← Back
BuildNYC
City university
2800 M VICTORY BOULEVARD
STATEN ISLAND · BIN 5107292
💬 Discuss this project
1993Year Built
2Stories
W5Building Class
R3-2Zoning
—Gross Floor Area
20Units
3 Active Violations 0 unresolved · 3 paperwork only 4 likely answered 2 old, status unconfirmed ▸FDNY Report ↗
City university · Owner of record: Dormitory Authority of the State of New York · 0.07 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Concrete, brick, and stair repairs with fan replacement1 filing · 3 docs
Floor 1CUNY College of Staten Island2 filings · 9 docs
CellarConcrete, brick, and stair repairs with fan replacement1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dasny403/21/2026
CUNY310/04/2026
Dormitory Authority of the State of New York203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Welsbach ElectricElectrical103/21/2026
Building Lifecycle
All (24)Filed (3)Violation (10)Objection (2)Special Inspection (9)
10/19/2026
Objection resolved — Resolved
10/15/2026
Objection raised — Scope
09/23/2026
Filed — Alteration
REPAIRS TO MISCELLANEOUS CONCRETE, BRICK WALLS, METAL STAIR SUPPORTS, SEALANTS, GLASS PANES, GYPSUM BOARD. REPLACEMENT OF STAIR EXHAUST FANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01448987-I1
08/20/2026
Special inspection requirement — Mechanical Systems
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/20/2026
Special inspection requirement — Final
Christopher Krepcio
04/01/2026
Filed — Alteration
Regrading of existing parking lot.
S01369798-S1
03/31/2026
Filed — Alteration
Regrading of existing parking lot.
S01369798-I1
03/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/23/2026
Special inspection requirement — Final
03/10/2026
Special inspection requirement — Concrete - Cast-In-Place
03/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/10/2026
Special inspection requirement — Post-installed Anchors
03/10/2026
Special inspection requirement — Final
Paul Millman
12/28/2023
Violation issued (FDNY_NOV, closed)
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2016
Violation issued (ECB, open)
Boilers
08/19/2016
Violation issued (ECB, open)
Boilers
08/19/2016
Violation issued (ECB, open)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDTredent Contracting Services12/23/2021
BISOTISSUEDJrcruz05/22/2017
BISOTISSUEDJrcruz04/24/2017
BISPLISSUEDWest Shore Contracting, I03/27/2017
BISSDISSUEDLafata-Corallo01/12/1995
BISSPISSUEDLafata-Corallo11/30/1994
1 project · most recent 09/23/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2026——Ventilation Systems
Ventilation
Greenheck SE1-12-432-A4X-QD Exhaust Fan ×2
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/20/2026Mechanical Systems—special
08/20/2026Fire-Resistant Penetrations and Joints—special
08/20/2026FinalChristopher Krepcioprogress
03/23/2026Subsurface Conditions – Fill Placement & In-Place Density—special
03/23/2026Final—progress
03/10/2026Concrete - Cast-In-Place—special
03/10/2026Excavations - Sheeting, Shoring, and Bracing—special
03/10/2026Post-installed Anchors—special
03/10/2026FinalPaul Millmanprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CUNY College of Staten IslandEducationFloor 1
Project S01369798 Alteration · Approved · 03/31/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
10/04/2026S01448987-I1Request digital key ↗
08/17/2026S01369798-I1Request digital key ↗
08/17/2026S01369798-S1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
06/16/2022520451430Open ↗
06/22/2021520451430Open ↗
03/16/2020520451430Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
12/23/2021520451430Open ↗
06/19/2017520269227Open ↗
05/05/2017520269227Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/16/2020520451430Open ↗
03/27/2017520269227Open ↗
03/03/2016520269227Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
10/04/2026S01448987-I1Open ↗
08/17/2026S01369798-S1Open ↗
08/17/2026S01369798-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
10/04/2026S01448987-I1Open ↗
08/29/2026S01369798-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/03/2016520269227Open ↗
▸Safety & Tenant Protection1
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
11/23/2021520269227Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/28/2016520269227Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/21/2021520451430Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01369798-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/16/2020520451430Open ↗
03/03/2016520269227Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/07/2021520451430Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/05/2022520269227Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/11/2022520451430Open ↗
06/16/2022520451430Open ↗
06/23/2021520451430Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/06/2022520451430Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
10/04/2026S01448987-I1Open ↗
08/13/2026S01369798-I1Open ↗
08/13/2026S01369798-S1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/19/2017520269227Open ↗
05/19/2017520269227Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/18/2024520451430Open ↗
04/05/2022520269227Open ↗
▸BISFINAL2
09/17/2024520451430Open ↗
10/06/2021520269227Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/16/2020520451430Open ↗
03/03/2016520269227Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
02/22/2017520269227Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT3
03/16/2020520451430Open ↗
02/22/2017520269227Open ↗
03/03/2016520269227Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
09/18/2024520451430Open ↗
10/06/2021520269227Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/11/2017520269227Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
07/21/2022520451430Open ↗
12/03/2021520451430Open ↗
06/28/2021520451430Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
03/16/2020520451430Open ↗
03/03/2016520269227Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/11/2017520269227Open ↗
03/03/2016520269227Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
11/23/2021520269227Open ↗
▸BISPROOF OF FEE EXEMPTION1
03/16/2020520451430Open ↗