Office with commercial, 1-6 stories
Van Alen Institute Library
28 WEST 22 STREET · BIN 1015541
💬 Discuss this project
1905Year Built
6Stories
O5Building Class
C6-4AZoning
27,410 sfGross Floor Area
9Units
LL97 Covered0 Open Violations
Office with commercial, 1-6 stories · Owner of record: 28-30 WEST 22ND STREET MANHATTAN LLC · 4,945 sf lot · 5.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof9p · 6 filings · 20 docs
Bulkhead2p · 1 filing · 3 docs
Floor 610p · 6 filings · 20 docs
Floor 59p · 6 filings · 20 docs
Floor 48p · 5 filings · 20 docs
Floor 37p · 4 filings · 20 docs
Floor 210p · 5 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar7p · 3 filings · 20 docs
Basement3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
28-30 WEST 22ND STREET MANHATTAN LL4707/08/2026
AKELIUS REAL ESTATE MGMT, LLC1507/08/2026
AKELIUS REAL ESTATE504/09/2026
ANDAMIO SCAFFOLDING LLC703/22/2026
TONE LLC STRUCTURE203/22/2026
AKELIUS103/22/2026
CEPRINE SCAFFOLDING SERVICES303/21/2026
SIERRA REAL ESTATE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/28/2018$31.5M—— → —$1,149/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE2403/21/2026
A1 EXPEDITING SERVICE CORP.403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
JLC CODE CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1907/08/2026
STRUCTURE TONE, LLCGeneral Contractor1507/08/2026
CAPITOL FIRE SPRINKLER COFire Protection907/08/2026
BLACK BULL BULDERS LLCGeneral Contractor707/08/2026
A & M WARSHAW PLBG & HTGPlumbing507/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor403/21/2026
COMMERICAL PLBG SVCES LLCPlumbing107/08/2026
GALAXY ELECTRIC CORPElectrical103/22/2026
TMS PLBG & HEATING CORPPlumbing107/08/2026
MP MASTER ELECTRIC LLCElectrical103/22/2026
MILL BROOK FIRE PROTECTIONFire Protection107/08/2026
4IR IDEAL INCGeneral Contractor107/08/2026
CS BRIDGE CORPGeneral Contractor107/08/2026
ROCK STAR RENOVATION LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CORTNEY WALLESTON ARCHITE3881111/15/2025
OUTSOURCE SPECIAL INSPECT28271011/06/2024
JACK GREEN ASSOCIATES422205/22/2024
ALLEN+KILLCOYNE ARCHITECT2697103/21/2024
Building Lifecycle
All (197)Filed (22)Permit Issued (41)Signed Off (17)Violation (60)Inspection (17)Objection (16)Special Inspection (24)
07/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2026
Signed off — Alteration
Interior renovation to existing commercial space. Installation of partitions for new shower and storage.
M01317663-S1
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Signed off — Alteration
Interior renovation to existing commercial space. Installation of partitions for new shower and storage.
M01317663-I1
02/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2026
Permit issued — Plumbing
M01317663-S1-PL
12/09/2025
Permit issued — General Construction
M01317663-I1-GC
11/15/2025
Filed — Alteration
Interior renovation to existing commercial space. Installation of partitions for new shower and storage.
M01317663-S1
11/15/2025
Filed — Alteration
Interior renovation to existing commercial space. Installation of partitions for new shower and storage.
M01317663-I1
11/11/2025
Special inspection requirement — Final
Cortney Walleston
11/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cortney Walleston
04/03/2025
Signed off — Alteration
(Build-out) Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M00221475-I1
12/30/2024
Violation issued (ECB, closed)
Boilers
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
11/12/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
11/12/2024
Special inspection requirement — Final
JONAR MADRIAGA
11/06/2024
Filed — Alteration
(Build-out) Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M00221475-P1
11/04/2024
Special inspection requirement — Final
JONAR MADRIAGA
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
11/04/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
10/24/2024
Signed off — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-S3
10/16/2024
Signed off — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-S1
09/24/2024
Signed off — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-S2
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2024
Signed off — Alteration
(Build-out) Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
M00221432-I1
09/19/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/14/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/14/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2024
Signed off — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-I1
07/30/2024
Signed off — Alteration
(Demo Phase) Modification to existing Sprinkler (installation of TCSP) as per plans filed herewith. No change in use, egress or occupancy under this application.
M00191337-I1
06/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2024
Permit issued — Sprinklers
M01019599-S3-EW-SP
06/19/2024
Objection resolved — Addressed
06/10/2024
Objection resolved — Addressed
06/10/2024
Objection resolved — Addressed
06/05/2024
Permit issued — General Construction
M01019599-I1-GC
06/05/2024
Objection resolved — Addressed
06/05/2024
Objection resolved — Addressed
06/05/2024
Objection resolved — Addressed
05/24/2024
Permit issued — Mechanical Systems
M01019599-S1-MS
05/24/2024
Objection raised — Mechanical
05/24/2024
Objection raised — Structural
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Structural
05/24/2024
Objection raised — Admin
05/24/2024
Objection raised — Structural
05/23/2024
Permit issued — Plumbing
M01019599-S2-PL
05/22/2024
Filed — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-S3
05/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/17/2024
Objection resolved — Addressed
04/15/2024
Objection raised — Scope
04/12/2024
Filed — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-S1
04/05/2024
Permit issued — General Construction
M01019599-I1-GC
03/21/2024
Filed — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-S2
03/21/2024
Filed — Alteration
Sprinkler work furnished and installed as indicated on the plans and as specified.
