← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Soundings Condominium
280 RECTOR PLACE · BIN 1065199
💬 Discuss this project
1985Year Built
9Stories
RMBuilding Class
BPCZoning
81,667 sfGross Floor Area
122Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: SOUNDINGS CONDOMINIUM · 15,000 sf lot · 5.44 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 6 filings · 20 docs
Floor 71p · 1 filing · 4 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
10 jobs · most recent 06/30/2026
General Wiring
FiledStatusContractorScope
06/30/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
04/02/2026CompleteARGON ELECTRICAL CORP—
01/28/2026CompleteARGON ELECTRICAL CORP—
08/26/2024CompleteL.D.M. ELECTL CONTRS INCGeneral Wiring
01/19/2023CompleteASCUATECH ELECTRICAL CORP—
08/18/2021CompleteTOPLINE ELECTRIC CORP—
06/03/2021CompleteTOPLINE ELECTRIC CORP—
02/19/2021CompleteGPN ELECTRIC CORPGeneral Wiring
08/21/2019CompleteL.D.M. ELECTL CONTRS INCGeneral Wiring
09/11/2018Permit IssuedTOPLINE ELECTRIC CORPGeneral Wiring
1 job · most recent 07/16/2026
Sidewalk Shed
FiledStatusContractorScope
07/16/2026Permit IssuedSTRUCTURAL PRESERV SYSTEMSidewalk Shed
2 jobs · most recent 04/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/02/2026Permit IssuedSTRUCTURAL PRESERVATION SSuspended Scaffold (SC)
04/14/2025Permit IssuedSTREAMLINE CONSULTANTS NY—
Building Lifecycle
All (130)Filed (20)Permit Issued (15)Signed Off (9)Facade (FISP) (12)Violation (35)Inspection (6)Objection (3)Special Inspection (30)
07/21/2026
Permit issued — General Construction
M01360773-I1-GC
07/16/2026
Filed — Alteration
FILING HEREWITH FOR FACADE REPAIRS AS PER DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01360773-S1
07/16/2026
Permit issued — Sidewalk Shed
M01360773-S1-SH
06/30/2026
Permit issued — Suspended Scaffold
M01370106-I1-SC
05/04/2026
Filed — Alteration
FILING HEREWITH FOR FACADE REPAIRS AS PER DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01360773-I1
04/09/2026
Permit issued — Suspended Scaffold
M01370106-I1-SC
04/02/2026
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Darius Janczak
M01370106-I1
03/10/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ALEXIS SCHLESSINGERMAN
03/10/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
02/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jennifer Sze
02/17/2026
Special inspection requirement — Masonry
Jennifer Sze
02/17/2026
Special inspection requirement — Final
Jennifer Sze
01/22/2026
Signed off — Alteration
REMOVE (1) EXISTING HOT WATER HEATER AND REPLACE (2) NEW HOT WATER HEATERS IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M01010460-I1
12/03/2025
Permit issued — Suspended Scaffold
M01187556-I1-SC
09/22/2025
Permit issued — Suspended Scaffold
M01187556-I1-SC
04/18/2025
Objection raised — Other
04/14/2025
Filed — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
M01187556-P1
03/24/2025
Objection resolved — Addressed
03/18/2025
Objection raised — Other
03/17/2025
Filed — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
M01187556-I1
01/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
PAUL REVANS
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL REVANS
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
01/22/2025
Special inspection requirement — Maintenance information
PAUL REVANS
01/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
01/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
01/21/2025
Filed — Alteration
REMOVE (1) EXISTING HOT WATER HEATER AND REPLACE (2) NEW HOT WATER HEATERS IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M01010460-P3
01/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
PAUL REVANS
01/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
01/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
01/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
01/17/2025
Special inspection requirement — Maintenance information
PAUL REVANS
01/17/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL REVANS
01/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
01/08/2025
Filed — Alteration
REMOVE (1) EXISTING HOT WATER HEATER AND REPLACE (2) NEW HOT WATER HEATERS IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M01010460-P2
10/30/2024
Signed off — Alteration
Minor non-structural partition layout changes in order to combine apartments 9N and 9M, and new finishes, fixtures and equipment throughout at apartment 9M.
