APPLY THOROCOAT ON THE EXTERIOR WALL AS PER PLAN
Q01317404-I1
11/11/2025
Special inspection requirement — Final
FAZAL BANGASH
11/10/2025
Special inspection requirement — Fenestration areas
Eric Sun
11/10/2025
Special inspection requirement — Interior lighting power
Eric Sun
11/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
11/10/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
11/08/2025
Special inspection requirement — Mechanical Systems
Eric Sun
11/08/2025
Special inspection requirement — Final
Eric Sun
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Jacob Stone
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacob Stone
10/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacob Stone
10/23/2025
Filed — Alteration
Replacement of (1) existing boiler & (1) existing hot water heater. Replacing with (2) combination boilers.
Q01095788-P1
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacob Stone
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Jacob Stone
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacob Stone
09/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2025
Signed off — Alteration
Replacement of (1) existing boiler & (1) existing hot water heater. Replacing with (2) combination boilers.
Q01095788-I1
09/12/2025
Permit issued — Mechanical Systems
Q01095788-I1-MS
09/04/2025
Signed off — Alteration
Structural modifications as related to interior renovation of 1st and 2nd floors and exterior renovations as per plans. No change in use, egress, or occupancy.
Q01055315-I1
07/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2025
Permit issued — Plumbing
Q01095788-S1-PL
05/05/2025
Signed off — Alteration
Structural modifications as related to interior renovation of 1st and 2nd floors and exterior renovations as per plans. No change in use, egress, or occupancy.
Q01055315-S1
01/30/2025
Filed — Alteration
Structural modifications as related to interior renovation of 1st and 2nd floors and exterior renovations as per plans. No change in use, egress, or occupancy.
Q01055315-P1
01/28/2025
Special inspection requirement — Post-installed Anchors
Michael Dunham
01/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Dunham
01/28/2025
Special inspection requirement — Final
Michael Dunham
10/15/2024
Filed — Alteration
Replacement of (1) existing boiler & (1) existing hot water heater. Replacing with (2) combination boilers.
Q01095788-S1
10/15/2024
Filed — Alteration
Replacement of (1) existing boiler & (1) existing hot water heater. Replacing with (2) combination boilers.
Q01095788-I1
10/15/2024
Permit issued — General Construction
Q01055315-I1-GC
10/04/2024
Permit issued — Structural
Q01055315-S1-ST
09/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacob Stone
09/13/2024
Objection raised — Other
09/13/2024
Objection resolved — Addressed
09/03/2024
Objection resolved — Addressed
09/03/2024
Objection resolved — Addressed
Latest 60 of 78 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/18/2023$1.9M—— → —$518/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMSTERDAM BUILDERS LLGeneral Contractor707/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
KIANI RESTORATION INCGeneral Contractor104/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758211/26/2025
MARCY ENGINEERING9601310/23/2025
DURODECO ARCHITECTURE AND8584201/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC12/24/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY12/01/2025
DOB NOWGeneral ConstructionPermit IssuedKIANI RESTORATION INC11/17/2025
DOB NOWMechanical SystemsSigned-offNEW AMSTERDAM BUILDERS LL09/12/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS05/19/2025
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM BUILDERS LL10/15/2024
DOB NOWStructuralSigned-offNEW AMSTERDAM BUILDERS LL10/04/2024
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
11/25/2025Fire-Resistant Penetrations and JointsEric Sunspecial
11/25/2025Fire-Resistance Rated ConstructionEric Sunprogress
11/25/2025Energy Code Compliance InspectionsEric Sunprogress
11/25/2025Maintenance informationEric Sunenergy_progress
11/25/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
11/25/2025Fenestration air leakageEric Sunenergy_progress
11/25/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/25/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
11/17/2025Energy Code Compliance InspectionsEric Sunprogress
11/17/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
11/17/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/17/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
11/12/2025Fire-Resistant Penetrations and JointsEric Sunspecial
11/11/2025FinalFAZAL BANGASHprogress
11/10/2025Fenestration areasEric Sunenergy_progress
11/10/2025Interior lighting powerEric Sunenergy_progress
11/10/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
11/10/2025Insulation placement and R valuesEric Sunenergy_progress
11/08/2025Mechanical SystemsEric Sunspecial
11/08/2025FinalEric Sunprogress
10/24/2025Energy Code Compliance InspectionsJacob Stoneprogress
10/24/2025Fire-Resistant Penetrations and JointsJacob Stonespecial
10/24/2025HVAC-R and service water piping design and insulationJacob Stoneenergy_progress
10/21/2025Fire-Resistant Penetrations and JointsJacob Stonespecial
10/21/2025Energy Code Compliance InspectionsJacob Stoneprogress
Latest 25 of 35.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026Q01095788-S1Request digital key ↗
08/21/2026Q01095788-P1Request digital key ↗
08/21/2026Q01095788-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026Q01316066-I1Open ↗
09/23/2026Q01316066-I1Open ↗
09/23/2026Q01316066-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026Q01055315-P1Open ↗
08/21/2026Q01055315-S1Open ↗
08/21/2026Q01055315-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q01316066-I1Open ↗
09/01/2026Q01095788-I1Open ↗
08/29/2026Q01095788-S1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026Q01055315-P1Open ↗
08/21/2026Q01055315-S1Open ↗
08/21/2026Q01055315-I1Open ↗
Showing 3 of 8 on file for this type