| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/22/2026 | Signed-off | RIVERSIDE DEVELOPERS USA | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-SM60NAM2-U1 60,000 BTU · Heat Pump Outdoor ×60 MXZ-SM36NAM2-U1 36,000 BTU · Heat Pump Outdoor ×26 MXZ-SM48NAM2-U1 48,000 BTU · Heat Pump Outdoor ×14 PUZ-A12NKA7 12,000 BTU · Heat Pump Outdoor ×8 PUHY-P72TNU-A 72,000 BTU · Vrf Outdoor ×2 Heating Mitsubishi Electric MXZ-SM60NAM2-U1 66,000 BTU · Heat Pump Outdoor ×60 MXZ-SM36NAM2-U1 41,000 BTU · Heat Pump Outdoor ×26 MXZ-SM48NAM2-U1 50,000 BTU · Heat Pump Outdoor ×14 PUZ-A12NKA7 14,000 BTU · Heat Pump Outdoor ×8 PUHY-P72TNU-A 80,000 BTU · Vrf Outdoor ×2 Ventilation Greenheck SP-B90 50 CFM · Exhaust Fan ×216 SP-B110 100 CFM · Exhaust Fan ×136 CUE-120-VG 1,400 CFM · Exhaust Fan ×10 G-100-VG 900 CFM · Exhaust Fan ×6 CUBE-300 6,300 CFM · Exhaust Fan ×2 CUE-100-VG 800 CFM · Exhaust Fan ×2 G-070-VG 250 CFM · Exhaust Fan ×2 G-090-VG 400 CFM · Exhaust Fan ×2 G-095-VG 550 CFM · Exhaust Fan ×2 G-130-VG 1,700 CFM · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Permit Issued | TRISTATE FIRE SPRINK INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Permit Issued | MMI PLUMBING & HEATING IN | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/18/2025 | Permit Issued | HIGH STANDARD ELECTRIC | General Wiring |
| 12/11/2025 | Permit Issued | HIGH STANDARD ELECTRIC | 33 meters, 33 new_meters |
| 08/27/2025 | Permit Issued | HIGH STANDARD ELECTRIC | — |
| 08/11/2025 | Permit Issued | DENALI ELECTRIC CORP | — |
| 08/07/2025 | Complete | SOLAS ELECTRICAL CORP | — |
| 05/13/2024 | Permit Issued | HIGH STANDARD ELECTRIC | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Permit Issued | TRISTATE FIRE SPRINK INC | Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/05/2025 | Signed-off | CORE SCAFFOLD SYSTEMS INC | Scaffold |
| 09/17/2025 | Signed-off | CORE SCAFFOLD SYSTEMS INC | Sidewalk Shed |
| Owner | Filings | Most Recent |
|---|---|---|
| RIVERSIDE DEVELOPERS | 41 | 09/13/2026 |
| OWNERS REP | 13 | 07/08/2026 |
| RIVERSIDE DEVELOPERS USA | 9 | 03/22/2026 |
| TOURO CONCRETE LLC | 3 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| DANIEL CONDATORE, RA | 11 | 04/22/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 7 | 12/05/2025 |
| VALJATO ENGINEERING PC | 1 | 10/30/2025 |
| HIDAMARI ENGINEERING SERVICES, P.C. | 8 | 08/07/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| BAC Developers Group | 14 | 03/21/2026 |
| ZV Drafting | 1 | 03/21/2026 |
| AE DESIGN SOLUTION | 14 | 03/21/2026 |
| VALJATO ENGINEERING P C | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RIVERSIDE DEVELOPERS USA | General Contractor | 11 | 08/07/2026 |
| TRISTATE FIRE SPRINK INC | Fire Protection | 6 | 09/02/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 5 | 07/08/2026 |
| MMI PLUMBING & HEATING INC. | Plumbing | 2 | 07/22/2026 |
| HMF VENTURES LLC | General Contractor | 1 | 04/09/2026 |
| CITY WIDE BUILDERS GRP IN | General Contractor | 1 | 04/09/2026 |
| DENALI ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| B&B MECH PLBG & HTG LLC | Plumbing | 1 | 06/28/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TECNICO SPECIAL INSPECTIO | 5939 | 14 | 04/22/2026 |
| VALJATO ENGINEERING PC | 2486 | 1 | 10/30/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | TRISTATE FIRE SPRINK INC | 09/01/2026 |
| DOB NOW | Standpipe | Permit Issued | TRISTATE FIRE SPRINK INC | 09/01/2026 |
| DOB NOW | Standpipe | Permit Issued | TRISTATE FIRE SPRINK INC | 09/01/2026 |
| DOB NOW | Structural | Signed-off | RIVERSIDE DEVELOPERS USA | 08/06/2026 |
| DOB NOW | Plumbing | Permit Issued | MMI PLUMBING & HEATING INC. | 07/21/2026 |
| DOB NOW | Foundation | Signed-off | RIVERSIDE DEVELOPERS USA | 07/02/2026 |
| DOB NOW | Support of Excavation | Signed-off | RIVERSIDE DEVELOPERS USA | 06/17/2026 |
| DOB NOW | Construction Fence | Permit Issued | RIVERSIDE DEVELOPERS USA | 06/05/2026 |
| DOB NOW | Earth Work | Signed-off | RIVERSIDE DEVELOPERS USA | 02/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RIVERSIDE DEVELOPERS USA | 12/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 12/05/2025 |