M00945852-S1
10/30/2024
Signed off — Alteration
Minor non-structural partition layout changes in order to combine apartments 9N and 9M, and new finishes, fixtures and equipment throughout at apartment 9M.
M00945852-I1
10/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
PAUL REVANS
10/25/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL REVANS
10/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
10/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
10/25/2024
Special inspection requirement — Maintenance information
PAUL REVANS
10/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
08/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2024
Filed — Alteration
REMOVE (1) EXISTING HOT WATER HEATER AND REPLACE (2) NEW HOT WATER HEATERS IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M01010460-P1
04/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2024
Permit issued — Plumbing
M01010460-I1-PL
03/12/2024
Filed — Alteration
REMOVE (1) EXISTING HOT WATER HEATER AND REPLACE (2) NEW HOT WATER HEATERS IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M01010460-I1
03/04/2024
Signed off — Alteration
TERRACE ROOF REPLACEMENT ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M08022875-I1
03/01/2024
Permit issued — General Construction
M08022875-I1-GC
02/08/2024
Permit issued — Plumbing
M00945852-S1-PL
02/01/2024
Permit issued — General Construction
M00945852-I1-GC
01/24/2024
Special inspection requirement — Final
Anthony Stasio
01/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
01/24/2024
Special inspection requirement — Masonry
Anthony Stasio
01/15/2024
Filed — Alteration
TERRACE ROOF REPLACEMENT ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M08022875-P1
Latest 60 of 130 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES509/13/2026
KINGS GROUP NY107/17/2026
MILFORD MANAGEMENT1107/08/2026
PYRAMID RESTORATION NY507/08/2026
MILSTEIN PROPERTIES403/22/2026
T-MOBILE303/22/2026
BROWN HARRIS STEVENS203/22/2026
SOUNDINGS CONDOMINIUM C OLIB303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMA DESIGNS LLC107/16/2026
SOCOTEC, INC.105/04/2026
REVANS DESIGN PE PC401/21/2025
EDG301/15/2024
INGA OREN ARCHITECT, P.C.212/20/2023
REFORM ARCHITECTURE PLLC206/05/2023
GREGORY NOWAK109/08/2021
KORMAN DESIGN & BUILD204/20/2021
ANASTASIO ARCHITECTS112/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING203/21/2026
PYRAMID RESTORATION NY403/21/2026
R GERMAIN803/21/2026
KENNY LEE ARCHITECT203/21/2026
LMS-ACE SERVICES103/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
ISTAY CONSULTING403/21/2026
YBL NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOTHAM COMMUNICATIONS LLCGeneral Contractor303/21/2026
BEK PLBG & HTG LLCPlumbing307/08/2026
DUN DOIRE DESIGN INCGeneral Contractor203/21/2026
HAP CONSTRUCTION LLCGeneral Contractor107/08/2026
KINGS GROUP NY CORPGeneral Contractor107/17/2026
STRUCTURAL PRESERV SYSTEMGeneral Contractor107/22/2026
TRADITIONAL WATERPROOFINGGeneral Contractor107/08/2026
CC CONTROLLED PLBG CO.,INPlumbing107/08/2026
J&M PLUMBING OF WESTCHESTERPlumbing107/08/2026
MARIO CASTROElectrical103/21/2026
NYC PLUMBING & HEATING INPlumbing107/08/2026
TOPLINE ELECTRIC CORPElectrical103/22/2026
A DAMIAN CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC, INC.301105/04/2026
SOCOTEC ENGINEERING4983104/02/2026
REVANS DESIGN PE PC4617401/21/2025
EDG2578201/15/2024
STEEL CORE ENGINEERING PL1098212/20/2023
