← Back
Factory, heavy manufacturing, fireproof
28-30 122 STREET
QUEENS · College Point · BIN 4595543
💬 Discuss this project
1950Year Built
2Stories
F1Building Class
M2-1Zoning
3,047 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: RJR REALTY ASSOCIATES, LLC · 38,749 sf lot · 0.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RJR REALTY2207/08/2026
DEFOE703/22/2026
DESIGN CONCEPT TECHNOLOGIES203/21/2026
NYCEDC103/21/2026
JLJ ENTERPRISES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WALTER T GORMAN PE603/21/2026
GINO O LONGO ARCHITECT1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEFOE CORPGeneral Contractor1107/08/2026
FRESH MEADOW MECH PLBG LLPlumbing207/08/2026
LUND FIRE PRODUCTS CO.INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALTER T. GORMAN, P.E., P268304/14/2022
Building Lifecycle
All (59)Filed (10)Permit Issued (10)Signed Off (5)Violation (9)Inspection (3)Objection (18)Special Inspection (4)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
03/11/2025
Signed off — Alteration
PROPOSED PLUMBING WORK FOR GAS SEWER LINE CONNECTIONS.
Q00439224-I1
05/02/2022
Signed off — Alteration
installation of a new sprinkler system and fire pump in the existing Foam Room.
Q00496687-I1
04/15/2022
Special inspection requirement — Sprinkler Systems
Abbas Family
04/14/2022
Filed — Alteration
installation of a new sprinkler system and fire pump in the existing Foam Room.
Q00496687-P2
04/14/2022
Special inspection requirement — Sprinkler Systems
Abbas Family
03/31/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/14/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2022
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
02/02/2022
Permit issued — Sprinklers
Q00496687-I1-EW-SP
01/19/2022
Filed — Alteration
installation of a new sprinkler system and fire pump in the existing Foam Room.
Q00496687-P1
01/11/2022
Special inspection requirement — Sprinkler Systems
Abbas Family
12/21/2021
Signed off — Alteration
Application filed for a 30'-0" curb cut. Filing in conjunction with ALT-1 application 421611410. No change in bulk, occupancy, use or egress.
Q00077594-I1
12/13/2021
Filed — Alteration
Application filed for a 30'-0" curb cut. Filing in conjunction with ALT-1 application 421611410. No change in bulk, occupancy, use or egress.
Q00077594-P2
09/16/2021
Signed off — Alteration
Application filed for a 30'-0" curb cut. Filing in conjunction with ALT-1 application 421611410. No change in bulk, occupancy, use or egress.
Q00077601-I1
08/10/2021
Signed off — Alteration
CONSTRUCTION WOOD FENCE FILED FOR 397.52 LINEAR FOOT
Q00073906-I1
08/05/2021
Filed — Alteration
PROPOSED PLUMBING WORK FOR GAS SEWER LINE CONNECTIONS.
Q00439224-P1
07/14/2021
Permit issued — Plumbing
Q00439224-I1-PL
05/04/2021
Permit issued — Curb Cut
Q00077594-I1-CC
05/04/2021
Permit issued — Curb Cut
Q00077601-I1-CC
04/12/2021
Filed — Alteration
installation of a new sprinkler system and fire pump in the existing Foam Room.
Q00496687-I1
01/08/2021
Permit issued — Construction Fence
Q00073906-I1-FN
01/07/2021
Permit issued — Plumbing
Q00439224-I1-PL
12/14/2020
Filed — Alteration
PROPOSED PLUMBING WORK FOR GAS SEWER LINE CONNECTIONS.
Q00439224-I1
10/02/2020
Permit issued — Construction Fence
Q00073906-I1-FN
09/18/2020
Violation issued (ECB, closed)
Construction
09/18/2020
Violation issued (ECB, closed)
Construction
09/18/2020
Violation issued (ECB, closed)
Construction
08/25/2020
Permit issued — Construction Fence
Q00073906-I1-FN
06/04/2020
Permit issued — Construction Fence
Q00073906-I1-FN
01/16/2020
Violation issued (ECB, closed)
Cranes and Derricks
01/16/2020
Violation issued (ECB, closed)
Construction
01/16/2020
Violation issued (ECB, closed)
Site Safety
01/16/2020
Violation issued (ECB, closed)
Site Safety
11/07/2019
Permit issued — Construction Fence
Q00073906-I1-FN
08/09/2019
Objection resolved — Addressed
06/03/2019
Objection raised — Scope
05/30/2019
Filed — Alteration
Application filed for a 30'-0" curb cut. Filing in conjunction with ALT-1 application 421611410. No change in bulk, occupancy, use or egress.
