Elevator cooperative
28 OLD FULTON STREET
BROOKLYN · Brooklyn Heights · BIN 3001475
💬 Discuss this project
1894Year Built
9Stories
D4Building Class
M2-1Zoning
171,000 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized30 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: EAGLE TENANTS CORP · 19,988 sf lot · 8.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 12 docs
PenthouseUnder Construction1 filing · 19 docs
Floor 81 filing · 5 docs
Floor 73 filings · 12 docs
Floor 6
Floor 5
Floor 41 filing · 5 docs
Floor 31 filing · 10 docs
Floor 22p · 1 filing · 12 docs
Floor 11 filing · 12 docs
Cellar3p · 1 filing · 17 docs
Site & exteriorUnder Construction3 filings · 12 docs
Filed — no permit issued3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEN FISHBEIN REAL ESTATE603/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING303/21/2026
DJL ARCHITECT103/21/2026
LOMBARDO BUILDING CONSULTANTS503/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
GREEN LIGHT EXPEDITING LLC203/21/2026
AE DESIGN SOLUTION203/21/2026
BREND RESTORATION SERVICES803/21/2026
EA DESIGN GROUP603/21/2026
BOYD CONSULTING203/21/2026
DOMANI CONSULTING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BREND RESTORATION LLCGeneral Contractor808/26/2026
EURO T.I. INCGeneral Contractor407/08/2026
DELTA-SIGMA MECH CORPPlumbing307/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
BOWMAN CONSTRUCTION CORPGeneral Contractor203/21/2026
PERFECT SQUARE CONSTRUCTIGeneral Contractor207/08/2026
AJC PLUMBING & HTG CORPPlumbing207/08/2026
SKYLIFT CONTRACTOR CORPElectrical103/21/2026
UPDATE SYSTEMS ELECTRICALElectrical103/22/2026
YOUNG, GElectrical103/21/2026
ACER RESTORATIONS LLCGeneral Contractor107/08/2026
I.M.P. PLG & HTG CORPGeneral Contractor103/22/2026
NY SIGNATURE BUILDERS LLCGeneral Contractor107/08/2026
AMOK INCPlumbing107/08/2026
DOYLE BROS PLBG & HTG INCPlumbing107/08/2026
ALLEGHENY DESIGN MNGMT INElectrical103/21/2026
GANIC PLUMBING & HTG INCPlumbing107/08/2026
BARGER, JAMESElectrical103/21/2026
CHRISTIANSEN, IElectrical103/21/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
EMPIRE ERECTORS & ELECTRIElectrical103/21/2026
GSA ELECTRIC CORP.Electrical103/22/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
MORALES, WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION5859312/23/2025
KIMBERLY PECK ARCHITECT,6812302/18/2025
MELONE ARCHITECTS2944101/27/2025
URBAN PIONEERING ARCHITEC6521201/12/2023
INDETAIL DESIGN ARCHITECT4828308/20/2021
DARIO ARCHITECTURE &DESIG6878105/18/2021
YORKOS ENGINEERING, DESIG6991104/29/2020
ANS CONSULTANTS, INC.1768110/25/2019
Building Lifecycle
All (247)Filed (30)Permit Issued (24)Signed Off (10)Facade (FISP) (12)Violation (60)Inspection (21)Objection (66)Special Inspection (24)
08/03/2026
Permit issued — General Construction
B01123239-I1-GC
07/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2026
Filed — Alteration
Facade inspection and a related repairs.
B01166114-P4
05/26/2026
Permit issued — Plumbing
B01331118-S1-PL
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2026
Permit issued — General Construction
B01331118-I1-GC
04/17/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01161154-P2
03/03/2026
Filed — Alteration
TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01161144-P2
02/05/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/27/2026
Objection raised — Admin
01/27/2026
Objection resolved — Addressed
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
01/26/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/16/2026
Filed — Alteration
Facade inspection and a related repairs.
B01166114-P3
01/16/2026
Objection raised — Mechanical
01/16/2026
Objection raised — Mechanical
01/12/2026
Permit issued — Suspended Scaffold
B01166114-I1-SC
01/12/2026
Permit issued — Supported Scaffold
B01161154-I1-SF
01/12/2026
Permit issued — Sidewalk Shed
B01161144-I1-SH
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nandinee Phookan
01/07/2026
Objection raised — Plumbing
01/07/2026
Objection raised — Plumbing
01/07/2026
Objection raised — Plumbing
01/07/2026
Objection raised — Admin
01/07/2026
Objection raised — Plumbing
01/07/2026
Objection raised — Admin
01/07/2026
Objection raised — Energy
12/23/2025
Filed — Alteration
Plumbing plans filed herewith to remove and replace all plumbing fixtures. No change to use, egress, or occupancy.
