← Back
Public elementary, junior or senior high
Abraham Lincoln High School
2800 OCEAN PARKWAY · BIN 3196293
💬 Discuss this project
1931Year Built
3Stories
W1Building Class
R6Zoning
305,046 sfGross Floor Area
1Units
LL97 Covered16 Open Violations 1 unresolved · 15 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 381,555 sf lot · 0.8 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
Basement13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3509/09/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION1803/22/2026
D.O.E. P.S.410 0403/22/2026
DEPT OF EDUCATION P.S.K41103/22/2026
DOE ABRAHAM LINCOLN H040703/22/2026
DOE LINCOLN H.S. 0103/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
BD OF ED 040603/22/2026
BD OF EDUCATION K411 040203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV1803/21/2026
AK CONSULTING SERVICES403/21/2026
PRECISION 3SIXTY NYC, INC1003/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BESPOKE DEVELOPERS INCGeneral Contractor1509/09/2026
BHARAT MECHANICAL CORPGeneral Contractor607/08/2026
FRANCIS RICHARDSElectrical403/21/2026
NIEVES WILLIAMElectrical203/21/2026
WILLIAM NIEVESElectrical203/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
A & S ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317907/28/2026
HOMERUN SOLAR8772111/22/2024
Building Lifecycle
All (147)Filed (20)Permit Issued (15)Signed Off (5)Violation (60)Inspection (1)Objection (16)Special Inspection (30)
09/08/2026
Permit issued — General Construction
B00971500-I1-GC
09/01/2026
Objection resolved — Addressed
08/18/2026
Permit issued — Structural
B00971500-I1-GC
08/03/2026
Objection raised — Other
07/28/2026
Filed — Alteration
K410_Upgrade and reconstruct the pools, natatorium and adjacent restrooms, shower and locker rooms, offices, and storage rooms. Remove existing and provide new HVAC equipment serving pools.
B01006616-P4
07/23/2026
Special inspection requirement — Subgrade Inspections
07/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Structural Steel - Details
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Masonry
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Final
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Structural Steel - Welding
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
06/29/2026
Objection resolved — Addressed
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/16/2026
Filed — Alteration
FN/Lincoln HS - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO JOB B01006616-I1. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01241628-I1
06/16/2026
Filed — Alteration
SH/Lincoln HS - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO JOB B01006616-I1. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01241631-I1
04/10/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR ABRAHAM LINCOLN HS 411K AT 2800 OCEAN PARKWAY, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01191766-I1
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Violation issued (FDNY_ORDER, closed)
12/23/2025
Violation issued (ECB, closed)
Elevators
12/22/2025
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
12/22/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
12/22/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
12/22/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
12/17/2025
Permit issued — General Construction
B00971500-I1-ST
12/17/2025
Permit issued — Structural
B00971500-I1-GC
12/15/2025
Filed — Alteration
K411_Remove existing bleachers and provide ADA compliant bleachers at existing tennis courts area and at existing pathway between tennis courts and softball field. Remove existing exterior stair and provide ADA compliant ramp and stair.
