Roof35p · 2 filings · 20 docs
ArchitectureDMStructural
Issued Permit Scope
Foundation · General Construction
To provide accessibility though out the building, work includes removal and construction of non-bearing partitions, provide a new elevator hoist way, provide accessible toilet and bath rooms,modernize existg kitchen, provide accessible entrance.
On file for this project
16 documents · 2 drawing sheets
Provide openings in existing floors and roof for construction of new elevator hoist-way and pit in an existing 3 story and cellar building. Work is in conjunction with general construction alteration application S00492642. No change to Use egress or occ
On file for this project
17 documents · 1 drawing sheet
AtticUnder Construction40p · 2 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
The installation of a new sprinkler system and city water service into an existing Cellar and 3 story building with attic
On file for this project
12 documents
Replace heating and cooling systems in an existing non-profit organization with sleeping conditions.
On file for this project
20 documents
Floor 3Under Construction83p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Sprinklers
The installation of a new sprinkler system and city water service into an existing Cellar and 3 story building with attic
On file for this project
12 documents · 1 drawing sheet
Replace heating and cooling systems in an existing non-profit organization with sleeping conditions.
On file for this project
20 documents · 6 drawing sheets
To provide accessibility though out the building, work includes removal and construction of non-bearing partitions, provide a new elevator hoist way, provide accessible toilet and bath rooms,modernize existg kitchen, provide accessible entrance.
On file for this project
16 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2Under Construction113p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers
The installation of a new sprinkler system and city water service into an existing Cellar and 3 story building with attic
On file for this project
12 documents · 1 drawing sheet
Replace heating and cooling systems in an existing non-profit organization with sleeping conditions.
On file for this project
20 documents · 5 drawing sheets
To provide accessibility though out the building, work includes removal and construction of non-bearing partitions, provide a new elevator hoist way, provide accessible toilet and bath rooms,modernize existg kitchen, provide accessible entrance.
On file for this project
16 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1Under Construction114p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers
The installation of a new sprinkler system and city water service into an existing Cellar and 3 story building with attic
On file for this project
12 documents · 1 drawing sheet
Replace heating and cooling systems in an existing non-profit organization with sleeping conditions.
On file for this project
20 documents · 6 drawing sheets
To provide accessibility though out the building, work includes removal and construction of non-bearing partitions, provide a new elevator hoist way, provide accessible toilet and bath rooms,modernize existg kitchen, provide accessible entrance.
On file for this project
16 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
CellarUnder Construction115p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers
The installation of a new sprinkler system and city water service into an existing Cellar and 3 story building with attic
On file for this project
12 documents · 1 drawing sheet
Replace heating and cooling systems in an existing non-profit organization with sleeping conditions.
On file for this project
20 documents · 6 drawing sheets
To provide accessibility though out the building, work includes removal and construction of non-bearing partitions, provide a new elevator hoist way, provide accessible toilet and bath rooms,modernize existg kitchen, provide accessible entrance.
On file for this project
16 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Site & exterior3p · 2 filings · 13 docs
ArchitectureEquipmentGeneralMechanical
Issued Permit Scope
Construction Fence · General Construction
CONSTRUCTION FENCE AT THE SIDEWALK TO CLOSE THE CONSTRUCTION PROJECT.
On file for this project
3 documents · 3 drawing sheets
LEGALLY REMOVE EXISTING 3,000 GALLON BURIED OIL TANK IN REAR COURTYARD. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
10 documents · 10 drawing sheets
Filed — no permit issued32p · 2 filings · 6 docs
ArchitectureDMElectricalGeneralMechanicalPlumbingStructural
Support of excavation and removal of soil and installation of underpinning for existing footings inside the building for a proposed elevator pit
On file for this project
3 documents · 4 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 12 drawing sheets