Q00077594-P1
05/15/2019
Objection resolved — Addressed
01/04/2019
Objection resolved — Addressed
01/04/2019
Objection resolved — Addressed
01/04/2019
Objection resolved — Addressed
09/10/2018
Filed — Alteration
Application filed for a 30'-0" curb cut. Filing in conjunction with ALT-1 application 421611410. No change in bulk, occupancy, use or egress.
Q00077594-I1
09/10/2018
Filed — Alteration
Application filed for a 30'-0" curb cut. Filing in conjunction with ALT-1 application 421611410. No change in bulk, occupancy, use or egress.
Q00077601-I1
09/10/2018
Objection raised — CC_other
09/10/2018
Objection resolved — Addressed
09/10/2018
Objection raised — 2014-CC BC 3202.2.2.4.1
09/10/2018
Objection raised — AC 2014-CC AC 28-104.7
09/10/2018
Objection resolved — Addressed
09/10/2018
Objection raised — AC 2014-CC AC 28-104.7
09/10/2018
Objection raised — CC_other
09/10/2018
Objection raised — 2014, DOT 2010-CC BC 3201.9 D
09/10/2018
Objection resolved — Addressed
09/10/2018
Objection raised — 2014, DOT 2010-CC BC 3201.9 D
09/10/2018
Objection raised — 2014-CC BC 3202.2.2.4.1
09/10/2018
Objection resolved — Addressed
08/27/2018
Filed — Alteration
CONSTRUCTION WOOD FENCE FILED FOR 397.52 LINEAR FOOT
Q00073906-I1
08/24/2018
Special inspection requirement — Final
GINO LONGO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offLUND FIRE PRODUCTS CO.INC02/02/2022
DOB NOWPlumbingSigned-offMICHAEL BURNS P&H CORP07/14/2021
DOB NOWCurb CutSigned-offDEFOE CORP05/04/2021
DOB NOWCurb CutSigned-offDEFOE CORP05/04/2021
DOB NOWConstruction FenceSigned-offDEFOE CORP01/08/2021
DOB NOWPlumbingSigned-offMICHAEL BURNS P&H CORP01/07/2021
DOB NOWConstruction FenceSigned-offDEFOE CORP10/02/2020
DOB NOWConstruction FenceSigned-offDEFOE CORP08/25/2020
DOB NOWConstruction FenceSigned-offDEFOE CORP06/04/2020
DOB NOWConstruction FenceSigned-offDEFOE CORP11/07/2019
BISPLISSUEDFRESH MEADOW MECH PLBG LL07/12/2021
BIS—ISSUEDDEFOE CORP03/16/2021
BISOTISSUEDDEFOE CORP12/29/2020
BIS—ISSUEDDEFOE CORP10/01/2020
BIS—ISSUEDDEFOE CORP10/01/2020
BISPLISSUEDFRESH MEADOW MECH PLBG LL05/13/2020
BIS—ISSUEDDEFOE CORP10/02/2019
BIS—ISSUEDDEFOE CORP10/02/2019
BIS—ISSUEDDEFOE CORP05/14/2019
BIS—ISSUEDDEFOE CORP05/09/2019
BIS—ISSUEDDEFOE CORP05/09/2019
BISCCISSUEDJLJ IV ENTERPRISES INC12/28/2015
BIS—ISSUEDJLJ ENTERPRISES04/15/2014
1 project · most recent 08/03/2018
General Wiring
FiledStatusContractorScope
08/03/2018Permit IssuedEMPIRE ELECTRIC NYC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/31/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/14/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/24/2022Fail-Final SP - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/15/2022Sprinkler SystemsAbbas Familyspecial
04/14/2022Sprinkler SystemsAbbas Familyspecial
01/11/2022Sprinkler SystemsAbbas Familyspecial
08/24/2018FinalGINO LONGOprogress
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch6
08/28/2026Q00073906-I1Request digital key ↗
08/26/2026Q00496687-P2Request digital key ↗
08/26/2026Q00496687-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut3
08/28/2026Q00077594-P2Request digital key ↗
08/15/2026Q00077594-I1Request digital key ↗
08/15/2026Q00077594-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00439224-I1Request digital key ↗
08/15/2026Q00439224-P1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION16
11/13/2023421611410Open ↗
11/08/2023421611410Open ↗
11/03/2023421611410Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION9
05/14/2020421611410Open ↗
10/03/2019421611410Open ↗
10/03/2019421611410Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
02/25/2022421611410Open ↗
05/15/2014420964077Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
07/16/2014420964068Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/02/2025421611410Open ↗
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/07/2020421611410Open ↗
05/08/2019421611410Open ↗
05/08/2019421611410Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00073906-I1Open ↗
08/28/2026Q00077601-I1Open ↗
08/28/2026Q00077594-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/29/2015421247537Open ↗
04/22/2014420964077Open ↗
04/14/2014420964077Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026Q00496687-I1Open ↗
08/27/2026Q00496687-P2Open ↗
08/25/2026Q00496687-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/29/2015421247537Open ↗
