← Back
Banking facility, with or without parking
28 EAST 170 STREET
BRONX · Mount Eden-Claremont (West) · BIN 2008075
💬 Discuss this project
1962Year Built
2Stories
K7Building Class
R8AZoning
12,960 sfGross Floor Area
1Units
2 Open Violations ▸
Banking facility, with or without parking · Owner of record: 30 EAST 170TH STREET ACQUISITIONS LLC · 4,424 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionEquipment
Roof2p · 1 filing · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 18p · 5 filings · 20 docs
Cellar5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACHS MANAGMENT2107/08/2026
REPUBLIC SCAFFOLD & HOIST CORP1103/22/2026
PONCE DE LEON FEDERAL SAV103/22/2026
PONCE DE LEON FEDERAL BAN103/22/2026
30 E 170TH ST ACQUISITIONS403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/27/2020$4.7M—— → —$366/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGER DE ELECTRIC CO.804/05/2021
LEON SKVIRSKY PE203/02/2021
ASHRAF CORP312/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
REX A HEUERMANN ARCHITECT P C1603/21/2026
EUROCELT EXPEDITING, INC603/21/2026
BUILDING BROTHERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM ASSOCIATES CONSTR LLCGeneral Contractor607/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor603/21/2026
ACTIVE SIGNSScaffold207/08/2026
F.S. SITE CORPFire Protection107/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
OM ELECTRIC, INCElectrical103/22/2026
F.S. SITE CORPPlumbing107/08/2026
FIVE BOROUGH ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519904/05/2021
Building Lifecycle
All (91)Filed (13)Permit Issued (10)Signed Off (8)Violation (30)Special Inspection (30)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/29/2021
Signed off — Alteration
INSTALLATION OF A CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00423542-I1
12/29/2021
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00423536-I1
10/07/2021
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN SIGN (FOOT LOCKER)
X00468566-I1
10/06/2021
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FOOT LOCKER)
X00443758-I1
04/26/2021
Signed off — Alteration
Plumbing work includes removal of plumbing fixtures, addition of new plumbing fixtures & sanitary piping connected to existing building water supply at Cellar level through 2nd floor Retail space and Stock Area. No change in occupancy, use or egress.
X00392515-I1
04/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/05/2021
Filed — Alteration
Plumbing work includes removal of plumbing fixtures, addition of new plumbing fixtures & sanitary piping connected to existing building water supply at Cellar level through 2nd floor Retail space and Stock Area. No change in occupancy, use or egress.
X00392515-P2
04/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/10/2021
Signed off — Alteration
Mechanical work includes new Roof Top Units and new duct distribution throughout building to provide ventilation to Retail space and Stock Area. Area of work includes Cellar through Roof. No change in use, egress or occupancy under this application.
X00385694-I1
03/10/2021
Permit issued — Sign
X00468566-I1-SG
03/10/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
03/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/10/2021
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/10/2021
Special inspection requirement — Final
NAVEEN KUMAR
03/10/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/10/2021
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
03/10/2021
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
03/10/2021
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
03/09/2021
Filed — Alteration
Mechanical work includes new Roof Top Units and new duct distribution throughout building to provide ventilation to Retail space and Stock Area. Area of work includes Cellar through Roof. No change in use, egress or occupancy under this application.
X00385694-P1
03/02/2021
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN SIGN (FOOT LOCKER)
X00468566-I1
03/01/2021
Signed off — Alteration
Sprinkler work includes new 4 Sprinkler Service to building, new 2 drain riser, new 3 floor control valves, and new branch piping and sprinkler head distribution throughout Cellar through 2nd floor.. No change in use, occupancy or egress.