M01019599-I1
Latest 60 of 197 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP02/03/2026
DOB NOWGeneral ConstructionSigned-offROCK STAR RENOVATION LLC12/09/2025
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC06/25/2024
DOB NOWGeneral ConstructionSigned-offBLACK BULL BULDERS LLC06/05/2024
DOB NOWMechanical SystemsSigned-offBLACK BULL BULDERS LLC05/24/2024
DOB NOWPlumbingSigned-offCOMMERICAL PLBG SVCES LLC05/23/2024
DOB NOWGeneral ConstructionSigned-offBLACK BULL BULDERS LLC04/05/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/25/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/01/2023
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO06/05/2023
DOB NOWStructuralSigned-offSTRUCTURE TONE, LLC05/11/2023
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC05/11/2023
DOB NOWPlumbingSigned-offCAPITOL FIRE SPRINKLER CO01/23/2023
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO01/23/2023
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO01/12/2023
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG01/04/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/30/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/10/2022
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/09/2022
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO06/03/2022
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC05/13/2022
DOB NOWStructuralSigned-offSTRUCTURE TONE, LLC05/13/2022
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC02/02/2022
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG01/06/2022
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO12/09/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/14/2021
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/13/2021
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO04/20/2021
DOB NOWStructuralSigned-offSTRUCTURE TONE, LLC03/29/2021
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC03/29/2021
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG02/05/2021
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO12/08/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC12/04/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC12/01/2020
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC03/12/2020
DOB NOWSprinklersSigned-offA & M WARSHAW PLBG & HTG03/06/2020
DOB NOWStructuralSigned-offSTRUCTURE TONE, LLC03/05/2020
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO12/03/2019
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP12/02/2019
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG11/12/2019
+ 45 more permits on file
1 project · most recent 11/15/2025
Water/Sanitary
FiledStatusContractorScope
11/15/2025Signed-offTMS & SON PLUMBING LLCWater/Sanitary
9 projects · most recent 08/03/2025
General Wiring
FiledStatusContractorScope
08/03/2025CompleteMP MASTER ELECTRIC LLCGeneral Wiring
10/24/2024CompleteGALAXY ELECTRIC CORPGeneral Wiring
05/07/2024CompleteNEW YORK CITY ELECT SVCSGeneral Wiring
02/06/2024CompleteGALAXY ELECTRIC CORPGeneral Wiring
02/06/2024CompleteGALAXY ELECTRIC CORPGeneral Wiring
02/06/2024CompleteGALAXY ELECTRIC CORPGeneral Wiring
12/03/2020CompleteBOROWIDE ELECT'L CONTR'S—
08/06/2020CompleteJAM ELECTRICAL CORP—
10/04/2019CompleteGALAXY ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/14/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/14/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
11/11/2025FinalCortney Wallestonprogress
11/11/2025Fire-Resistant Penetrations and JointsCortney Wallestonspecial
11/12/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
11/12/2024Mechanical SystemsJONAR MADRIAGAspecial
11/12/2024FinalJONAR MADRIAGAprogress
11/04/2024FinalJONAR MADRIAGAprogress
11/04/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
11/04/2024Mechanical SystemsJONAR MADRIAGAspecial
05/13/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
03/14/2024Fire-Resistant Penetrations and JointsDaniel Allenspecial
03/14/2024Fire-Resistance Rated ConstructionStephen Killcoyneprogress
03/14/2024Sprinkler SystemsJACK GREENspecial
03/13/2024FinalStephen Killcoyneprogress
03/13/2024Mechanical SystemsJACK GREENspecial
03/13/2024FinalJACK GREENprogress
12/19/2023Standpipe SystemsJONAR MADRIAGAspecial
12/19/2023Sprinkler SystemsJONAR MADRIAGAspecial
12/13/2023Sprinkler SystemsJONAR MADRIAGAspecial
12/13/2023Standpipe SystemsJONAR MADRIAGAspecial
12/07/2020FinalSunil Saigalprogress
11/27/2019FinalKarol Zdancewiczprogress
10/30/2019HVAC and service water heating equipment Matthew Wavroenergy_progress
07/08/2019FinalJONAR MADRIAGAprogress
07/08/2019Mechanical SystemsJONAR MADRIAGAspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Biscuits & BathOtherFloor 1
Project M01019599 Alteration · LOC Issued · 03/21/2024
Akelius CorporateOffice—
Project M00221475 Alteration · LOC Issued · 02/25/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 493 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch8
09/01/2026M08011854-I1Request digital key ↗
08/27/2026M01019599-S1Request digital key ↗
08/27/2026M01019599-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/28/2026M00191337-I1Request digital key ↗
08/28/2026M00221511-I1Request digital key ↗
08/15/2026M00191337-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/28/2026M00191337-I1Request digital key ↗
08/28/2026M00221511-P1Request digital key ↗
08/28/2026M00221511-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00191274-I1Request digital key ↗
08/28/2026M00221511-P1Request digital key ↗
08/28/2026M00221511-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00189577-I1Request digital key ↗
09/05/2026M00221475-I1Request digital key ↗
08/15/2026M00221475-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00430346-I1Request digital key ↗