04/14/2014420964077Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/28/2020440656274Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q00073906-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
11/13/2023421611410Open ↗
11/08/2023421611410Open ↗
11/03/2023421611410Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/13/2018421611410Open ↗
07/20/2018421611410Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/04/2024421611410Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/04/2024421611410Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
12/22/2018421611410Open ↗
04/14/2014420964077Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00496687-P2Open ↗
08/13/2026Q00496687-P1Open ↗
08/13/2026Q00496687-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/22/2018421611410Open ↗
07/26/2018421611410Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/12/2024421611410Open ↗
02/05/2024421611410Open ↗
12/17/2020440656274Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/08/2019421611410Open ↗
12/22/2018421611410Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/05/2025440656274Open ↗
02/05/2024421611410Open ↗
▸BISLIGHTING CONTROLS1
03/04/2024421611410Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/04/2024421611410Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/12/2024421611410Open ↗
▸BISINTERIOR LIGHTING POWER1
03/04/2024421611410Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/24/2025440656274Open ↗
03/04/2024421611410Open ↗
02/12/2024421611410Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
05/08/2019421611410Open ↗
05/08/2019421611410Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
11/11/2025440656274Open ↗
03/04/2024421611410Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
11/11/2025440656274Open ↗
03/04/2024421611410Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
12/26/2025440656274Open ↗
01/15/2025421611410Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/04/2024421611410Open ↗
▸BISMASONRY1
03/04/2024421611410Open ↗
▸BISDEEP FOUNDATIONS / PILES1
03/04/2024421611410Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/04/2024421611410Open ↗
▸BISMECHANICAL SYSTEMS1
03/04/2024421611410Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/08/2019421611410Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/12/2024421611410Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/04/2024421611410Open ↗
▸BISPROVIDE FINAL INSPECTION1
12/26/2025440656274Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/04/2024421611410Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/28/2020440656274Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/04/2024421611410Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/04/2024421611410Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/26/2025440656274Open ↗
05/20/2016420964077Open ↗
05/02/2016420964077Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/06/2019421611410Open ↗
05/08/2019421611410Open ↗
04/22/2014420964077Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
12/13/2018421611410Open ↗
04/14/2014420964077Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/14/2014420964068Open ↗
04/14/2014420964077Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE2
10/03/2019421611410Open ↗
05/20/2019421611410Open ↗
▸BISCOST AFFIDAVIT2
12/17/2020440656274Open ↗
12/22/2018421611410Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
03/31/2025440656274Open ↗
01/02/2025421611410Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
02/29/2016420964077Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
07/20/2018421611410Open ↗
03/29/2018421611410Open ↗
12/29/2015421247537Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
12/05/2023421611410Open ↗
03/21/2022421611410Open ↗
08/14/2019421611410Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/28/2020440656274Open ↗
▸Other Documents8
▸BISPLOT DIAGRAM2
03/29/2018421611410Open ↗
01/11/2016420964077Open ↗
▸BISSHUTOFF DAMPERS2
03/04/2024421611410Open ↗
03/04/2024421611410Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
03/04/2024421611410Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/11/2019421611410Open ↗
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
03/04/2024421611410Open ↗
▸BISMAINTENANCE INFORMATION1
03/04/2024421611410Open ↗