← Back
Miscellaneous warehouse
280 JOHNSON AVENUE
BROOKLYN · BIN 3325872
💬 Discuss this project
1958Year Built
1Stories
E9Building Class
M1-2Zoning
31,450 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous warehouse · Owner of record: PE 280 JOHNSON AVENUE, LLC, A DELAWARE L TD LIAB CO · 52,499 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction54p · 5 filings · 20 docs
Floor 1Under Construction73p · 7 filings · 20 docs
MezzanineUnder Construction76p · 6 filings · 20 docs
CellarUnder Construction41p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROLOGIS4607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/07/2021$27.5M—GREENPOINT PROJECT, LLC, A NY LIMITED LIABILITY CO → PE 280 JOHNSON AVENUE, LLC, A DELAWARE LTD LIAB CO$874/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP503/21/2026
RPO203/21/2026
CONVERSANO ASSOCIATES, INC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CNY BUILDING CORPGeneral Contractor1503/21/2026
TRI STATE CONSTRUCTION COGeneral Contractor404/09/2026
TRI-STATE DISMANTLING CORPGeneral Contractor203/21/2026
A PLUS PLUMBING CORPPlumbing207/08/2026
A + SPRINKLER CORPFire Protection107/08/2026
PATRIOT ELECTRIC CORPElectrical103/22/2026
KAPNAG HTG & PLBG CORP.Plumbing106/14/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003312/29/2025
ATLAS ATC ENGINEERING INC8011703/07/2024
ATLANTIC ENGINEERINGLABOR1381201/02/2024
Building Lifecycle
All (90)Filed (23)Permit Issued (12)Signed Off (1)Inspection (8)Objection (16)Special Inspection (30)
09/17/2026
Objection resolved — Resolved
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2026
Objection raised — Other
03/06/2026
Permit issued — Mechanical Systems
B01301782-S1-MS
03/05/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
03/04/2026
Filed — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATIONS TO EXISTING COMMERCIAL / WAREHOUSE SPACE (APPROXIMATELY 29,000 S.F.)
B01301782-P3
01/29/2026
Filed — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATIONS TO EXISTING COMMERCIAL / WAREHOUSE SPACE (APPROXIMATELY 29,000 S.F.)
B01301782-P2
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
01/23/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
01/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/12/2026
Permit issued — Plumbing
B01301782-S2-PL
01/07/2026
Filed — Alteration CO
MINOR INTERIOR PARTITIONS, INCREASE IN OCCUPANT LOAD OF BUILDING
B01333132-I1
12/29/2025
Filed — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATIONS TO EXISTING COMMERCIAL / WAREHOUSE SPACE (APPROXIMATELY 29,000 S.F.)
B01301782-S1
12/19/2025
Special inspection requirement — Heating Systems
Christopher Drutjons
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
12/19/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
12/19/2025
Special inspection requirement — Shutoff dampers
Christopher Drutjons
12/15/2025
Filed — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATIONS TO EXISTING COMMERCIAL / WAREHOUSE SPACE (APPROXIMATELY 29,000 S.F.)
B01301782-S2
11/05/2025
Permit issued — General Construction
B01301782-I1-GC
10/30/2025
Filed — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATIONS TO EXISTING COMMERCIAL / WAREHOUSE SPACE (APPROXIMATELY 29,000 S.F.)
B01301782-P1
10/30/2025
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Drutjons
10/30/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
10/30/2025
Special inspection requirement — Structural Steel - Welding
Christopher Drutjons
10/30/2025
Special inspection requirement — Metering
Christopher Drutjons
10/30/2025
Special inspection requirement — Structural Cold-Formed Steel
Christopher Drutjons
10/30/2025
Special inspection requirement — Metering
Christopher Drutjons
10/30/2025
Special inspection requirement — Interior lighting power
Christopher Drutjons
10/30/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
10/30/2025
Special inspection requirement — Electrical motors and elevators
Christopher Drutjons
10/30/2025
Special inspection requirement — Lighting controls
Christopher Drutjons
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
10/30/2025
Special inspection requirement — Structural Cold-Formed Steel
Christopher Drutjons
10/30/2025
Special inspection requirement — Interior lighting power
Christopher Drutjons
10/29/2025
Filed — Alteration
MECHANICAL WORK FOR THE INTERIOR RENOVATIONS TO EXISTING COMMERCIAL / WAREHOUSE SPACE (APPROXIMATELY 29,000 S.F.)
B01301782-I1
03/07/2024
Filed — Alteration
Mechanical modifications on the 1st, mezzanine and roof floors as per plans filed herewith. No change you use egress or occupancy.