KORMAN DESIGN & BUILD2055204/20/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM07/21/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP07/16/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S06/30/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S04/09/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/03/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY09/22/2025
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO.,IN04/01/2024
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING03/01/2024
DOB NOWPlumbingSigned-offBEK PLBG & HTG LLC02/08/2024
DOB NOWGeneral ConstructionSigned-offA DAMIAN CONSTRUCTION INC02/01/2024
DOB NOWGeneral ConstructionSigned-offHAP CONSTRUCTION LLC12/16/2022
DOB NOWGeneral ConstructionSigned-offGOTHAM COMMUNICATIONS LLC09/21/2021
DOB NOWPlumbingSigned-offJ&M PLUMBING OF WESTCHEST05/25/2021
DOB NOWGeneral ConstructionSigned-offDUN DOIRE DESIGN05/01/2021
DOB NOWPlumbingSigned-offNYC PLUMBING & HEATING IN02/16/2021
BISOTISSUEDDANNA BROTHERS CONTRACTOR09/29/2021
BISOTISSUEDDANNA BROTHERS CONTRACTOR02/08/2021
BISOTISSUEDA DAMIAN CONSTRUCTION INC04/23/2019
BISPLISSUEDALL HOUR SEWER SERVICE CO.01/28/2019
BISPLISSUEDPLUMBING & HTG DOCTOR INC09/28/2018
BISOTISSUEDA DAMIAN CONSTRUCTION INC09/14/2018
BISMHISSUEDPLANET MECHANICAL CORP03/26/2018
BISMHISSUEDPLANET MECHANICAL CORP11/09/2017
BISPLISSUEDJUST PLBG & HTG INC07/19/2017
BISOTISSUEDGUSTO INTERIORS INC07/13/2017
BISMHISSUEDGUSTO INTERIORS INC07/13/2017
BISMHISSUEDRENOVATION BY MY HOME INC07/10/2017
BISPLISSUEDNICE PLUMBING CORP07/07/2017
BISOTISSUEDRENOVATION BY MY HOME INC06/30/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC12/02/2016
BISOTISSUEDMCMANUS MECHANICAL MAINTA11/03/2016
BISPLISSUEDMCMANUS MECH MAINT P&H INC11/03/2016
BISOTISSUEDDUN DOIRE DESIGN INC04/28/2016
BISPLISSUEDJ&M PLUMBING OF WESTCHESTER03/25/2016
BISOTISSUEDDUN DOIRE DESIGN INC09/03/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC08/11/2015
BISOTISSUEDALB-BROS CONSTR CORP05/22/2015
BISOTISSUEDVERTICAL SOLUTIONS INC03/25/2015
BISPLISSUEDGO GREENER PLUMBING LLC02/03/2015
BISOTISSUEDALB-BROS CONSTR CORP02/02/2015
+ 24 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
03/10/2026Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
03/10/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
02/17/2026Tenant Protection Plan ComplianceJennifer Szespecial
02/17/2026MasonryJennifer Szespecial
02/17/2026FinalJennifer Szeprogress
01/22/2025Tenant Protection Plan CompliancePAUL REVANSspecial
01/22/2025Fire-Resistant Penetrations and JointsPAUL REVANSspecial
01/22/2025Energy Code Compliance InspectionsPAUL REVANSprogress
01/22/2025HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
01/22/2025Maintenance informationPAUL REVANSenergy_progress
01/22/2025HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
01/22/2025HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
01/17/2025Tenant Protection Plan CompliancePAUL REVANSspecial
01/17/2025HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
01/17/2025HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
01/17/2025HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
01/17/2025Maintenance informationPAUL REVANSenergy_progress
01/17/2025Energy Code Compliance InspectionsPAUL REVANSprogress
01/17/2025Fire-Resistant Penetrations and JointsPAUL REVANSspecial
10/25/2024Tenant Protection Plan CompliancePAUL REVANSspecial
10/25/2024Energy Code Compliance InspectionsPAUL REVANSprogress
10/25/2024HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
10/25/2024HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
10/25/2024Maintenance informationPAUL REVANSenergy_progress
10/25/2024HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
Latest 25 of 48.
