Miscellaneous one family
28 WEST 95 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031704
💬 Discuss this project
1893Year Built
3Stories
A9Building Class
R7-2Zoning
4,104 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous one family · 1,812 sf lot · 2.26 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 314p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
Sub-Basement14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS909/07/2026
ALEXIS CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2024$4.3M—THE HANS G. KOK TRUST → Private party$1,039/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP103/13/2026
BITOPI CONSULTANTS LLC102/05/2026
RJD ENGINEERING LLC411/06/2025
BAXT INGUI ARCHITECTS310/15/2025
GRASSO-MENZIUSO ARCHITECTS211/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALEXIS CONSTRUCTION INCGeneral Contractor704/09/2026
J & G CONSTRUCTION SVCSGeneral Contractor409/07/2026
SPICE ELECTRIC COMPANYElectrical203/22/2026
TT MECHANICAL CORPPlumbing207/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MACIA INSPECTION & TESTIN402711/06/2025
GRASSO-MENZIUSO ARCHITECT1279211/12/2021
Building Lifecycle
All (89)Filed (11)Permit Issued (13)Signed Off (4)Violation (2)Inspection (8)Objection (30)Special Inspection (21)
09/02/2026
Permit issued — Sidewalk Shed
M01355251-I1-SH
06/05/2026
Permit issued — Sidewalk Shed
M01355251-I1-SH
04/28/2026
Permit issued — Supported Scaffold
M01369599-I1-SF
04/10/2026
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-I1
04/07/2026
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-S4
04/06/2026
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-S2
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
03/25/2026
Objection raised — Other
03/25/2026
Objection raised — Other
03/13/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01369599-I1
02/18/2026
Violation issued (ECB, open)
Construction
02/18/2026
Violation issued (ECB, open)
Construction
02/06/2026
Permit issued — Sidewalk Shed
M01355251-I1-SH
02/05/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01355251-I1
11/06/2025
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-P3
11/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHUNG CHING JEN
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
CHUNG CHING JEN
11/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHUNG CHING JEN
11/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHUNG CHING JEN
11/05/2025
Special inspection requirement — Maintenance information
CHUNG CHING JEN
10/15/2025
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-P1
09/03/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/29/2025
Permit issued — Mechanical Systems
M01076024-S2-MS
08/19/2025
Permit issued — Structural
M01076024-S4-ST
08/19/2025
Permit issued — General Construction
M01076024-I1-GC
02/20/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/20/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2025
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-P2
01/28/2025
Special inspection requirement — Energy Code Compliance Inspections
CHUNG CHING JEN
01/28/2025
Special inspection requirement — Final
CHUNG CHING JEN
01/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHUNG CHING JEN
01/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHUNG CHING JEN
01/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHUNG CHING JEN
01/28/2025
Special inspection requirement — Maintenance information
CHUNG CHING JEN
01/28/2025
Special inspection requirement — Shutoff dampers
CHUNG CHING JEN
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
01/28/2025
Special inspection requirement — Mechanical Systems
CHUNG CHING JEN
12/24/2024
Permit issued — Structural
M01076024-S4-ST
11/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2024
Permit issued — Mechanical Systems
M01076024-S2-MS
11/06/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-S4
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
11/01/2024
Special inspection requirement — Energy Code Compliance Inspections
CHUNG CHING JEN
11/01/2024
Special inspection requirement — Final
CHUNG CHING JEN
11/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHUNG CHING JEN
10/15/2024
Permit issued — Plumbing
M01076024-S1-PL
10/09/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-S2
10/08/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-S1
09/18/2024
Permit issued — General Construction
M01076024-I1-GC
08/01/2024
Objection resolved — Addressed
08/01/2024
Objection resolved — Addressed
07/22/2024
Objection raised — Admin
07/22/2024
Objection raised — Other
07/09/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH RENOVATION THROUGHOUT EXISTING 4-STORY ONE FAMILY RESIDENTIAL BUILDING. INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK.
M01076024-I1
02/04/2022
Signed off — Alteration
Replace gas piping for 1 hotwater heater, 1 cook top, 1 dryer, 1 range. No change to use or egress.