B01331118-S2
12/18/2025
Filed — Alteration
Plumbing plans filed herewith to remove and replace all plumbing fixtures. No change to use, egress, or occupancy.
B01331118-S1
12/15/2025
Filed — Alteration
Plumbing plans filed herewith to remove and replace all plumbing fixtures. No change to use, egress, or occupancy.
B01331118-I1
12/09/2025
Special inspection requirement — Final
Nandinee Phookan
12/01/2025
Objection resolved — Addressed
11/28/2025
Objection raised — Inspections
11/25/2025
Filed — Alteration
Facade inspection and a related repairs.
B01166114-P2
10/17/2025
Filed — Alteration
Facade inspection and a related repairs.
B01166114-P1
10/03/2025
Filed — Alteration
TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01161144-P1
09/23/2025
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01161154-P1
08/21/2025
Permit issued — General Construction
B01123239-I1-GC
07/23/2025
Signed off — Alteration
HEREWITH FILE PLANS TO RENOVATED APARTMENT THF, GENERAL CONSTRUCTION TO INCLUDE LIMITED REMOVAL AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, NEW LIGHTING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01088207-I1
07/21/2025
Signed off — Alteration
HEREWITH FILE PLANS TO RENOVATED APARTMENT THF, GENERAL CONSTRUCTION TO INCLUDE LIMITED REMOVAL AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, NEW LIGHTING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01088207-S1
07/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/12/2025
Permit issued — General Construction
B01088207-I1-GC
02/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 247 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBREND RESTORATION LLC08/03/2026
DOB NOWPlumbingPermit IssuedDOYLE BROS PLBG & HTG INC05/26/2026
DOB NOWGeneral ConstructionPermit IssuedACER RESTORATIONS LLC04/23/2026
DOB NOWSuspended ScaffoldPermit IssuedBREND RESTORATION LLC01/12/2026
DOB NOWSupported ScaffoldPermit IssuedBREND RESTORATION LLC01/12/2026
DOB NOWSidewalk ShedPermit IssuedBREND RESTORATION LLC01/12/2026
DOB NOWGeneral ConstructionPermit IssuedBREND RESTORATION LLC08/21/2025
DOB NOWGeneral ConstructionSigned-offPERFECT SQUARE CONSTRUCTI06/12/2025
DOB NOWSidewalk ShedPermit IssuedBREND RESTORATION LLC01/17/2025
DOB NOWSupported ScaffoldPermit IssuedBREND RESTORATION LLC01/17/2025
DOB NOWSuspended ScaffoldPermit IssuedBREND RESTORATION LLC01/16/2025
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP10/28/2024
DOB NOWGeneral ConstructionSigned-offPERFECT SQUARE CONSTRUCTI10/23/2024
DOB NOWPlumbingSigned-offAMOK INC02/03/2023
DOB NOWGeneral ConstructionSigned-offBOWMAN CONSTRUCTION01/25/2023
DOB NOWGeneral ConstructionSigned-offEURO T.I. INC10/18/2021
DOB NOWPlumbingSigned-offGANIC PLUMBING & HTG INC06/24/2021
DOB NOWGeneral ConstructionSigned-offNY SIGNATURE BUILDERS LLC06/17/2021
DOB NOWGeneral ConstructionSigned-offEURO T.I. INC06/01/2021
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP08/26/2020
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP06/05/2020
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP02/13/2020
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP11/19/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/21/2019
BISOTISSUEDZHL GROUP INC06/12/2020
BISOTISSUEDD.S.C.CONSTRUCTION INC02/06/2020
BISOTISSUEDD.S.C.CONSTRUCTION INC11/01/2019
BISOTISSUEDRICONDA MAINTENANCE INC05/06/2019
BISPLISSUEDA GOOD PLUMBER CORP01/10/2019
BISOTISSUEDGHCR, LLC06/09/2018
BISPLISSUEDTOP PLUMBING GROUP,INC01/23/2018
BISOTISSUED360 GENERAL CONTRACTING I01/04/2018
BISMHISSUEDGREENTECH CONSTRUCTION CO11/09/2017
BISPLISSUEDTOP DOG PLBG & HTG CORP10/31/2017
BISOTISSUEDBMB BUILDER INC09/28/2017
BISOTISSUEDSTJ CONTRACTING CORP09/25/2017
BISPLISSUEDFLYTIGER P & H LTD08/18/2017
BISOTISSUEDROI CONSTRUCITON INC08/17/2017
BISPLISSUEDTOP PLUMBING GROUP,INC07/21/2017
BISPLISSUEDCHAMP PLUMBING & HTG CORP07/11/2017
+ 34 more permits on file
1 project · most recent 05/24/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/24/2023——Heating and Air Conditioning Systems
Heat / Cool
Islandaire EZ07B945H415BA 7,000 BTU · Heat Pump Outdoor ×1
WM90B5 9,200 BTU · Heat Pump Outdoor ×1
1 project · most recent 12/23/2025
Water/Sanitary
FiledStatusContractorScope
12/23/2025Permit IssuedDOYLE BROS PLBG & HTG INCWater/Sanitary
14 projects · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025CompleteEURO ELEC'L CONTRG, INCGeneral Wiring