▾Documents — 426 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/03/2026M00489481-I1Request digital key ↗
09/03/2026M00489595-I1Request digital key ↗
09/03/2026M00582686-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00433366-I1Request digital key ↗
▸Applications & Permits68
▸BISWORK PERMIT APPLICATION37
09/29/2021140978486Open ↗
09/28/2021140978486Open ↗
01/22/2021140978486Open ↗
Showing 3 of 37 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION31
06/28/2024140978486Open ↗
12/31/2020140978486Open ↗
11/17/2020140978486Open ↗
Showing 3 of 31 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
10/22/2019140787352Open ↗
05/29/2019121238302Open ↗
12/24/2018123184543Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026M01010460-P2Open ↗
09/01/2026M01010460-P2Open ↗
09/01/2026M01010460-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00489481-I1Open ↗
09/03/2026M00582686-I1Open ↗
08/31/2026M08046015-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026M01010460-P2Open ↗
09/01/2026M08022875-P1Open ↗
08/30/2026M08022875-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
10/02/2017123184543Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/02/2017123184543Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/17/2020140978486Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/17/2020140978486Open ↗
07/30/2018140787352Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
06/29/2017123294014Open ↗
06/27/2017121238302Open ↗
06/21/2017121238302Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
10/13/2015122139505Open ↗
10/13/2015122139505Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/24/2018123184543Open ↗
12/24/2018123184543Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
07/30/2018140787352Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/24/2018123184543Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
04/12/2016122463253Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes5
07/30/2018140787352Open ↗
10/02/2017123184543Open ↗
06/29/2017123294014Open ↗
Showing 3 of 5 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/15/2021140978486Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00433366-I1Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/03/2026M00489481-I1Open ↗
09/03/2026M00582686-I1Open ↗
08/31/2026M08046015-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
11/17/2020140978486Open ↗
07/30/2018140787352Open ↗
10/02/2017123184543Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
10/22/2019140787352Open ↗
05/29/2019121238302Open ↗
12/24/2018123184543Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
10/22/2019140787352Open ↗
05/29/2019121238302Open ↗
12/24/2018123184543Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/17/2020140978486Open ↗
07/30/2018140787352Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/17/2020140978486Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/27/2024140978486Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/27/2024140978486Open ↗
▸BISLIGHTING CONTROLS1
06/27/2024140978486Open ↗
▸BISINTERIOR LIGHTING POWER1
06/27/2024140978486Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01010460-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00489481-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/17/2020140978486Open ↗
08/24/2018140787352Open ↗
07/30/2018140787352Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
12/17/2018122478522Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/27/2024140978486Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
07/01/2024140978486Open ↗
10/22/2019140787352Open ↗
05/29/2019121238302Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
01/31/2019121238302Open ↗
08/28/2018140787352Open ↗
08/28/2018140787352Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL1
06/27/2024140978486Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT35
11/17/2020140978486Open ↗
10/22/2019140787352Open ↗
05/29/2019121238302Open ↗
Showing 3 of 35 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/27/2024140978486Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET12
10/02/2017123184543Open ↗
06/29/2017123294014Open ↗
06/22/2017121238302Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM10
09/29/2021140978486Open ↗
01/22/2021140978486Open ↗
10/22/2019140787352Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION9
08/24/2018140787352Open ↗
08/24/2018140787352Open ↗
08/24/2018121238302Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
11/17/2020140978486Open ↗
07/30/2018140787352Open ↗
Showing 2 of 5 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/11/2017123294014Open ↗
Showing 1 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
07/21/2017123294014Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWIRA Certification2
08/15/2026M01187556-I1Open ↗
08/13/2026M01187556-P1Open ↗
▸BISSupporting Document: Fee Deferment1
10/25/2016122846313Open ↗
▸DOB NOWCalculations1
08/13/2026M01370106-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01370106-I1Open ↗