Two family frame
28 MACFARLAND AVENUE
STATEN ISLAND · BIN 5045531
💬 Discuss this project
1931Year Built
2Stories
B2Building Class
R3-1Zoning
3,456 sfGross Floor Area
2Units
6 Active Violations ▸FDNY Report ↗
Two family frame · 5,000 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Rear extension replacementUnder Construction17p · 1 filing · 20 docs
CellarRear extension replacementUnder Construction15p · 1 filing · 20 docs
Site & exteriorRear extension replacementUnder Construction19p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Niza Works of Architecture707/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Niza Works of Architecture703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tino ConstructionScaffold603/21/2026
StructurelineGeneral Contractor203/21/2026
UpstrateGeneral Contractor203/21/2026
HM Build and UpliftGeneral Contractor107/08/2026
HM Build and UpliftScaffold109/15/2026
StructurelineScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jian Engineering7397507/14/2025
Niza Works of Architects6101307/14/2025
A Tech Engineering NYC, P6738105/21/2024
Building Lifecycle
09/14/2026
Permit renewed — Construction Fence
Renewed with changes
S01047747-S1-FN
08/31/2026
Closed: Emer wrk ordr:.unpermitted soe/foundtn wrk, excavatn over 5'@ exp#3&4, underminng adjacent neighbors' yard & garage @ 34 macfarland. Remedy: retain…
DOB violation · closed on the city's record
07/06/2026
Permit renewed — General Construction
Renewed with changes
S01102430-I1-GC-CX
11/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Zapata
11/13/2025
Special inspection requirement — Fenestration areas
Nicolas Zapata
97 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedHM Build and Uplift09/14/2026
DOB NOWGeneral ConstructionPermit IssuedHM Build and Uplift07/06/2026
DOB NOWConstruction FencePermit IssuedStructureline09/09/2025
DOB NOWStructuralPermit IssuedStructureline07/07/2025
DOB NOWEarth WorkPermit IssuedUpstrate04/14/2025
DOB NOWConstruction FencePermit IssuedTino Construction10/01/2024
DOB NOWConstruction FencePermit IssuedTino Construction06/20/2024
BISOTISSUEDVoltaic Solaire05/17/2016
1 project · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025Permit IssuedApex ElectricGeneral Wiring
1 project · most recent 07/14/2025
Concrete Wood
FiledStatusContractorScope
07/14/2025Permit IssuedHM Build and UpliftConcrete, Wood
1 project · most recent 07/14/2025
Earthwork
FiledStatusContractorScope
07/14/2025Permit IssuedHM Build and UpliftEarthwork
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
11/13/2025FinalJIAN DENGprogress
11/13/2025Footing and FoundationNicolas Zapataprogress
11/13/2025Energy Code Compliance InspectionsNicolas Zapataprogress
11/13/2025Structural Wood FrameNicolas Zapataprogress
11/13/2025Air barrier - visual inspectionNicolas Zapataenergy_progress
11/13/2025Lighting in dwelling unitsNicolas Zapataenergy_progress
11/13/2025Fenestration areasNicolas Zapataenergy_progress
11/13/2025Fenestration and door U-factor and product ratingsNicolas Zapataenergy_progress
11/13/2025Fenestration air leakageNicolas Zapataenergy_progress
11/13/2025Insulation placement and R valuesNicolas Zapataenergy_progress
11/13/2025Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
11/13/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
11/13/2025Subsurface Conditions – Fill Placement & In-Place DensityJIAN DENGspecial
11/13/2025Fire-Resistant Penetrations and JointsNicolas Zapataspecial
11/13/2025Subgrade InspectionsJIAN DENGspecial
11/13/2025Concrete - Cast-In-PlaceNicolas Zapataspecial
11/13/2025Fire-Resistance Rated ConstructionNicolas Zapataprogress
05/14/2025Fenestration and door U-factor and product ratingsNicolas Zapataenergy_progress
05/14/2025Air barrier - visual inspectionNicolas Zapataenergy_progress
05/14/2025Excavations - Sheeting, Shoring, and Bracing—special
05/14/2025Subgrade Inspections—special
05/14/2025Subsurface Conditions – Fill Placement & In-Place Density—special
05/14/2025Concrete - Cast-In-PlaceNicolas Zapataspecial
05/14/2025Fire-Resistant Penetrations and JointsNicolas Zapataspecial
05/14/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
Latest 25 of 64.
85 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account