B00690789-P2
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTRI STATE CONSTRUCTION CO03/06/2026
DOB NOWPlumbingSigned-offKAPNAG HTG & PLBG CORP.01/12/2026
DOB NOWGeneral ConstructionPermit IssuedTRI STATE CONSTRUCTION CO11/05/2025
DOB NOWPlumbingPermit IssuedA PLUS PLUMBING CORP04/11/2023
DOB NOWGeneral ConstructionPermit IssuedCNY BUILDING CORP03/23/2023
DOB NOWMechanical SystemsPermit IssuedCNY BUILDING CORP03/23/2023
DOB NOWMechanical SystemsPermit IssuedCNY BUILDING CORP06/22/2022
DOB NOWSprinklersPermit IssuedA + SPRINKLER CORP05/27/2022
DOB NOWPlumbingPermit IssuedA PLUS PLUMBING CORP05/11/2022
DOB NOWGeneral ConstructionPermit IssuedCNY BUILDING CORP03/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offTRI-STATE DISMANTLING COR02/09/2022
DOB NOWGeneral ConstructionPermit IssuedCNY BUILDING CORP01/27/2022
2 projects · most recent 03/04/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2026Permit IssuedTRI STATE CONSTRUCTION COHeating Systems, Ventilation Systems
Heating
Gordonray BH-100-30A 100,000 CFM · Unit Heater ×1
BH-100-35A 100,000 BTU · Unit Heater ×1
BH-80-20A 80,000 BTU · Unit Heater ×1
Ventilation
Greenheck CSP-A700-VG 500 CFM · Exhaust Fan ×1
03/07/2024Permit IssuedCNY BUILDING CORPHeating Systems
Heating
Indeeco CDIR 6,826 BTU · Unit Heater ×6
1 project · most recent 03/07/2024
FiledStatusContractorScope
03/07/2024Permit IssuedA + SPRINKLER CORP192 heads
2 projects · most recent 03/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/04/2026Signed-offKAPNAG HTG & PLBG CORP.Gas, Water/Sanitary
03/07/2024Permit IssuedA PLUS PLUMBING CORPGas, Water/Sanitary
4 projects · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
11/06/2023CompletePATRIOT ELECTRIC CORPGeneral Wiring
11/03/2022CompletePATRIOT ELECTRIC CORP1 meters
02/25/2022CompletePATRIOT ELECTRIC CORP—
2 projects · most recent 03/04/2026
Steel Concrete
FiledStatusContractorScope
03/04/2026Permit IssuedTRI STATE CONSTRUCTION COSteel
01/02/2024——Steel, Concrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
03/05/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
03/05/2026Maintenance informationChristopher Drutjonsenergy_progress
03/05/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
03/05/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
01/23/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
01/23/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
01/23/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
01/23/2026Maintenance informationChristopher Drutjonsenergy_progress
12/19/2025Heating SystemsChristopher Drutjonsspecial
12/19/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
12/19/2025Shutoff dampersChristopher Drutjonsenergy_progress
12/19/2025Maintenance informationChristopher Drutjonsenergy_progress
12/19/2025HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
12/19/2025HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
12/19/2025Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
12/19/2025Energy Code Compliance InspectionsChristopher Drutjonsprogress
10/30/2025Energy Code Compliance InspectionsChristopher Drutjonsprogress
10/30/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
10/30/2025Structural Cold-Formed SteelChristopher Drutjonsspecial
10/30/2025Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
10/30/2025Structural Steel - DetailsChristopher Drutjonsspecial
10/30/2025Structural Steel - WeldingChristopher Drutjonsspecial
10/30/2025FinalChristopher Drutjonsprogress
10/30/2025Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
10/30/2025Structural Wood FrameChristopher Drutjonsprogress
Latest 25 of 87.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/31/2026B00656523-P1Request digital key ↗
08/31/2026B00656523-I1Request digital key ↗
08/31/2026B00656523-P2Request digital key ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/31/2026B00656523-I1Open ↗
08/31/2026B00656523-P2Open ↗
08/31/2026B00656523-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026B01301782-S1Open ↗
09/02/2026B00690789-P1Open ↗
09/01/2026B00690852-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/25/2026B01301782-P2Open ↗
09/23/2026B01301782-S1Open ↗
09/23/2026B01301782-S1Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist1
08/13/2026B01333132-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01333132-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01333132-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01333132-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/31/2026B00656523-P1Open ↗
08/31/2026B00656523-I1Open ↗
08/31/2026B00656523-P2Open ↗
Showing 3 of 22 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/19/2026B01333132-I1Open ↗