X00392672-I1
03/01/2021
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/01/2021
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
03/01/2021
Special inspection requirement — Final
NAVEEN KUMAR
03/01/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/01/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
03/01/2021
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
03/01/2021
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
03/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/05/2021
Signed off — Alteration
Structural work, removal of existing floor slab, new access stair between 1st and 2nd Fl. retail space. Area of work includes CEL thru 2nd FL. No change in use egress and occupancy
X00390908-I1
01/13/2021
Permit issued — Sign
X00443758-I1-SG
01/06/2021
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FOOT LOCKER)
X00443758-I1
12/22/2020
Special inspection requirement — Final
LEON SKVIRSKY
12/18/2020
Special inspection requirement — Final
Eric Foster
12/15/2020
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00423536-P1
12/08/2020
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
12/08/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/07/2020
Filed — Alteration
Sprinkler work includes new 4 Sprinkler Service to building, new 2 drain riser, new 3 floor control valves, and new branch piping and sprinkler head distribution throughout Cellar through 2nd floor.. No change in use, occupancy or egress.
X00392672-P1
12/02/2020
Permit issued — Structural
X00390908-I1-ST
12/02/2020
Permit issued — Mechanical Systems
X00385694-I1-MS
12/01/2020
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
12/01/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/11/2020
Permit issued — Mechanical Systems
X00385694-I1-MS
11/10/2020
Filed — Alteration
Plumbing work includes removal of plumbing fixtures, addition of new plumbing fixtures & sanitary piping connected to existing building water supply at Cellar level through 2nd floor Retail space and Stock Area. No change in occupancy, use or egress.
X00392515-P1
11/10/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/05/2020
Permit issued — Construction Fence
X00423542-I1-FN
11/05/2020
Permit issued — Sidewalk Shed
X00423536-I1-SH
11/04/2020
Filed — Alteration
INSTALLATION OF A CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00423542-I1
11/04/2020
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00423536-I1
11/04/2020
Special inspection requirement — Final
Eric Foster
10/26/2020
Filed — Alteration
Mechanical work includes new Roof Top Units and new duct distribution throughout building to provide ventilation to Retail space and Stock Area. Area of work includes Cellar through Roof. No change in use, egress or occupancy under this application.
X00385694-I1
10/14/2020
Permit issued — Plumbing
X00392515-I1-PL
10/14/2020
Permit issued — Structural
X00390908-I1-ST
10/14/2020
Permit issued — Sprinklers
X00392672-I1-EW-SP
09/23/2020
Filed — Alteration
Plumbing work includes removal of plumbing fixtures, addition of new plumbing fixtures & sanitary piping connected to existing building water supply at Cellar level through 2nd floor Retail space and Stock Area. No change in occupancy, use or egress.
X00392515-I1
09/23/2020
Filed — Alteration
Sprinkler work includes new 4 Sprinkler Service to building, new 2 drain riser, new 3 floor control valves, and new branch piping and sprinkler head distribution throughout Cellar through 2nd floor.. No change in use, occupancy or egress.
X00392672-I1
09/23/2020
Filed — Alteration
Structural work, removal of existing floor slab, new access stair between 1st and 2nd Fl. retail space. Area of work includes CEL thru 2nd FL. No change in use egress and occupancy
X00390908-I1
08/31/2020
Special inspection requirement — Sprayed fire-resistant materials
Younes Abouyaala
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offACTIVE SIGNS INC03/10/2021
DOB NOWSignSigned-offACTIVE SIGNS INC01/13/2021
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC12/02/2020
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC12/02/2020
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC11/11/2020
DOB NOWConstruction FenceSigned-offREPUBLIC SCAFFOLD&HOIST C11/05/2020
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C11/05/2020
DOB NOWPlumbingSigned-offALAN J BRUTOSKY PLBR CONT10/14/2020
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC10/14/2020
DOB NOWSprinklersSigned-offALAN J. BRUTOSKY PLBG CON10/14/2020
BIS—ISSUEDMJM ASSOCIATES CONSTR LLC12/16/2020
BISOTISSUEDJ G N CONSTRUCTION CORP.07/22/1994
BISEQISSUEDJ G N CONSTRUCTION CORP.07/22/1994
5 projects · most recent 11/29/2021
General Wiring
FiledStatusContractorScope
11/29/2021CompleteOM ELECTRIC, INCGeneral Wiring
07/01/2021CompleteSTAR ELEC'L CONTRACTORS C—
01/11/2021CompleteFIVE BOROUGH ELECTRIC INCGeneral Wiring
01/07/2021CompleteRAINBOW ELECTRIC CO., INC—
11/04/2020CompleteNASH ELECTRIC SERVICES IN—
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/08/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/02/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/10/2021Maintenance informationYounes Abouyaalaenergy_progress
