← Back
Elevator cooperative
28 MONROE PLACE
BROOKLYN · BIN 3001926
💬 Discuss this project
1953Year Built
6Stories
D4Building Class
R7-1Zoning
27,294 sfGross Floor Area
35Units
LL97 CoveredRent Stabilized11 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 28 30 MONROE OWNERS CORP · 6,864 sf lot · 3.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 1 filing · 4 docs
Floor 50Under Construction3p · 1 filing · 20 docs
Floor 49Under Construction3p · 1 filing · 20 docs
Floor 48Under Construction3p · 1 filing · 20 docs
Floor 47Under Construction3p · 1 filing · 20 docs
Floor 46Under Construction3p · 1 filing · 20 docs
Floor 45Under Construction3p · 1 filing · 20 docs
Floor 44Under Construction3p · 1 filing · 20 docs
Floor 43Under Construction3p · 1 filing · 20 docs
Floor 42Under Construction3p · 1 filing · 20 docs
Floor 41Under Construction3p · 1 filing · 20 docs
Floor 40Under Construction3p · 1 filing · 20 docs
Floor 39Under Construction3p · 1 filing · 20 docs
Floor 38Under Construction3p · 1 filing · 20 docs
Floor 37Under Construction3p · 1 filing · 20 docs
Floor 36Under Construction3p · 1 filing · 20 docs
Floor 35Under Construction3p · 1 filing · 20 docs
Floor 34Under Construction3p · 1 filing · 20 docs
Floor 33Under Construction3p · 1 filing · 20 docs
Floor 32Under Construction3p · 1 filing · 20 docs
Floor 31Under Construction3p · 1 filing · 20 docs
Floor 30Under Construction3p · 1 filing · 20 docs
Floor 29Under Construction3p · 1 filing · 20 docs
Floor 28Under Construction3p · 1 filing · 20 docs
Floor 27Under Construction3p · 1 filing · 20 docs
Floor 26Under Construction3p · 1 filing · 20 docs
Floor 25Under Construction3p · 1 filing · 20 docs
Floor 24Under Construction3p · 1 filing · 20 docs
Floor 23Under Construction3p · 1 filing · 20 docs
Floor 22Under Construction3p · 1 filing · 20 docs
Floor 21Under Construction3p · 1 filing · 20 docs
Floor 20Under Construction3p · 1 filing · 20 docs
Floor 19Under Construction3p · 1 filing · 20 docs
Floor 18Under Construction3p · 1 filing · 20 docs
Floor 17Under Construction3p · 1 filing · 20 docs
Floor 16Under Construction3p · 1 filing · 20 docs
Floor 15Under Construction3p · 1 filing · 20 docs
Floor 14Under Construction3p · 1 filing · 20 docs
Floor 13Under Construction3p · 1 filing · 20 docs
Floor 12Under Construction3p · 1 filing · 20 docs
Floor 11Under Construction3p · 1 filing · 20 docs
Floor 10Under Construction3p · 1 filing · 20 docs
Floor 9Under Construction3p · 1 filing · 20 docs
Floor 8Under Construction3p · 1 filing · 20 docs
Floor 7Under Construction3p · 1 filing · 20 docs
Floor 6Under Construction3p · 1 filing · 20 docs
Floor 5Under Construction6p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
1 job · most recent 10/15/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2025Permit IssuedTAFFERA FINE BUILDING ANDHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEAD-A24AA9 24,000 BTU · Vrf Indoor ×4
MXZ-SM48NAMHZ2 48,000 BTU · Condensing Unit ×2
2 jobs · most recent 10/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/15/2025Permit IssuedDONATO PLUMBING, INCGas, Water/Sanitary
10/02/2023——Gas, Water/Sanitary
13 jobs · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
02/26/2026Permit IssuedSUPER CHARGED ELEC. INC.1 meters, 1 new_meters
08/26/2025Permit IssuedSUPER CHARGED ELEC. INC.General Wiring
06/30/2025CompletePLATINUM PWR ELECTL CONT—
04/06/2025Permit IssuedANI ELECTRIC CORPGeneral Wiring
11/08/2023CompleteKET ELECTRIC LLCGeneral Wiring
10/17/2023CompleteLINA ELECTRIC, CORPGeneral Wiring
03/23/2023Permit IssuedD.R.P. ELEC'L CONTRG INCGeneral Wiring