B00971500-P2
12/15/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBESPOKE DEVELOPERS INC09/08/2026
DOB NOWStructuralPermit IssuedBESPOKE DEVELOPERS INC08/18/2026
DOB NOWGeneral ConstructionPermit IssuedBESPOKE DEVELOPERS12/17/2025
DOB NOWStructuralPermit IssuedBESPOKE DEVELOPERS12/17/2025
DOB NOWStructuralPermit IssuedBESPOKE DEVELOPERS08/27/2025
DOB NOWGeneral ConstructionPermit IssuedBESPOKE DEVELOPERS08/27/2025
DOB NOWStructuralPermit IssuedBESPOKE DEVELOPERS06/26/2025
DOB NOWGeneral ConstructionPermit IssuedBESPOKE DEVELOPERS06/26/2025
DOB NOWGeneral ConstructionPermit IssuedBESPOKE DEVELOPERS04/30/2025
DOB NOWStructuralPermit IssuedBESPOKE DEVELOPERS04/30/2025
DOB NOWConstruction FenceSigned-offBESPOKE DEVELOPERS04/17/2025
DOB NOWGeneral ConstructionSigned-offBHARAT MECHANICAL07/29/2024
DOB NOWGeneral ConstructionSigned-offBHARAT MECHANICAL06/20/2024
DOB NOWGeneral ConstructionSigned-offBHARAT MECHANICAL04/05/2024
DOB NOWConstruction FenceSigned-offBHARAT MECHANICAL04/04/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/28/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/25/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/31/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/31/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/24/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/24/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/10/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/10/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/26/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/26/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/09/2022
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/09/2022
BISOTISSUEDPADILLA CONSTRUCTION SERVICES03/29/2022
BISOTISSUEDPADILLA CONSTRUCTION SERVICES03/28/2022
BISOTISSUEDPADILLA CONSTRUCTION SERVICES03/28/2022
BISOTISSUEDPADILLA CONSTRUCTION SERVICES03/28/2022
BISOTISSUEDPADILLA CONSTRUCTION SERVICES03/28/2022
BISOTISSUEDPADILLA CONSTRUCTION SERVICES03/28/2022
BISEQISSUEDKEL-TECH CONSTRUCTION INC04/06/2021
BISOTISSUEDPADILLA CONSTRUCTION SERVICES04/01/2021
BISOTISSUEDPADILLA CONSTRUCTION SERVICES04/01/2021
BISOTISSUEDPADILLA CONSTRUCTION SERVICES04/01/2021
BISOTISSUEDPADILLA CONSTRUCTION SERVICES04/01/2021
BISOTISSUEDPADILLA CONSTRUCTION SERVICES04/01/2021
BISOTISSUEDPADILLA CONSTRUCTION SERVICES04/01/2021
+ 25 more permits on file
1 project · most recent 07/28/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin FBQ24TPVJU 21,281 BTU · Vrf Indoor ×3
RZQ24TAVJU 24,000 BTU · Condensing Unit ×3
Heating
Vulcan HV-60 900 CFM · Unit Heater ×12
Ventilation
Greenheck BSQ-300 11,000 CFM · Exhaust Fan ×6
USF-30 8,500 CFM · Exhaust Fan ×6
CUBE-300XP-VGD-30 3,000 CFM · Exhaust Fan ×3
SQ-16-VG-200 4,700 CFM · Exhaust Fan ×3
Trane CSAA010 5,000 CFM ×3
CSAA017 9,500 CFM · Chiller ×3
CSAA021 11,000 CFM · Chiller ×3
Dectron LD-122-GT-X-P6FT2852W2C3AF0H 24 tons ×3
__Junk__ LD-122-GT-X-P6FT2852W2C3AF0H 24 tons ×3
1 project · most recent 07/28/2026
FiledStatusContractorScope
07/28/2026———
1 project · most recent 07/28/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/28/2026——Storm, Water/Sanitary
21 projects · most recent 03/23/2026
General Wiring Lighting
FiledStatusContractorScope
03/23/2026CompleteEVEREST ELECTRIC CORP—
10/10/2025Permit IssuedTESTA ELECTRIC CO., INCLighting
03/24/2025CompleteSUNRISE ELEC'L SERVICESGeneral Wiring
05/29/2024CompleteMNBC ELECTRICAL CORPGeneral Wiring
10/06/2023Permit IssuedA & S ELECTRIC INC.General Wiring
09/29/2023Permit IssuedA & S ELECTRIC INC.General Wiring
09/29/2023Permit IssuedA & S ELECTRIC INC.General Wiring
09/29/2023Permit IssuedA & S ELECTRIC INC.General Wiring
08/16/2022CompleteCHARAN ELEC'L ENTERP'S IN—
03/04/2022CompleteABM ELECTRIC, INCGeneral Wiring
10/05/2021CompleteSTANCO SYSTEM ELEC'L CONT—
04/28/2021CompleteK.A.B. ELECTRIC CORPGeneral Wiring
04/27/2021CompleteK.A.B. ELECTRIC CORPGeneral Wiring
