1899Year Built
3Stories
C0Building Class
R6BZoning
2,880 sfGross Floor Area
3Units
3 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 2 filings · 20 docs
Floor 3Under Construction9p · 2 filings · 20 docs
Floor 2Under Construction6p · 1 filing · 7 docs
Floor 1Under Construction6p · 1 filing · 7 docs
CellarUnder Construction16p · 2 filings · 20 docs
BasementUnder Construction6p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY407/08/2026
HPD303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEVILLE ENGINEERING GROUP810/10/2024
HIRANI ENGINEERING AND LAND SURVEYI103/01/2024
ENTHINK ENGINEERS LLC108/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SCARANO ARCHITECT1603/21/2026
XPEDITE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BHY CONTRACTOR INCGeneral Contractor507/08/2026
GRANITE ENVIRONMENT, LLCGeneral Contractor303/21/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795610/10/2024
Building Lifecycle
All (23)Filed (10)Permit Issued (7)Signed Off (2)Objection (4)
02/26/2026
Permit issued — General Construction
B01093833-I1-GC
02/24/2026
Permit issued — General Construction
B01003866-I1-GC
11/14/2024
Permit issued — Mechanical Systems
B01003866-S3-MS
10/15/2024
Permit issued — Plumbing
B01003866-S2-PL
10/10/2024
Filed — Alteration
Proposed filing to reinstall the plumbing fixtures on the Cellar, Bas, 1st, 2nd & 3rd floor. No change to use, occupancy or egress under this application.
B01003866-P5
10/07/2024
Filed — Alteration
Proposed filing to reinstall the plumbing fixtures on the Cellar, Bas, 1st, 2nd & 3rd floor. No change to use, occupancy or egress under this application.
B01003866-S3
09/30/2024
Objection resolved — Addressed
09/30/2024
Objection resolved — Addressed
09/26/2024
Objection raised — Scope
09/26/2024
Objection raised — Other
09/23/2024
Filed — Alteration
Proposed filing to reinstall the plumbing fixtures on the Cellar, Bas, 1st, 2nd & 3rd floor. No change to use, occupancy or egress under this application.
B01003866-P4
09/11/2024
Filed — Alteration CO
B01093833-I1
05/24/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00915781-I1
05/14/2024
Filed — Alteration
Proposed filing to reinstall the plumbing fixtures on the Cellar, Bas, 1st, 2nd & 3rd floor. No change to use, occupancy or egress under this application.
B01003866-P3
04/10/2024
Filed — Alteration
Proposed filing to reinstall the plumbing fixtures on the Cellar, Bas, 1st, 2nd & 3rd floor. No change to use, occupancy or egress under this application.
B01003866-P2
04/09/2024
Permit issued — General Construction
B01003866-I1-GC
03/21/2024
Signed off — Alteration
B00953174-I1
03/15/2024
Filed — Alteration
Proposed filing to reinstall the plumbing fixtures on the Cellar, Bas, 1st, 2nd & 3rd floor. No change to use, occupancy or egress under this application.
B01003866-S2
03/14/2024
Permit issued — General Construction
B00953174-I1-GC
03/08/2024
Filed — Alteration
Proposed filing to reinstall the plumbing fixtures on the Cellar, Bas, 1st, 2nd & 3rd floor. No change to use, occupancy or egress under this application.
B01003866-I1
03/01/2024
Filed — Alteration
B00953174-I1
08/08/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00915781-I1
08/08/2023
Permit issued — Sidewalk Shed
B00915781-I1-SH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC02/26/2026
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC02/24/2026
DOB NOWMechanical SystemsPermit IssuedBHY CONTRACTOR INC11/14/2024
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.10/15/2024
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC04/09/2024
DOB NOWGeneral ConstructionSigned-offGRANITE ENVIRONMENT, LLC03/14/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC08/08/2023
1 project · most recent 10/10/2024
Storm Water/Sanitary
FiledStatusContractorScope
10/10/2024Permit IssuedAMERICAN STANDARD P&H CORStorm, Water/Sanitary
2 projects · most recent 08/08/2023
FiledStatusContractorScope
08/08/2023CompleteRICHARD NEU—
11/16/2020CompleteWATTS ELECTRICAL CORP4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
10/15/2024Insulation placement and R valuesMICHAEL KARANTINIDIS, P.E.energy_progress
10/15/2024Air barrier - visual inspectionMICHAEL KARANTINIDIS, P.E.energy_progress
10/15/2024Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
10/15/2024FinalMICHAEL KARANTINIDIS, P.E.progress
10/15/2024Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
10/15/2024Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
10/15/2024Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
10/15/2024Fenestration air leakageMICHAEL KARANTINIDIS, P.E.energy_progress
10/15/2024Fenestration areasMICHAEL KARANTINIDIS, P.E.energy_progress
10/15/2024Lighting in dwelling unitsMICHAEL KARANTINIDIS, P.E.energy_progress
10/15/2024Fenestration and door U-factor and product ratingsMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
10/07/2024Air barrier - visual inspectionMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024Fenestration air leakageMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
10/07/2024Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
10/07/2024FinalMICHAEL KARANTINIDIS, P.E.progress
10/07/2024Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
10/07/2024Insulation placement and R valuesMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024Lighting in dwelling unitsMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024Fenestration areasMICHAEL KARANTINIDIS, P.E.energy_progress
10/07/2024Fenestration and door U-factor and product ratingsMICHAEL KARANTINIDIS, P.E.energy_progress
09/09/2024Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
Latest 25 of 48.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00915781-I1Request digital key ↗
08/25/2026B00953174-I1Request digital key ↗
08/24/2026B01093833-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01093833-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature44
09/01/2026B00953174-I1Open ↗
08/30/2026B01003866-P3Open ↗
08/30/2026B01003866-P3Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026B00915781-I1Open ↗
08/25/2026B00953174-I1Open ↗
08/24/2026B01093833-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026B01003866-P3Open ↗
08/27/2026B01003866-P5Open ↗
08/27/2026B01003866-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01093833-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026B00953174-I1Open ↗
08/24/2026B01093833-I1Open ↗
08/24/2026B01003866-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B01003866-P5Open ↗
08/13/2026B01003866-P2Open ↗
08/13/2026B01003866-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification1
08/24/2026B01093833-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01093833-I1Open ↗