01/29/2021CompleteA #1 UNIVERSAL ELEC'L INC—
11/18/2019Permit IssuedA&E ELECTRICAL SYSTEMS COGeneral Wiring
08/30/2018Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
08/23/2018Permit IssuedOMD ELECTRICAL CORPGeneral Wiring
05/29/2018Permit IssuedOMD ELECTRICAL CORPGeneral Wiring
1 job · most recent 07/17/2026
Sidewalk Shed
FiledStatusContractorScope
07/17/2026Permit IssuedKINGS GROUP NY CORPSidewalk Shed
1 job · most recent 06/29/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/29/2026Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold (SC)
Building Lifecycle
All (136)Filed (11)Permit Issued (8)Signed Off (2)Facade (FISP) (12)Violation (47)Inspection (7)Objection (22)Special Inspection (27)
08/03/2026
Permit issued — General Construction
B01230785-I1-GC
07/17/2026
Filed — Alteration
EXTERIOR MASONRY REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01395613-S1
07/17/2026
Permit issued — Sidewalk Shed
B01395613-S1-SH
07/09/2026
Permit issued — Suspended Scaffold
B01421303-I1-SC
06/29/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
B01421303-I1
06/29/2026
Permit issued — General Construction
B01395613-I1-GC
06/29/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
06/01/2026
Objection raised — Scope
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
05/28/2026
Objection raised — Scope
05/12/2026
Filed — Alteration
EXTERIOR MASONRY REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01395613-I1
05/11/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/05/2026
Violation issued (HPD, open)
A
03/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/18/2025
Violation issued (HPD, closed)
I
11/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2025
Permit issued — Plumbing
B01230785-S1-PL
10/21/2025
Special inspection requirement — Mechanical Systems
Jeffrey Stones
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
10/21/2025
Special inspection requirement — Final
Jeffrey Stones
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
10/21/2025
Special inspection requirement — Duct leakage testing, insulation and design
Jeffrey Stones
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
10/21/2025
Special inspection requirement — Final
Jeffrey Stones
10/21/2025
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
10/15/2025
Filed — Alteration
Plumbing work in conjunction with job #B01230785-I1.
B01230785-P1
10/15/2025
Filed — Alteration
Plumbing work in conjunction with job #B01230785-I1.
B01230785-P3
10/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
10/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
10/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
10/14/2025
Special inspection requirement — Final
Jeffrey Stones
10/14/2025
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
10/14/2025
Special inspection requirement — Final
Jeffrey Stones
10/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
Jeffrey Stones
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/14/2025
Special inspection requirement — Mechanical Systems
Jeffrey Stones
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
09/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2025
Filed — Alteration
Plumbing work in conjunction with job #B01230785-I1.
B01230785-S2
08/26/2025
Filed — Alteration
Plumbing work in conjunction with job #B01230785-I1.
B01230785-S1
07/18/2025
Permit issued — General Construction
B01230785-I1-GC
06/26/2025
Objection resolved — Addressed
06/10/2025
Violation issued (HPD, open)
A
06/03/2025
Objection raised — Scope
05/23/2025
Filed — Alteration
Plumbing work in conjunction with job #B01230785-I1.
