← Back
BuildNYC
Elevator apt, semi-fireproof without stores
280 LONGSTREET AVENUE
BRONX · BIN 2078917
💬 Discuss this project
1965Year Built
7Stories
D1Building Class
R4AZoning
63,749 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized94 Active Violations 89 unresolved · 5 paperwork only 15 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · Owner of record: 280 Longstreet · 19,900 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLangsam Property ServicesUnder Construction1p · 1 filing · 10 docs
Sub-BasementLangsam Property Services6p · 3 filings · 20 docs
Site & exteriorLangsam Property ServicesUnder Construction29p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sheva Realty LLC Dba S M203/21/2026
280 Longstreet103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A.P. Associates205/28/2024
New York & Company405/15/2024
Jose M. Landauro, P.E.212/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
Sandeep Kaur203/21/2026
Right Way Services NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Coast GroupScaffold707/08/2026
Coast GroupGeneral Contractor407/08/2026
Total NY ConstructionScaffold407/08/2026
Calray Gas HeatPlumbing307/08/2026
Casa MechanicalPlumbing108/13/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AP Professional Engineering5974105/28/2024
Jose M. Landauro3500212/12/2023
New York Engineering Associates851212/21/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/21/2026
Failure to maintain elevator in code complaint manner as per bc 3001.2 & 27-987 class 1 violation: emergency communication device inoperative, this…
ECB violation · open
08/18/2026
At the time of inspection of a 6-story building under facades repairs, i observed workers using pipe scaffolding, upon requesting the competent…
ECB violation · closed
08/18/2026
At time of inspection of the 6-story alteration job, supported scaffolding was observed erected with loose vertical netting that was not properly…
ECB violation · open
08/18/2026
At the time of inspection of a 6-story building under facades repairs, i observed plastic jersey barriers and porta-potty obstruction the roadway…
ECB violation · open
261 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCoast Group06/15/2026
DOB NOWSupported ScaffoldPermit IssuedCoast Group05/04/2026
DOB NOWSidewalk ShedPermit IssuedCoast Group01/20/2026
DOB NOWGeneral ConstructionPermit IssuedCoast Group06/03/2025
DOB NOWSupported ScaffoldPermit IssuedCoast Group05/05/2025
DOB NOWSidewalk ShedPermit IssuedCoast Group02/07/2025
DOB NOWGeneral ConstructionPermit IssuedCoast Group06/12/2024
DOB NOWSupported ScaffoldPermit IssuedCoast Group05/28/2024
DOB NOWSidewalk ShedPermit IssuedCoast Group02/29/2024
DOB NOWSidewalk ShedPermit IssuedTotal NY Construction03/02/2023
DOB NOWBoiler EquipmentSigned-offCalray Gas Heat05/02/2022
DOB NOWPlumbingPermit IssuedCalray Gas Heat05/02/2022
DOB NOWBoiler EquipmentSigned-offCalray Gas Heat05/02/2022
DOB NOWSidewalk ShedPermit IssuedTotal NY Construction02/28/2022
BISPLISSUEDCasa Mechanical08/13/2014
BISFBISSUEDIrving Bauer03/19/2002
1 project · most recent 05/15/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/15/2024Permit IssuedSanitary Plumbing & HeatingGas, Water/Sanitary
4 projects · most recent 07/20/2026
General Wiring Boiler Controls
FiledStatusContractorScope
07/20/2026Permit IssuedDenali ElectricGeneral Wiring
04/04/2024CompleteCoachmen SolutionsBoiler Controls
03/09/2022Permit IssuedBDS Electric—
08/06/2018Permit IssuedSega ElectricGeneral Wiring
1 project · most recent 05/28/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/28/2024Permit IssuedCoast GroupScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/03/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/28/2024Post-installed AnchorsGURVINDER SINGHspecial
05/28/2024Alternative Materials - OTCR Buildings Bulletin NumberGURVINDER SINGHspecial
05/16/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
05/13/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
12/13/2023Air barrier - visual inspectionJOSE LANDAUROenergy_progress
12/13/2023Structural Stability – Alterations of existing buildingsJOSE LANDAUROspecial
12/13/2023MasonryJOSE LANDAUROspecial
12/13/2023Tenant Protection Plan ComplianceJOSE LANDAUROspecial
12/13/2023FinalJOSE LANDAUROprogress
10/28/2021Maintenance informationLOUIS ARENAenergy_progress
10/28/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/28/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/28/2021Heating SystemsLOUIS ARENAspecial
47 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account