← Back
One family attached or semi-detached
28 MC KEE AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5175937
💬 Discuss this project
2023Year Built
2Stories
A5Building Class
R3-1Zoning
1,478 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,500 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Attic1 filing
Floor 210p · 2 filings · 20 docs
Floor 113p · 3 filings · 20 docs
Cellar9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PORTO CONSTRUCTION2507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE704/16/2024
A TECH ENGINEERING NYC, PLLC.101/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PORTO CONSTRUCTION,LLCGeneral Contractor903/21/2026
CHARLES J. DEHART JR P&HPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738604/16/2024
Building Lifecycle
All (94)Filed (8)Permit Issued (5)Signed Off (4)Violation (1)Inspection (12)Objection (34)Special Inspection (30)
03/22/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/07/2024
Signed off — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S08028617-I1
04/23/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
anthony santoro
04/23/2024
Special inspection requirement — Mechanical Systems
anthony santoro
04/23/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
04/23/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
04/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/23/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/23/2024
Special inspection requirement — Heating Systems
anthony santoro
04/23/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/23/2024
Special inspection requirement — Final
anthony santoro
04/23/2024
Special inspection requirement — Footing and Foundation
anthony santoro
04/23/2024
Special inspection requirement — Structural Wood Frame
anthony santoro
04/23/2024
Special inspection requirement — Masonry
anthony santoro
04/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/23/2024
Special inspection requirement — Air barrier — testing
anthony santoro
04/23/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
04/23/2024
Special inspection requirement — Shutoff dampers
anthony santoro
04/23/2024
Special inspection requirement — Interior lighting power
anthony santoro
04/23/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
04/23/2024
Special inspection requirement — Permanent certificate
anthony santoro
04/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/23/2024
Special inspection requirement — Fenestration areas
anthony santoro
04/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/23/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
04/23/2024
Special inspection requirement — Maintenance information
anthony santoro
04/23/2024
Special inspection requirement — Lowest Floor Elevation
anthony santoro
04/16/2024
Filed — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S08028617-P5
04/15/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/16/2024
Signed off — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S08028617-S1
02/15/2024
Objection raised — Structural
02/15/2024
Objection raised — Other
01/30/2024
Filed — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S08028617-P3
01/23/2024
Signed off — Alteration
S08036865-I1
12/27/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00804548-I1
12/20/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/19/2023
Filed — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S08028617-P2
12/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/28/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/15/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
11/10/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/26/2023
Permit issued — Curb Cut
S08036865-I1-CC
10/25/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/15/2023
Permit issued — Mechanical Systems
S08028617-I1-GC-CX
08/09/2023
Violation issued (ECB, closed)
Construction
08/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2023
Filed — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S08028617-P1
04/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/10/2023
Permit issued — Plumbing
S08028617-S1-PL
04/04/2023
Permit issued — Plumbing
S00804548-I1-PL
03/22/2023
Filed — Alteration
S08036865-I1
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPORTO CONSTRUCTION,LLC10/26/2023
DOB NOWMechanical SystemsPermit IssuedPORTO CONSTRUCTION,LLC08/15/2023
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H04/10/2023
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H04/04/2023
DOB NOWMechanical SystemsPermit IssuedPORTO CONSTRUCTION,LLC02/24/2023
1 project · most recent 04/16/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2024Permit IssuedPORTO CONSTRUCTION,LLCHeating Systems
Heating
Comfort Aire MCG3036PB4P, MCG3036PB4P 3 tons · Furnace ×4
1 project · most recent 04/16/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/16/2024Signed-offCHARLES J. DEHART JR P&HGas, Storm, Water/Sanitary
1 project · most recent 06/02/2023
General Wiring
FiledStatusContractorScope
06/02/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
1 project · most recent 04/16/2024
Wood
FiledStatusContractorScope
04/16/2024Permit IssuedPORTO CONSTRUCTION,LLCWood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/28/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/15/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
11/10/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/25/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
04/23/2024Mechanical Systemsanthony santorospecial
04/23/2024Subsurface Conditions – Fill Placement & In-Place Densityanthony santorospecial
04/23/2024Concrete - Cast-In-Placeanthony santorospecial
04/23/2024Subgrade Inspectionsanthony santorospecial
04/23/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
04/23/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/23/2024Masonryanthony santorospecial
04/23/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
04/23/2024Heating Systemsanthony santorospecial
04/23/2024Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
04/23/2024Energy Code Compliance Inspectionsanthony santoroprogress
04/23/2024Finalanthony santoroprogress
04/23/2024Footing and Foundationanthony santoroprogress
04/23/2024Structural Wood Frameanthony santoroprogress
04/23/2024Lowest Floor Elevationanthony santoroprogress
04/23/2024Fire-Resistance Rated Constructionanthony santoroprogress
04/23/2024Air barrier — testing anthony santoroenergy_progress
04/23/2024Fenestration air leakageanthony santoroenergy_progress
04/23/2024Shutoff dampersanthony santoroenergy_progress
04/23/2024Interior lighting poweranthony santoroenergy_progress
04/23/2024Air barrier - visual inspectionanthony santoroenergy_progress
04/23/2024Permanent certificateanthony santoroenergy_progress
04/23/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/23/2024Fenestration areasanthony santoroenergy_progress
04/23/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
Latest 25 of 82.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S08036865-I1Request digital key ↗
08/21/2026S08028617-P1Request digital key ↗
08/21/2026S08028617-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026S08028617-P3Open ↗
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026S08028617-P3Open ↗
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P5Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08028617-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S08028617-P1Open ↗
09/01/2026S08028617-P1Open ↗
08/26/2026S08028617-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026S08028617-P1Open ↗
08/26/2026S08028617-S1Open ↗
08/24/2026S08028617-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S08028617-I1Open ↗
08/21/2026S08028617-P3Open ↗
08/21/2026S08028617-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/15/2026S08028617-P3Open ↗
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P5Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P3Open ↗
08/13/2026S08028617-P5Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08028617-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08028617-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08028617-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/15/2026S08028617-P3Open ↗
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08028617-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/15/2026S08028617-P3Open ↗
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026S08028617-P3Open ↗
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/15/2026S08028617-P3Open ↗
08/14/2026S08028617-I1Open ↗
08/13/2026S08028617-P5Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08028617-I1Open ↗