03/10/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/10/2021Mechanical SystemsYounes Abouyaalaspecial
03/10/2021FinalNAVEEN KUMARprogress
03/10/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/10/2021HVAC and service water heating system controls Younes Abouyaalaenergy_progress
03/10/2021HVAC insulation and sealing Younes Abouyaalaenergy_progress
03/10/2021HVAC and service water heating equipment Younes Abouyaalaenergy_progress
03/01/2021Mechanical SystemsYounes Abouyaalaspecial
03/01/2021HVAC and service water heating equipment Younes Abouyaalaenergy_progress
03/01/2021FinalNAVEEN KUMARprogress
03/01/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/01/2021Maintenance informationYounes Abouyaalaenergy_progress
03/01/2021HVAC insulation and sealing Younes Abouyaalaenergy_progress
03/01/2021HVAC and service water heating system controls Younes Abouyaalaenergy_progress
03/01/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/22/2020FinalLEON SKVIRSKYprogress
12/18/2020FinalEric Fosterprogress
12/08/2020Sprinkler SystemsYounes Abouyaalaspecial
12/08/2020Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/01/2020Sprinkler SystemsYounes Abouyaalaspecial
12/01/2020Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/10/2020Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 32.
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00392515-I1Request digital key ↗
08/15/2026X00392515-P2Request digital key ↗
08/15/2026X00392515-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026X00392672-I1Request digital key ↗
08/15/2026X00392672-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
08/25/2026X00443758-I1Request digital key ↗
08/25/2026X00468566-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026X00385694-I1Request digital key ↗
08/15/2026X00385694-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/25/2026X00423536-I1Request digital key ↗
08/15/2026X00423536-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026X00468566-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026X00390908-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026X00423542-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
03/02/2021240284688Open ↗
02/17/2021240284688Open ↗
09/22/2020240284688Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/21/2021240284688Open ↗
▸BISWORK PERMIT APPLICATION1
12/16/2020240284688Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
03/22/2022240284688Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature16
09/25/2026X00423542-I1Open ↗
09/18/2026X00385694-I1Open ↗
09/18/2026X00385694-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/22/2026X00392672-I1Open ↗
09/22/2026X00392672-I1Open ↗
09/18/2026X00385694-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026X00390908-I1Open ↗
08/26/2026X00392672-I1Open ↗
08/25/2026X00385694-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/07/2020200784142Open ↗
01/07/2020200784142Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/22/2020240284688Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/22/2020240284688Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/22/2020240284688Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/15/2020240284688Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
01/04/2021240284688Open ↗
▸BISSTREET TREE CHECKLIST1
03/22/2022240284688Open ↗
▸Environmental & Asbestos26
▸DOB NOWOER: Notice to Proceed10
08/26/2026X00392672-I1Open ↗
08/25/2026X00423536-I1Open ↗
08/25/2026X00392515-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026X00390908-I1Open ↗
08/26/2026X00392672-I1Open ↗
08/25/2026X00385694-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026X00392672-I1Open ↗
08/13/2026X00392515-I1Open ↗
08/13/2026X00468566-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
10/07/2021240284688Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
09/22/2020240284688Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/22/2020240284688Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/22/2020240284688Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/01/2022240284688Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/22/2020240284688Open ↗
▸Inspections & Test Reports2
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/25/2022240284688Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/22/2020240284688Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCONSTRUCTION CODE DETERMINATION3
12/09/2020240284688Open ↗
12/08/2020240284688Open ↗
12/02/2020240284688Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/07/2020200784142Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/17/2021240284688Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/22/2020240284688Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/07/2021240284688Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION7
03/22/2022240284688Open ↗
03/22/2022240284688Open ↗
03/22/2022240284688Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
03/20/2020200288875Open ↗
01/07/2020200784142Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2020240284688Open ↗
▸Other Documents1
▸BISHPD: COMPLETION NOTICE1
10/07/2021240284688Open ↗