← Back
Two family frame
28 BALSAM PLACE
STATEN ISLAND · Arden Heights-Rossville · BIN 5103188
💬 Discuss this project
1989Year Built
2Stories
B2Building Class
R3XZoning
2,741 sfGross Floor Area
2Units
Two family frame · 4,620 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR109/26/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281109/26/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/15/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 13 Panels, 5.33 kW
S01117657-I1
09/30/2024
Permit issued — Solar
S01117657-I1-SL
09/26/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 13 Panels, 5.33 kW
S01117657-I1
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
09/26/2024
Special inspection requirement — Final
Mina Makar
09/26/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR09/30/2024
1 project · most recent 09/26/2024
FiledStatusContractorScope
09/26/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/26/2024Fire-Resistant Penetrations and JointsMina Makarspecial
09/26/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
09/26/2024Energy Code Compliance InspectionsMina Makarprogress
09/26/2024FinalMina Makarprogress
09/26/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01117657-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026S01117657-I1Open ↗
08/22/2026S01117657-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01117657-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026S01117657-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01117657-I1Open ↗