| DOB NOW | Plumbing | Permit Issued | MICHAEL ITSKOVICH | 11/25/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | RIVERSIDE DEVELOPERS USA | 11/24/2025 |
| DOB NOW | General Construction | Permit Issued | RIVERSIDE DEVELOPERS USA | 10/22/2025 |
| DOB NOW | Standpipe | Permit Issued | TRISTATE FIRE SPRINK INC | 09/04/2025 |
| DOB NOW | Sprinklers | Permit Issued | TRISTATE FIRE SPRINK INC | 09/03/2025 |
| DOB NOW | Standpipe | Permit Issued | TRISTATE FIRE SPRINK INC | 09/03/2025 |
| DOB NOW | Structural | Signed-off | RIVERSIDE DEVELOPERS USA | 08/19/2025 |
| DOB NOW | Supported Scaffold | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/05/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/05/2025 |
| DOB NOW | Construction Fence | Permit Issued | RIVERSIDE DEVELOPERS USA | 06/09/2025 |
| DOB NOW | Plumbing | Permit Issued | TARGET PIPING NY LLC | 04/10/2025 |
| DOB NOW | Construction Fence | Permit Issued | CITY WIDE BUILDERS GRP IN | 06/10/2024 |
| DOB NOW | Foundation | Signed-off | HMF VENTURES | 06/08/2022 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/01/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/30/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/08/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/08/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 06/04/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 03/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/27/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/23/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 12/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/17/2025 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 11/17/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 09/15/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/30/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 03/28/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/21/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/30/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/26/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/13/2022 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 05/09/2022 | Fail-Final PL - Up to 9 Requested Floors | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/20/2026 | Air barrier - visual inspection | Jose Lockhart | energy_progress |
| 05/20/2026 | Vestibules | Jose Lockhart | energy_progress |
| 05/20/2026 | Maintenance information | Jose Lockhart | energy_progress |
| 05/20/2026 | Energy Code Compliance Inspections | Jose Lockhart | progress |
| 05/20/2026 | Concrete - Cast-In-Place | Jose Lockhart | special |
| 05/20/2026 | Masonry | Jose Lockhart | special |
| 05/20/2026 | Mastic and Intumescent Fire-resistant Coatings | Jose Lockhart | special |
| 05/20/2026 | Wall Panels, Curtain Walls, and Veneers | Jose Lockhart | special |
| 05/20/2026 | Post-installed Anchors | Jose Lockhart | special |
| 05/20/2026 | Fire-Resistant Penetrations and Joints | Jose Lockhart | special |
| 05/20/2026 | Air barrier continuity plan testing | Jose Lockhart | energy_progress |
| 05/20/2026 | Electrical motors and elevators | Jose Lockhart | energy_progress |
| 05/20/2026 | Exterior Insulation and Finish Systems (EIFS) | Jose Lockhart | special |
| 05/20/2026 | Fenestration and door U-factor and product ratings | Jose Lockhart | energy_progress |
| 05/20/2026 | Protection of exposed foundation insulation | Jose Lockhart | energy_progress |
| 05/20/2026 | Lighting controls | Jose Lockhart | energy_progress |
| 05/20/2026 | Air barrier — testing | Jose Lockhart | energy_progress |
| 05/20/2026 | Fireplaces | Jose Lockhart | energy_progress |
| 05/20/2026 | Insulation placement and R values | Jose Lockhart | energy_progress |
| 05/20/2026 | Lighting in dwelling units | Jose Lockhart | energy_progress |
| 05/20/2026 | Fenestration air leakage | Jose Lockhart | energy_progress |
| 05/20/2026 | Fenestration areas | Jose Lockhart | energy_progress |
| 05/20/2026 | Interior lighting power | Jose Lockhart | energy_progress |
| 05/20/2026 | Exterior lighting power | Jose Lockhart | energy_progress |
| 05/20/2026 | Metering | Jose Lockhart | energy_progress |