B01230785-I1
11/25/2024
Violation issued (HPD, closed)
I
06/28/2024
Signed off — Alteration
Capping Existing Gas Range, Replacing Kitchen Sink with Washer Dryer
B00935933-I1
04/11/2024
Violation issued (HPD, open)
A
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2023
Violation issued (HPD, closed)
I
Latest 60 of 136 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SANDBERG MANAGEMENT309/13/2026
KINGS GROUP NY208/29/2026
28-30 MONROE PL OWNERS CORP603/22/2026
30 MONROE OWNERS CORP103/22/2026
28-30-26 ENTERPRISES LTD103/22/2026
SIREN MANAGEMENT403/22/2026
GEROHN REAL ESTATE MGM103/22/2026
C O SIREN MANAGEMENT203/21/2026
28-30 MONROE PLACE OWNERS CORP603/21/2026
28-30 MONROE PLACE ASSOCIATES603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEVEL UP REMODELING INCGeneral Contractor303/21/2026
ROCK & HAMMER CONSTRUCTIOGeneral Contractor303/21/2026
TAFFERA FINE BUILDING ANDGeneral Contractor208/04/2026
KINGS GROUP NY CORPGeneral Contractor107/19/2026
TWO-TONE CONTRACTING CORP.General Contractor107/01/2026
JAROSLAW KURACHElectrical103/21/2026
DONATO PLUMBING, INCPlumbing107/08/2026
KEVIN GARRITYElectrical103/21/2026
PLATINUM PWR ELECTL CONTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034105/12/2026
ZASKORSKI & ASSOCIATES AR6121105/12/2026
JSPECS,INC9429510/15/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTAFFERA FINE BUILDING AND08/03/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP07/17/2026
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP07/09/2026
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP.06/29/2026
DOB NOWPlumbingPermit IssuedDONATO PLUMBING, INC10/30/2025
DOB NOWGeneral ConstructionPermit IssuedTAFFERA FINE BUILDING AND07/18/2025
DOB NOWGeneral ConstructionSigned-offLEVEL UP REMODELING INC11/06/2023
DOB NOWGeneral ConstructionSigned-offROCK & HAMMER CONSTRUCTIO03/03/2023
BISOTISSUEDNY CONSTRUCTION&STONE INC01/15/2020
BISMHISSUEDNY CONSTRUCTION&STONE INC01/15/2020
BISPLISSUEDORBIT PLBG & HTG INC04/12/2019
BISMHISSUEDNY CONSTRUCTION&STONE INC04/10/2019
BISOTISSUEDNY CONSTRUCTION&STONE INC04/10/2019
BISPLISSUEDDNA PLUMBING CONTR. INC06/14/2018
BISOTISSUEDXR GROUP CORP05/24/2018
BISEQISSUEDCONSTRUCTION SVS CON NY05/18/2016
BISOTISSUEDUNITED CHIMNEY CORP04/27/2016
BISOTISSUEDUNITED CHIMNEY CORP02/03/2016
BISPLISSUEDORBIT PLBG & HTG INC08/25/2015
BISMHISSUEDCSC CLEAR STONE CONS LLC08/10/2015
BISOTISSUEDACCURA REST.& WATERPROOF07/22/2015
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING07/09/2015
BISOTISSUEDTERRY DESIGN01/04/2007
BISPLISSUEDIHOPE PLUMBING & HEATING CO. INC02/06/2006
BISOTISSUEDWILLIAM DEE INSTALL. INC01/19/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/03/2002
BISOTISSUEDMALOY RESTORATION CORP05/10/2002
BIS—ISSUEDDUNCAN ALISON KRUSE04/24/1998
BISOTISSUEDDAVID J O'CONNOR05/02/1997
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/11/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/29/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
10/21/2025Mechanical SystemsJeffrey Stonesspecial
10/21/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
10/21/2025FinalJeffrey Stonesprogress
10/21/2025HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
10/21/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
10/21/2025Duct leakage testing, insulation and designJeffrey Stonesenergy_progress
10/21/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
10/21/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/21/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/21/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
10/21/2025FinalJeffrey Stonesprogress
10/21/2025Lighting in dwelling unitsJeffrey Stonesenergy_progress
10/14/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
10/14/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
10/14/2025HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
10/14/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/14/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
10/14/2025FinalJeffrey Stonesprogress
10/14/2025Lighting in dwelling unitsJeffrey Stonesenergy_progress
10/14/2025FinalJeffrey Stonesprogress
10/14/2025Duct leakage testing, insulation and designJeffrey Stonesenergy_progress
10/14/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/14/2025Mechanical SystemsJeffrey Stonesspecial
10/14/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
Latest 25 of 27.
