RoofUnder Construction16p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanical
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Sprinklers
NEW DUCTWORK, ASSOCIATED PIPING, NEW AC UNIT
On file for this project
3 documents · 1 drawing sheet
Dish: Installation of new telecommunication antenna sectors,GPS&equipment cabinet on new platform on roof. Installation of conduits&service room connection in cellar as per plans.All work is in compliance w/ TPPN 5/98. No change in use,egress or occupancy
On file for this project
3 documents · 1 drawing sheet
HEREBY FILING THIS APPLICATION TO ADDRESS AND COMPLY WITH ECB SUMMONS NUMBER 35382586K & 35382587M AS PER PLANS SUBMITTED.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 819p · 5 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing
Proposing herewith to install A/C units in an existing apartments 5Dand 8B as per plans filed. No change in use egress or occupancy
On file for this project
4 documents
MODIFICATIONS AND REPAIRS TO EXISTING GAS BOILERS TO BE LEGALIZED. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH DOB NOW JOB #: M00358544-I1.
On file for this project
24 documents
Rooftop condensing unit and 3 fan/coil units in dwelling. Removal of 3 existing Package Terminal air Conditioners and sealing of wall penetrations from within dwelling.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 79p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Plumbing
MINOR RENOVATION TO UNIT 7D. PARTIAL REMOVAL EXISTING NON-LOAD BEARING PARTITIONS AND CONSTRUCTION OF A NEW PARTITION AT THE EXISTING FOYER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Replacement of existing gas fired boiler. No change in use, egress or occupancy under this application. Filed in conjunction with DOB NOW plumbing job # M00677725-I1.
On file for this project
5 documents · 1 drawing sheet
APPLICATION HEREBY FILED TO PROPOSE REPLACEMENT OF A GAS FIRED COMBO-BOILER AS PER PLANS FILED.
On file for this project
15 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 622p · 4 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing
Relocate, replace and remove plumbing fixtures in Apartment 6D. No change to use, egress or occupancy.
On file for this project
25 documents
MODIFICATIONS AND REPAIRS TO EXISTING GAS BOILERS TO BE LEGALIZED. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH DOB NOW JOB #: M00358544-I1.
On file for this project
24 documents
MODIFICATIONS AND REPAIRS TO EXISTING TEN (10) GAS BOILERS TO BE LEGALIZED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ADDITIONAL FIVE (5) GAS BOILERS FILED UNDER SEPARATE DOB NOW JOB #: M00358505-I1.
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Floor 517p · 5 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
PROPOSED PLUMBING WORK ON 5TH FLOOR APT # 5B OF AN EXIST 8 STORY MIXED USE BUILDING. WORK INCLUDE INSTALLING 3 PIECE NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
7 documents · 3 drawing sheets
Interior modification to two existing bathrooms
On file for this project
16 documents
Proposing herewith to install A/C units in an existing apartments 5Dand 8B as per plans filed. No change in use egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 412p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
APPLICATION TO INSTALL NEW TUB, REPLACE FIXTURES AND RELOCATE LAV. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents
MODIFICATIONS AND REPAIRS TO EXISTING GAS BOILERS TO BE LEGALIZED. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH DOB NOW JOB #: M00358544-I1.
On file for this project
24 documents · 1 drawing sheet
MODIFICATIONS AND REPAIRS TO EXISTING TEN (10) GAS BOILERS TO BE LEGALIZED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ADDITIONAL FIVE (5) GAS BOILERS FILED UNDER SEPARATE DOB NOW JOB #: M00358505-I1.
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction16p · 4 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems
ALT-1 FILING TO CHANGE UNIT 2C's USE FROM OFFICE TO RESIDENTIAL UNIT WITH ASSOCIATED GENERAL CONSTRUCTION & WINDOW REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS.
