Cape Cod
28-19 159 STREET
QUEENS · BIN 4110235
💬 Discuss this project
1920Year Built
1.75Stories
A0Building Class
R2AZoning
1,731 sfGross Floor Area
1Units
Cape Cod · 3,800 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2018$970K—Private party → Private party$560/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/31/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/31/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Inspection (1)Special Inspection (5)
08/11/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/06/2026
Permit issued — Solar
Q01433585-I1-SL
07/31/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01433585-I1
07/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/31/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/20/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/06/2026
1 project · most recent 07/31/2026
FiledStatusContractorScope
07/31/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 07/31/2026
FiledStatusContractorScope
07/31/2026Signed-offSUNRUN INSTALLATION SVC16 panels, 7.2 kw, 168.18 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/11/2026Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/31/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/31/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/20/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/20/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/20/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01433585-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q01433585-I1Open ↗
08/24/2026Q01433585-I1Open ↗
08/24/2026Q01433585-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q01433585-I1Open ↗
08/24/2026Q01433585-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01433585-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01433585-I1Open ↗