← Back
Walk-up cooperative
28 CLAVER PLACE
BROOKLYN · BIN 3057296
💬 Discuss this project
1930Year Built
4Stories
C6Building Class
R6BZoning
9,860 sfGross Floor Area
8Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 28 CLAVER PL/HDFC · 4,471 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL CONSTRUCTION1007/08/2026
28 CLAVER PL/HDFC103/22/2026
OWNER OF 28 CLAVER PLACE103/22/2026
28 CLAVER PLACE HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC308/29/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL CONSTRUCTION LLCGeneral Contractor407/08/2026
Building Lifecycle
All (20)Filed (3)Permit Issued (2)Signed Off (2)Violation (11)Special Inspection (2)
05/04/2026
Violation issued (HPD, open)
A
04/09/2024
Violation issued (HPD, closed)
A
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2023
Violation issued (HPD, closed)
A
09/20/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00769733-I1
09/20/2022
Signed off — Alteration
B00798939-I1
08/30/2022
Permit issued — Sidewalk Shed
B00798939-I1-SH
08/29/2022
Filed — Alteration
B00798939-I1
08/29/2022
Special inspection requirement — Final
Sunil Saigal
08/24/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00769733-P1
08/24/2022
Special inspection requirement — Final
Sunil Saigal
07/08/2022
Permit issued — Supported Scaffold
B00769733-I1-SF
07/07/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00769733-I1
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/1992
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC08/30/2022
DOB NOWSupported ScaffoldSigned-offSTEEL CONSTRUCTION LLC07/08/2022
1 project · most recent 09/08/2022
FiledStatusContractorScope
09/08/2022CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/29/2022FinalSunil Saigalprogress
08/24/2022FinalSunil Saigalprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00769733-P1Request digital key ↗
08/29/2026B00769733-I1Request digital key ↗
08/28/2026B00798939-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00769733-I1Open ↗
08/29/2026B00769733-P1Open ↗
08/28/2026B00798939-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B00769733-I1Open ↗
08/30/2026B00798939-I1Open ↗