01/17/2025Permit IssuedTOP SHELF ELECTRIC CORP—
10/31/2024Permit IssuedBOROWIDE ELECT'L CONTR'SGeneral Wiring
01/12/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
07/19/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
02/27/2023CompleteTWINTECH ELECTRIC INCGeneral Wiring
12/05/2022CompleteEVEREST ELEC'L CONTRG INCGeneral Wiring
10/19/2021CompleteCRESCO ELECTRICAL CORPGeneral Wiring
02/17/2021CompleteANTONIO CERIELLO ELEC INC—
12/08/2020CompleteDEMAND ELECTRIC INCGeneral Wiring
06/29/2020CompleteUPDATE SYSTEMS ELECTRICALGeneral Wiring
12/07/2019CompleteGSA ELECTRIC CORP.General Wiring
03/01/2019CompleteBOROWIDE ELECT'L CONTR'S—
01/29/2018CompleteALL AROUND ELECTRIC CORP.General Wiring
1 project · most recent 01/27/2025
FiledStatusContractorScope
01/27/2025Permit IssuedBREND RESTORATION LLC1 scope_items
2 projects · most recent 04/17/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/17/2026Permit IssuedBREND RESTORATION LLCScaffold
03/03/2026Permit IssuedBREND RESTORATION LLCSidewalk Shed
1 project · most recent 05/26/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/26/2026Permit IssuedBREND RESTORATION LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
07/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/23/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/23/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2021Pass-Final General Construction Non-Directive 14PassView ↗
10/29/2021Fail-Final General Construction Non-Directive 14FailView ↗
10/21/2021Pass-Final General Construction Non-Directive 14PassView ↗
10/07/2021Fail-Final General Construction Non-Directive 14FailView ↗
09/29/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/27/2026Fire-Resistant Penetrations and JointsMax Leespecial
01/09/2026Fire-Resistant Penetrations and JointsMax Leespecial
01/09/2026Fire-Resistance Rated ConstructionNandinee Phookanprogress
12/09/2025FinalNandinee Phookanprogress
02/25/2025Fire-Resistant Penetrations and Jointskimberly peckspecial
02/18/2025Fire-Resistant Penetrations and Jointskimberly peckspecial
10/07/2024Structural Stability – Alterations of existing buildingsNicholas Melonespecial
10/07/2024MasonryNicholas Melonespecial
10/07/2024FinalNicholas Meloneprogress
10/07/2024Tenant Protection Plan ComplianceNicholas Melonespecial
07/30/2024Finalkimberly peckprogress
07/30/2024Fire-Resistant Penetrations and Jointskimberly peckspecial
04/19/2023Fire-Resistant Penetrations and Joints—special
03/15/2023Mechanical Systems—special
03/15/2023Final—progress
07/11/2022FinalJames Hillprogress
07/11/2022Fire-Resistance Rated ConstructionJames Hillprogress
07/11/2022Fire-Resistant Penetrations and JointsJames Hillspecial
08/26/2021Fire-Resistant Penetrations and JointsJonathan Chinspecial
08/06/2021Fire-Resistant Penetrations and JointsJonathan Chinspecial
05/14/2021Interior lighting powerJonathan Chinenergy_progress
05/14/2021Fire-Resistance Rated ConstructionJonathan Chinprogress
05/14/2021Energy Code Compliance InspectionsJonathan Chinprogress
05/14/2021Fire-Resistant Penetrations and JointsJonathan Chinspecial
▾Documents — 706 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch27
09/01/2026B00522339-I1Request digital key ↗
09/01/2026B00522339-P1Request digital key ↗
09/01/2026B00522572-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00247144-I1Request digital key ↗
09/02/2026B00343433-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00136057-I1Request digital key ↗
▸Applications & Permits132
▸BISWORK PERMIT APPLICATION73
06/12/2020340725585Open ↗
02/06/2020321998139Open ↗
11/04/2019321998139Open ↗
Showing 3 of 73 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION37
02/24/2026340725585Open ↗
04/29/2020340725585Open ↗
10/10/2019321998139Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWLPC Approval/Permit18
08/15/2026B00519756-I1Open ↗
08/15/2026B00772449-S1Open ↗
08/14/2026B00772449-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
04/06/2018321621287Open ↗
04/06/2018321621287Open ↗
04/06/2018321621287Open ↗
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications152
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
03/18/2020321998139Open ↗
03/18/2020321998139Open ↗
03/18/2020321998139Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/02/2026B00136057-I1Open ↗
