← Back
Two family frame
28 FURMAN STREET
STATEN ISLAND · BIN 5080446
💬 Discuss this project
1978Year Built
2Stories
B2Building Class
R3XZoning
2,668 sfGross Floor Area
2Units
Two family frame · 10,360 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 22p · 2 filings · 16 docs
Floor 11p · 1 filing · 10 docs
Cellar1p · 1 filing · 10 docs
2 jobs · most recent 08/31/2024
General Wiring
FiledStatusContractorScope
08/31/2024CompleteHI VOLTAGE ELECTRIC INCGeneral Wiring
11/02/2023CompleteHI VOLTAGE ELECTRIC INC1 meters
Building Lifecycle
All (23)Filed (5)Permit Issued (4)Signed Off (4)Inspection (5)Objection (2)Special Inspection (3)
01/21/2025
Signed off — Alteration
INSTALLATION SANITARY PLUMBING FIXTURES, GAS FIXTURES WITH ASSOCIATED PIPING FOR BOTH AND INSTALL A DRYWELL WITH ASSOCIATED PIPING AND YARD DRAINS.
S00866107-I1
01/03/2025
Signed off — Alteration
CONSTRUCTION OF A ONE STORY ADDITION TO THE REAR OF THE HOUSE TO CREATE A THREE PIECE BATHROOM, A NEW ROOFED PATIO ALL LOCATED TO THE REAR OF THE HOUSE.
S00866419-I1
11/25/2024
Signed off — Alteration
S00925663-I1
11/04/2024
Filed — Alteration
INSTALLATION SANITARY PLUMBING FIXTURES, GAS FIXTURES WITH ASSOCIATED PIPING FOR BOTH AND INSTALL A DRYWELL WITH ASSOCIATED PIPING AND YARD DRAINS.
S00866107-P1
09/23/2024
Signed off — Alteration
INSTALLATION OF A CONSTRUCTION FENCE.
S00922254-I1
08/02/2024
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
04/09/2024
Inspection — Certified Gas-Gas-Piping-Underground
Certified
View inspection ↗
04/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/10/2024
Permit issued — General Construction
S00866419-I1-GC
11/17/2023
Objection resolved — Addressed
11/06/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/03/2023
Objection raised — Scope
10/13/2023
Filed — Alteration
CONSTRUCTION OF A ONE STORY ADDITION TO THE REAR OF THE HOUSE TO CREATE A THREE PIECE BATHROOM, A NEW ROOFED PATIO ALL LOCATED TO THE REAR OF THE HOUSE.
S00866419-I1
10/13/2023
Permit issued — General Construction
S00925663-I1-GC
10/11/2023
Permit issued — Plumbing
S00866107-I1-PL
09/05/2023
Permit issued — Construction Fence
S00922254-I1-FN
08/28/2023
Filed — Alteration
INSTALLATION SANITARY PLUMBING FIXTURES, GAS FIXTURES WITH ASSOCIATED PIPING FOR BOTH AND INSTALL A DRYWELL WITH ASSOCIATED PIPING AND YARD DRAINS.
S00866107-I1
08/28/2023
Filed — Alteration
S00925663-I1
08/28/2023
Filed — Alteration
INSTALLATION OF A CONSTRUCTION FENCE.
S00922254-I1
08/28/2023
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
08/28/2023
Special inspection requirement — Subgrade Inspections
Steven Savino
08/28/2023
Special inspection requirement — Final
Steven Savino
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC511/04/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FUGGETTA CONTRACTING CORPGeneral Contractor207/08/2026
PANACEA CONTRACTING CORPGeneral Contractor107/08/2026
CAPITAL CONTR P&H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216210/13/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPANACEA CONTRACTING CORP01/10/2024
DOB NOWGeneral ConstructionSigned-offFUGGETTA CONTRACTING CORP10/13/2023
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP10/11/2023
DOB NOWConstruction FenceSigned-offFUGGETTA CONTRACTING CORP09/05/2023
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/02/2024Pass-Final Fence Non-Directive 14PassView ↗
04/09/2024Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
04/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/28/2023Concrete - Cast-In-PlaceSteven Savinospecial
08/28/2023Subgrade InspectionsSteven Savinospecial
08/28/2023FinalSteven Savinoprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026S00925663-I1Request digital key ↗
08/22/2026S00922254-I1Request digital key ↗
08/20/2026S00866107-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00866419-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00866419-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026S00922254-I1Open ↗
08/13/2026S00925663-I1Open ↗
08/13/2026S00866107-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S00925663-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026S00925663-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026S00866419-I1Open ↗
08/13/2026S00866107-P1Open ↗
08/13/2026S00866107-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00866419-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00866419-I1Open ↗
▸Other Documents3
▸DOB NOWPlot Diagram1
08/13/2026S00866419-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00866419-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00866419-I1Open ↗