← Back
Two family frame
28-22 36 STREET
QUEENS · BIN 4009211
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R5BZoning
2,048 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 1,720 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar1p · 2 filings · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/28/2022$1.1M—Private party → Private party$537/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NARESH MAHANGU108/13/2025
PINTO ENGINEERING CONSULTANT, DPC207/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BROOKLYN SOLARWORKS103/21/2026
JESSIE BONAPARTE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
TOMMY INTERIOR CONTRACTINGeneral Contractor107/08/2026
T.N.T. PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244108/13/2025
PINTO STUDIO INC6366207/18/2022
Building Lifecycle
All (22)Filed (3)Permit Issued (3)Signed Off (3)Violation (5)Inspection (1)Objection (4)Special Inspection (3)
02/19/2026
Signed off — Alteration
Q01268062-I1
08/14/2025
Permit issued — Solar
Q01268062-I1-SL
08/13/2025
Filed — Alteration
Q01268062-I1
11/01/2022
Signed off — Alteration
Limited plumbing work to resolve violations; Remove/cap water & waste for shower installation and gas piping for kitchen plumbing fixtures cellar. Restore to pre-existing conditions.
Q00768009-I1
11/01/2022
Signed off — Alteration
Limited work to resolve an active Violation. Removal of kitchen cabinets and shower of and exist. half bath to restore pre-existing conditions of the cellar space. Plumbing removals are filed under a separate application.
Q00767946-I1
10/28/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/24/2022
Permit issued — Plumbing
Q00768009-I1-PL
08/23/2022
Permit issued — General Construction
Q00767946-I1-GC
07/25/2022
Objection raised — Admin
07/25/2022
Objection resolved — Addressed
07/25/2022
Objection raised — Scope
07/25/2022
Objection resolved — Addressed
07/18/2022
Filed — Alteration
Limited plumbing work to resolve violations; Remove/cap water & waste for shower installation and gas piping for kitchen plumbing fixtures cellar. Restore to pre-existing conditions.
Q00768009-I1
07/18/2022
Filed — Alteration
Limited work to resolve an active Violation. Removal of kitchen cabinets and shower of and exist. half bath to restore pre-existing conditions of the cellar space. Plumbing removals are filed under a separate application.
Q00767946-I1
07/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
06/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
06/30/2022
Special inspection requirement — Final
RENE NAVARRETE
08/15/2016
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
08/15/2007
Violation issued (ECB, closed)
Unknown
04/14/2007
Violation issued (ECB, closed)
Unknown
12/29/2006
Violation issued (ECB, closed)
Quality of Life
12/29/2006
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC08/14/2025
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC10/24/2022
DOB NOWGeneral ConstructionSigned-offTOMMY INTERIOR CONTRACTIN08/23/2022
BISOTISSUEDN/A11/16/2007
1 project · most recent 08/28/2025
FiledStatusContractorScope
08/28/2025CompleteBROOKYLN SOLARWORKS, LLC—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/18/2022Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
06/30/2022Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
06/30/2022FinalRENE NAVARRETEprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00768009-I1Request digital key ↗
08/19/2026Q01268062-I1Request digital key ↗
08/15/2026Q00767946-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/22/2023410010606Open ↗
▸BISWORK PERMIT APPLICATION1
11/16/2007410010606Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00768009-I1Open ↗
08/19/2026Q01268062-I1Open ↗
08/13/2026Q00767946-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00767946-I1Open ↗
08/28/2026Q00768009-I1Open ↗
▸BISPC FULL REPORT1
10/31/2007410010606Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/31/2007410010606Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/31/2007410010606Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/31/2007410010606Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00767946-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00768009-I1Open ↗
08/19/2026Q01268062-I1Open ↗
08/13/2026Q00767946-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/31/2007410010606Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/31/2007410010606Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01268062-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/16/2007410010606Open ↗