09/01/2026B00522339-P1Open ↗
09/01/2026B00522339-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
08/17/2017321360530Open ↗
Showing 1 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/18/2026B01088207-S1Open ↗
09/05/2026B01123239-I1Open ↗
09/05/2026B01123239-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
06/07/2018340605134Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/05/2026B01123239-I1Open ↗
09/01/2026B01088207-I1Open ↗
08/30/2026B00519756-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)3
08/17/2017321360530Open ↗
07/14/2017321604073Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/07/2018340605134Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
04/29/2020340725585Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/07/2018340605134Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment34
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING13
06/07/2018340605134Open ↗
Showing 1 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
10/26/2017321621287Open ↗
08/11/2017321621303Open ↗
07/14/2017321604073Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes12
05/11/2020340725585Open ↗
10/10/2019321998139Open ↗
10/09/2019321998139Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026B00247144-I1Open ↗
08/13/2026B00343433-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos55
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
04/29/2020340725585Open ↗
10/10/2019321998139Open ↗
10/09/2019321998139Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/01/2026B00522339-I1Open ↗
09/01/2026B00522339-P1Open ↗
09/01/2026B00522572-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance44
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
11/22/2019321947514Open ↗
10/31/2019340605134Open ↗
10/31/2019340605134Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/22/2019321947514Open ↗
09/27/2019340605134Open ↗
01/12/2018321621321Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/07/2018340605134Open ↗
Showing 1 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00519756-I1Open ↗
08/13/2026B00522572-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/07/2018340605134Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/04/2021321820972Open ↗
05/13/2020340725585Open ↗
05/13/2020340725585Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/12/2020340725585Open ↗
▸Approvals, Objections & Sign-offs99
▸BISLANDMARKS APPROVAL34
05/13/2020340725585Open ↗
03/18/2020321998139Open ↗
11/22/2019321947514Open ↗
Showing 3 of 34 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST34
01/04/2021321820972Open ↗
03/18/2020321998139Open ↗
11/22/2019321947514Open ↗
Showing 3 of 34 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
03/21/2018321621321Open ↗
03/14/2018321621321Open ↗
Showing 2 of 9 on file for this type
▸BISLANDMARKS SIGNOFF4
10/17/2023340725585Open ↗
01/04/2021321820972Open ↗
12/29/2017321582578Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
06/12/2020340725585Open ↗
▸Cost, Insurance & Ownership58
▸BISCOST AFFIDAVIT57
09/17/2023340725585Open ↗
01/04/2021321820972Open ↗
04/29/2020340725585Open ↗
Showing 3 of 57 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/17/2023340725585Open ↗
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET28
10/10/2019321998139Open ↗
10/09/2019321998139Open ↗
07/15/2019321947514Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM14
03/18/2020321998139Open ↗
11/22/2019321947514Open ↗
10/31/2019340605134Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
05/13/2020340725585Open ↗
05/11/2020340725585Open ↗
05/11/2020340725585Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
04/29/2020340725585Open ↗
06/07/2018340605134Open ↗
Showing 2 of 4 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
08/14/2017321621321Open ↗
07/24/2017321604073Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWProof of Historic Building5
08/13/2026B01088207-I1Open ↗
08/13/2026B00844728-I1Open ↗
08/13/2026B00844752-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations5
08/18/2026B01166114-P4Open ↗
08/18/2026B01166114-I1Open ↗
08/13/2026B01166114-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
08/18/2026B01166114-P4Open ↗
08/18/2026B01166114-P2Open ↗
08/18/2026B01166114-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOP-4 - Special Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type