08/15/2026M00430346-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00273469-I1Request digital key ↗
09/04/2026M00430348-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00221432-I1Request digital key ↗
▸Applications & Permits109
▸BISPLAN / WORK APPROVAL APPLICATION60
01/28/2026100390033Open ↗
10/20/2025123822042Open ↗
06/25/2025123822042Open ↗
Showing 3 of 60 on file for this type
▸BISWORK PERMIT APPLICATION29
01/23/2024123822042Open ↗
08/26/2021140945789Open ↗
08/18/2021140922839Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWLPC Approval/Permit16
09/05/2026M00221432-I1Open ↗
08/28/2026M00191337-I1Open ↗
08/13/2026M00221511-P2Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
09/11/2023123822042Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026M00191274-I1Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM7
03/17/2020123822042Open ↗
03/17/2020123822042Open ↗
03/17/2020123822042Open ↗
Showing 3 of 7 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/22/2024123822042Open ↗
▸BISVERIFY TAX LOT1
08/11/2025123822042Open ↗
▸Seals & Professional Certifications98
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
03/10/2020123822042Open ↗
02/24/2020123822042Open ↗
10/30/2019123764774Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/05/2026M00191274-I1Open ↗
09/05/2026M00273469-I1Open ↗
09/05/2026M00221432-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/25/2026M00189577-I1Open ↗
09/07/2026M00191337-P2Open ↗
09/07/2026M00191337-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/28/2026M00430346-I1Open ↗
09/25/2026M00189577-I1Open ↗
09/25/2026M00189577-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
08/28/2019123764774Open ↗
05/24/2016122090557Open ↗
Showing 2 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
08/28/2019123764774Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
12/01/2016140579728Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
12/01/2016140579728Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/04/2017140579728Open ↗
01/04/2017140579728Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
02/24/2020123822042Open ↗
09/10/2019123822042Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
07/26/2023140945789Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00221432-I1Open ↗
08/28/2026M00221511-P1Open ↗
08/28/2026M00221511-P2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
02/24/2020123822042Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/05/2026M00191274-I1Open ↗
08/13/2026M00191337-I1Open ↗
08/13/2026M00189577-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/31/2019123764774Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
01/06/2017140579728Open ↗
Showing 1 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/06/2017140579728Open ↗
Showing 1 of 3 on file for this type
▸BISNYCECC EXEMPTION2
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00189577-I1Open ↗
08/13/2026M00191274-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/09/2015140331601Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/01/2016140579728Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY14
03/25/2024123822042Open ↗
03/18/2024140922839Open ↗
02/29/2024140922839Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/13/2023140945789Open ↗
11/14/2023140945789Open ↗
09/09/2020140945789Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
03/25/2024123822042Open ↗
11/01/2022123764774Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
07/26/2023140945789Open ↗
▸BISPOST-INSTALLED ANCHORS1
07/26/2023140945789Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/26/2023140945789Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
07/26/2023140945789Open ↗
▸Approvals, Objections & Sign-offs61
▸BISLANDMARKS APPROVAL17
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
02/10/2020123822042Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
10/20/2025123822042Open ↗
06/25/2025123822042Open ↗
08/08/2024123822042Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
03/25/2024140922839Open ↗
12/14/2023140945789Open ↗
08/21/2023101850524Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLANDMARKS SIGNOFF5
03/05/2024140922839Open ↗
01/19/2024123822042Open ↗
09/11/2023140945789Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/10/2020123822042Open ↗
02/10/2020123822042Open ↗
11/26/2019123822042Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
02/29/2024140922839Open ↗
07/26/2023140945789Open ↗
11/01/2022123764774Open ↗
▸BISSUPERSEDING LETTER1
05/05/2021123822042Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
08/14/2025123822042Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT19
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
09/10/2019123822042Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
08/14/2025123822042Open ↗
02/29/2024140922839Open ↗
09/11/2023140945789Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms37
▸BISADDITIONAL INFORMATION16
10/31/2025123822042Open ↗
07/18/2024123822042Open ↗
11/17/2023123822042Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET12
09/10/2019123822042Open ↗
08/28/2019123764774Open ↗
11/01/2017123169935Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/09/2020140945789Open ↗
08/12/2020140922839Open ↗
12/01/2016140579728Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
05/05/2021123822042Open ↗
04/26/2021123822042Open ↗
08/12/2020123822042Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
05/28/2024123169935Open ↗
05/28/2024122123004Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/09/2020140945789Open ↗
▸BISPLOT DIAGRAM1
09/10/2019123822042Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01019599-I1Open ↗