M00538705-I1
12/20/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/06/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS09/02/2026
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS06/05/2026
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS04/28/2026
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS02/06/2026
DOB NOWMechanical SystemsSigned-offALEXIS CONSTRUCTION08/29/2025
DOB NOWStructuralSigned-offALEXIS CONSTRUCTION08/19/2025
DOB NOWGeneral ConstructionSigned-offALEXIS CONSTRUCTION08/19/2025
DOB NOWStructuralSigned-offALEXIS CONSTRUCTION12/24/2024
DOB NOWMechanical SystemsSigned-offALEXIS CONSTRUCTION11/13/2024
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP10/15/2024
DOB NOWGeneral ConstructionSigned-offALEXIS CONSTRUCTION09/18/2024
DOB NOWPlumbingSigned-offRENTOM GROUP CORP10/25/2021
DOB NOWPlumbingSigned-offRENTOM GROUP CORP09/27/2021
1 project · most recent 11/06/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/06/2025Signed-offALEXIS CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ2 48,000 BTU · Heat Pump Outdoor ×4
PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×2
PEFY-P18NMAU-E4 18,000 BTU · Vrf Indoor ×2
PEFY-P24NMU-E4 24,000 BTU · Vrf Indoor ×2
PVFY-P18NAMU-E1 18,000 BTU · Vrf Indoor ×2
PVFY-P24NAMU-E1 24,000 BTU · Vrf Indoor ×2
Ventilation
Panasonic FV-0511VK3 110 CFM · Exhaust Fan ×10
1 project · most recent 11/06/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/06/2025Permit IssuedA&H EXPRESS PLBG&HTG CORPGas, Storm, Water/Sanitary
2 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026Permit IssuedRICHARD NEU—
03/19/2025Permit IssuedSPICE ELECTRIC COMPANYGeneral Wiring
1 project · most recent 03/13/2026
Scaffold
FiledStatusContractorScope
03/13/2026Permit IssuedJ & G CONSTRUCTION SVCSScaffold
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/20/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/06/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/03/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/05/2025HVAC-R and service water heating equipmentCHUNG CHING JENenergy_progress
11/05/2025Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
11/05/2025Energy Code Compliance InspectionsCHUNG CHING JENprogress
11/05/2025HVAC-R and service water piping design and insulationCHUNG CHING JENenergy_progress
11/05/2025HVAC-R and service water heating system controlsCHUNG CHING JENenergy_progress
11/05/2025Maintenance informationCHUNG CHING JENenergy_progress
01/28/2025Energy Code Compliance InspectionsCHUNG CHING JENprogress
01/28/2025FinalCHUNG CHING JENprogress
01/28/2025HVAC-R and service water heating system controlsCHUNG CHING JENenergy_progress
01/28/2025HVAC-R and service water heating equipmentCHUNG CHING JENenergy_progress
01/28/2025HVAC-R and service water piping design and insulationCHUNG CHING JENenergy_progress
01/28/2025Maintenance informationCHUNG CHING JENenergy_progress
01/28/2025Shutoff dampersCHUNG CHING JENenergy_progress
01/28/2025Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
01/28/2025Mechanical SystemsCHUNG CHING JENspecial
11/01/2024Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
11/01/2024Energy Code Compliance InspectionsCHUNG CHING JENprogress
11/01/2024FinalCHUNG CHING JENprogress
11/01/2024Fire-Resistance Rated ConstructionCHUNG CHING JENprogress
11/23/2021Fire-Resistant Penetrations and JointsChristopher Menziusospecial
11/12/2021Fire-Resistant Penetrations and JointsChristopher Menziusospecial
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00538705-P1Request digital key ↗
08/25/2026M01076024-S2Request digital key ↗
08/25/2026M01076024-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/13/2026M01076024-P2Open ↗
08/13/2026M01076024-P3Open ↗
08/13/2026M01076024-P1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00538705-P1Open ↗
09/03/2026M00538705-I1Open ↗
08/19/2026M01355251-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M00538705-P1Open ↗
09/01/2026M01076024-P3Open ↗
08/27/2026M00538705-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M01076024-P3Open ↗
09/01/2026M01076024-P3Open ↗
08/27/2026M01076024-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M01076024-I1Open ↗
08/13/2026M01076024-S2Open ↗
08/13/2026M01076024-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00538705-P1Open ↗
08/15/2026M00538705-I1Open ↗