01/28/2020Permit IssuedA & S ELECTRIC INC.General Wiring
01/10/2020Permit IssuedA & S ELECTRIC INC.General Wiring
2 projects · most recent 07/28/2026
Concrete Steel
FiledStatusContractorScope
07/28/2026——Steel, Concrete
12/15/2025Permit IssuedBESPOKE DEVELOPERS INCConcrete
2 projects · most recent 06/16/2026
Sidewalk Shed Fence
FiledStatusContractorScope
06/16/2026——Sidewalk Shed
06/16/2026——Fence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
07/23/2026Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
07/23/2026Fire-Resistance Rated ConstructionMAXIM KORNGOLDprogress
07/23/2026FinalMAXIM KORNGOLDprogress
07/23/2026Subgrade Inspections—special
07/23/2026Structural Steel - WeldingMAXIM KORNGOLDspecial
07/23/2026Structural Steel - High Strength BoltingMAXIM KORNGOLDspecial
07/23/2026Structural Steel - DetailsMAXIM KORNGOLDspecial
07/23/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
07/23/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
07/23/2026MasonryMAXIM KORNGOLDspecial
07/23/2026Mastic and Intumescent Fire-resistant CoatingsMAXIM KORNGOLDspecial
07/23/2026Mechanical SystemsMAXIM KORNGOLDspecial
07/23/2026Post-installed AnchorsMAXIM KORNGOLDspecial
12/22/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MIKHAIL ZEYGMANspecial
12/22/2025FinalMIKHAIL ZEYGMANprogress
12/22/2025Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
12/22/2025Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
12/15/2025FinalMIKHAIL ZEYGMANprogress
12/15/2025Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
12/15/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MIKHAIL ZEYGMANspecial
12/15/2025Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
06/04/2025Mastic and Intumescent Fire-resistant CoatingsMAXIM KORNGOLDspecial
06/04/2025Subgrade Inspections—special
06/04/2025Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
06/04/2025Post-installed AnchorsMAXIM KORNGOLDspecial
Latest 25 of 69.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/28/2026B00773647-P3Request digital key ↗
08/28/2026B00773647-P1Request digital key ↗
08/28/2026B00773647-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications56
▸DOB NOWSpecial Inspector Seal & Signature29
09/01/2026B00971500-I1Open ↗
09/01/2026B00971500-I1Open ↗
09/01/2026B00971500-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026B00773647-P2Open ↗
08/28/2026B00773647-P3Open ↗
08/28/2026B00773647-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00971500-I1Open ↗
08/27/2026B01006616-I1Open ↗
08/27/2026B01006616-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026B01191766-I1Open ↗
08/13/2026B01016033-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026B00971500-I1Open ↗
08/22/2026B00971500-P1Open ↗
08/13/2026B00971500-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026B00773647-S1Open ↗
08/14/2026B00773647-I1Open ↗
▸Approvals, Objections & Sign-offs45
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/22/2026B00971500-I1Open ↗
08/22/2026B00971500-P1Open ↗
08/15/2026B01241631-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)19
08/22/2026B00971500-I1Open ↗
08/22/2026B00971500-P1Open ↗
08/15/2026B01241631-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00773647-S1Open ↗
08/13/2026B01191766-I1Open ↗
08/13/2026B00773647-I1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B00773647-I1Open ↗
08/13/2026B00773647-S1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01083317-I1Open ↗
▸Other Documents29
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal19
08/22/2026B00971500-I1Open ↗
08/15/2026B01241631-I1Open ↗
08/14/2026B01241628-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProof of Historic Building7
08/14/2026B01006616-P4Open ↗
08/13/2026B00773647-I1Open ↗
08/13/2026B00773647-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/13/2026B00773647-I1Open ↗
08/13/2026B00773647-S1Open ↗
08/13/2026B01191766-I1Open ↗