← Back
BuildNYC
One story - permanent living quarter
28 ZWICKY AVENUE
STATEN ISLAND · BIN 5053564
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R3-1Zoning
696 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: 28 Zwicky Ave · 4,700 sf lot · 0.15 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 3Under Construction7p · 2 filings · 20 docs
Floor 2Under Construction7p · 2 filings · 20 docs
Floor 1Under Construction12p · 3 filings · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
Site & exteriorUnder Construction2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC107/29/2026
Rampulla Associates Architects505/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rampulla Associates Architects603/21/2026
Largime Mujovic103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Raf General ContractingScaffold209/17/2026
Flow-Right Plumbing & HeatingPlumbing209/23/2026
Raf General ContractingGeneral Contractor107/08/2026
Sken ServicesGeneral Contractor104/09/2026
Raf General Contractingspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P Design Consultant8472112/11/2025
Building Lifecycle
11/09/2026
At time of inspection, observed balconies/terraces without guard installed. Conditions poses fall hazard that can lead to injury or death. ECB…
ECB violation · open
10/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2026
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
09/22/2026
Permit issued — Plumbing
S01421148-I1-PL
09/16/2026
Permit renewed — Construction Fence
Renewed without changes
S00460413-I1-FN
51 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFlow-Right Plumbing & Heating09/22/2026
DOB NOWConstruction FencePermit IssuedRaf General Contracting09/16/2026
DOB NOWPlumbingPermit IssuedFlow-Right Plumbing & Heating05/08/2026
DOB NOWStructuralPermit IssuedRaf General Contracting04/17/2026
DOB NOWGeneral ConstructionPermit IssuedRaf General Contracting04/17/2026
DOB NOWFull DemolitionSigned-offTT & T Construction12/08/2025
DOB NOWConstruction FencePermit IssuedRaf General Contracting03/05/2025
1 project · most recent 05/06/2026
Heating Systems Ventilation Systems
FiledStatusContractorScope
05/06/2026Permit IssuedRaf General ContractingHeating Systems, Ventilation Systems
1 project · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026Permit IssuedRidge ElectricGeneral Wiring
1 project · most recent 05/06/2026
Wood
FiledStatusContractorScope
05/06/2026Permit IssuedFlow-Right Plumbing & HeatingWood
1 project · most recent 02/20/2026
Fence
FiledStatusContractorScope
02/20/2026Permit IssuedRaf General ContractingFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2026Pass-Final SP - More than 10 Requested FloorsPassView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2026Pass-Final PL - UndergroundPassView ↗
05/29/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
11/18/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
11/18/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
11/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
11/18/2025Subgrade InspectionsStanislav Pilipenkospecial
11/18/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/18/2025Mechanical SystemsStanislav Pilipenkospecial
11/18/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
11/18/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
11/18/2025Structural Wood FrameStanislav Pilipenkoprogress
11/18/2025FinalStanislav Pilipenkoprogress
11/18/2025Lowest Floor ElevationStanislav Pilipenkoprogress
11/18/2025Footing and FoundationStanislav Pilipenkoprogress
11/18/2025Interior lighting powerStanislav Pilipenkoenergy_progress
11/18/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
11/18/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
11/18/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
11/18/2025Maintenance informationStanislav Pilipenkoenergy_progress
11/18/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
11/18/2025MeteringStanislav Pilipenkoenergy_progress
11/18/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
11/18/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
11/18/2025Fenestration areasStanislav Pilipenkoenergy_progress
11/18/2025Permanent certificateStanislav Pilipenkoenergy_progress
11/18/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
11/18/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
Latest 25 of 27.
72 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account