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00831728-I1Request digital key ↗
08/20/2026B01230785-P3Request digital key ↗
08/20/2026B01230785-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION16
11/19/2021302062791Open ↗
04/13/2021321920016Open ↗
11/16/2020321920016Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION12
01/15/2020321920016Open ↗
01/15/2020321920016Open ↗
04/15/2019321920016Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLPC Approval/Permit9
08/15/2026B01395613-I1Open ↗
08/13/2026B00935933-I1Open ↗
08/13/2026B01230785-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/16/2019321747990Open ↗
07/18/2016320990451Open ↗
01/20/2016320990451Open ↗
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
04/11/2019321920016Open ↗
04/09/2019321920016Open ↗
03/22/2019321747990Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026B01230785-P3Open ↗
08/20/2026B01230785-P1Open ↗
08/20/2026B01230785-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026B00935933-I1Open ↗
08/28/2026B01230785-P3Open ↗
08/28/2026B01230785-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01421303-I1Open ↗
08/28/2026B01230785-P3Open ↗
08/26/2026B01230785-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/26/2018321747990Open ↗
05/17/2016340381955Open ↗
02/02/2016340349091Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/17/2016340381955Open ↗
02/02/2016340349091Open ↗
07/08/2015340277319Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/17/2016340381955Open ↗
02/02/2016340349091Open ↗
07/08/2015340277319Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/08/2015340246166Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/26/2018321747990Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/28/2019321920016Open ↗
01/23/2019321747990Open ↗
04/26/2018321747990Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
04/13/2021321920016Open ↗
12/17/2020321920016Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/17/2020321920016Open ↗
08/03/2016320990451Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
02/27/2019321920016Open ↗
01/28/2019321920016Open ↗
04/26/2018321747990Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026B01230785-P1Open ↗
08/20/2026B01230785-P3Open ↗
08/20/2026B01230785-S2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/22/2019321920016Open ↗
02/02/2016340349091Open ↗
07/28/2015320990451Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/01/2009320066735Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/22/2016340246166Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/22/2019321747990Open ↗
03/22/2019321747990Open ↗
02/27/2019321920016Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/08/2020321920016Open ↗
02/02/2016340349091Open ↗
04/08/2015340246166Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/08/2020321920016Open ↗
08/03/2016320990451Open ↗
01/22/2016340246166Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/08/2015340277319Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/02/2016340349091Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
10/08/2020321920016Open ↗
05/17/2016340381955Open ↗
11/30/2015340246166Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
12/17/2020321920016Open ↗
04/15/2019321747990Open ↗
03/22/2019321747990Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL8
10/08/2020321920016Open ↗
04/26/2018321747990Open ↗
05/17/2016340381955Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/22/2015320990451Open ↗
09/01/2009320066735Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/17/2016340349091Open ↗
▸BISLANDMARKS SIGNOFF1
04/30/2016320990451Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
10/10/2012320066735Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
10/08/2020321920016Open ↗
03/22/2019321747990Open ↗
02/27/2019321920016Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET5
01/28/2019321920016Open ↗
01/28/2019321920016Open ↗
04/27/2018321747990Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/17/2016340381955Open ↗
02/02/2016340349091Open ↗
07/08/2015340277319Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
11/16/2020321920016Open ↗
02/27/2019321920016Open ↗
09/21/2016340349091Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
04/15/2019321747990Open ↗
02/06/2019321747990Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/22/2016340246166Open ↗
07/22/2015340246166Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01421303-I1Open ↗
▸DOB NOWCalculations1
08/16/2026B01421303-I1Open ↗