On file for this project
17 documents
CONVERT EXISTING 2ND FLOOR COMMERCIAL SPACE TO RESIDENTIAL. NEW PARTITIONS, DOORS, FLOORING, CEILING AS PER PLANS FILED HEREWITH. PLUMBING, MECHANICAL AND SPRINKLER WORK FILED SEPARATELY.
On file for this project
16 documents · 1 drawing sheet
MODIFICATIONS AND REPAIRS TO EXISTING TEN (10) GAS BOILERS TO BE LEGALIZED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ADDITIONAL FIVE (5) GAS BOILERS FILED UNDER SEPARATE DOB NOW JOB #: M00358505-I1.
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Floor 2Under Construction45p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
ALT-1 FILING TO CHANGE UNIT 2C's USE FROM OFFICE TO RESIDENTIAL UNIT WITH ASSOCIATED GENERAL CONSTRUCTION & WINDOW REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS.
On file for this project
17 documents
CONVERT EXISTING 2ND FLOOR COMMERCIAL SPACE TO RESIDENTIAL. NEW PARTITIONS, DOORS, FLOORING, CEILING AS PER PLANS FILED HEREWITH. PLUMBING, MECHANICAL AND SPRINKLER WORK FILED SEPARATELY.
On file for this project
16 documents
NEW DUCTWORK, ASSOCIATED PIPING, NEW AC UNIT
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 19p · 3 filings · 20 docs
ElectricalMechanicalPlumbing
Issued Permit Scope
Antenna · Mechanical Systems · Plumbing
Replacement of existing gas meters in gas meter room at cellar level and replacement of gas piping from cellar thru 1st floor. No change in use, egress or occupancy under this application.
On file for this project
10 documents
Dish: Installation of new telecommunication antenna sectors,GPS&equipment cabinet on new platform on roof. Installation of conduits&service room connection in cellar as per plans.All work is in compliance w/ TPPN 5/98. No change in use,egress or occupancy
On file for this project
3 documents
INSTALLATION OF 2 NEW CONDENING UNITS AND ROTATION OF EXISTING UNIT BY 90 DEGREES ON FLOOR 001 AND ROOF. TOTAL CAPACITY IS 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Mezzanine4p · 1 filing · 12 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Installation of HVAC including four heat pumps and two condensers on the roof. No change to use, occupancy, or egress.
On file for this project
12 documents
Cellar7p · 3 filings · 16 docs
ElectricalFire ProtectionPlumbing
Issued Permit Scope
Antenna · Plumbing · Sprinklers
Replacement of existing gas meters in gas meter room at cellar level and replacement of gas piping from cellar thru 1st floor. No change in use, egress or occupancy under this application.
On file for this project
10 documents · 1 drawing sheet
Dish: Installation of new telecommunication antenna sectors,GPS&equipment cabinet on new platform on roof. Installation of conduits&service room connection in cellar as per plans.All work is in compliance w/ TPPN 5/98. No change in use,egress or occupancy
On file for this project
3 documents
HEREBY FILING THIS APPLICATION TO ADDRESS AND COMPLY WITH ECB SUMMONS NUMBER 35382586K & 35382587M AS PER PLANS SUBMITTED.
On file for this project
3 documents
Site & exterior5p · 3 filings · 8 docs
ElectricalEquipmentStructural
Issued Permit Scope
Antenna · Sidewalk Shed · Supported Scaffold
Dish: Installation of new telecommunication antenna sectors,GPS&equipment cabinet on new platform on roof. Installation of conduits&service room connection in cellar as per plans.All work is in compliance w/ TPPN 5/98. No change in use,egress or occupancy
On file for this project
3 documents · 12 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 2 drawing sheets
Filed — no permit issued28p · 1 filing · 15 docs
ArchitectureDMElectricalGeneralMechanicalPlumbing
ALT-1 FILING TO CHANGE UNIT 2C's USE FROM OFFICE TO RESIDENTIAL UNIT WITH ASSOCIATED GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS.
On file for this project
15 documents · 12 drawing sheets