← Back
City university
2800 VICTORY BOULEVARD
STATEN ISLAND · BIN 5107288
💬 Discuss this project
1993Year Built
2Stories
W5Building Class
R3-2Zoning
633,280 sfGross Floor Area
20Units
34 Open Violations 3 unresolved · 31 paperwork only ▸FDNY Report ↗
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 8,838,314 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY3007/08/2026
DORMITORY AUTHORITY OF THE STATE OF NEW YORK203/22/2026
DASNY 04203/22/2026
VERBE ELECTRIC CORP103/22/2026
DORMITORY AUTHORITY STATE OF NY1303/21/2026
NEW CINGULAR WIRELESS PCS, LLC203/21/2026
CUNY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMBOLL AMERICAS ENGINEERING SOLUTI101/05/2026
EME GROUP/SALAS O'BRIEN112/31/2025
RAMBOLL312/23/2025
SIEFERT ASSOCIATES109/26/2025
KMB DESIGN GROUP, LLC110/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES603/21/2026
NYCCODE603/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAJOR SYSTEMS MECHANICALGeneral Contractor1007/08/2026
RAMAPO COMMUNICATION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400501/05/2026
KMB DESIGN GROUP, LLC513110/19/2021
Building Lifecycle
All (52)Filed (7)Permit Issued (5)Signed Off (2)Violation (10)Objection (10)Special Inspection (18)
01/05/2026
Filed — Alteration
Structural work associated with the HTHW SYSTEM REHABILITATION project, work is at in the utility tunnels throughout the campus at Staten Island College. No change of use, egress or occupancy.
S01334657-S2
12/31/2025
Filed — Alteration
S01335643-I1
12/23/2025
Filed — Alteration
Structural work associated with the HTHW SYSTEM REHABILITATION project, work is at in the utility tunnels throughout the campus at Staten Island College. No change of use, egress or occupancy.
S01334657-S1
12/23/2025
Filed — Alteration
Structural work associated with the HTHW SYSTEM REHABILITATION project, work is at in the utility tunnels throughout the campus at Staten Island College. No change of use, egress or occupancy.
S01334657-I1
12/23/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
NELSON LOPEZ
12/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
12/23/2025
Special inspection requirement — Structural Steel - High Strength Bolting
NELSON LOPEZ
12/23/2025
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
12/23/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
12/23/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
12/23/2025
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
12/19/2025
Special inspection requirement — Final
Timothy Kivisto
09/26/2025
Filed — Alteration
EXCAVATION FOR UTILITY DEMO AND MS INSTALLATION IN UDG AS PER PLANS. ALL OTHER WORK HAS BEEN APPROVED/PERMITTED UNDER DOB APPLICATION # 520369039
S01253365-I1
07/09/2025
Special inspection requirement — Subgrade Inspections
07/09/2025
Special inspection requirement — Final
07/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/09/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/09/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
04/24/2024
Signed off — Alteration
REMOVAL OF EXISTING CHILLER AND ALL ASSOC. DUCTS/PIPING/WATER SUPPLY IN CENTRAL PLANT TO BE REPLACED WITH NEW AS PER PLANS IN OSP WITHIN CAMPUS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00279211-I1
02/07/2024
Signed off — Alteration
Tmobile - Relocation , replacement and installation of antennas. Installation and removal of RRUs. Removal and retrofit of cabinet in existing shelter on grade . Removal of TMA units. All work is in compliance with TPPN5/98.
S00541837-I1
04/27/2022
Violation issued (ECB, closed)
Construction
01/25/2022
Permit issued — Antenna
S00541837-I1-AN
10/20/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
10/20/2021
Objection resolved — Addressed
10/20/2021
Objection raised — 2014-AN AC 28-103.14.1-Adminis
10/20/2021
Objection resolved — Addressed
10/19/2021
Filed — Alteration
Tmobile - Relocation , replacement and installation of antennas. Installation and removal of RRUs. Removal and retrofit of cabinet in existing shelter on grade . Removal of TMA units. All work is in compliance with TPPN5/98.
S00541837-I1
06/17/2021
Violation issued (ECB, open)
Boilers
06/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2021
Permit issued — Mechanical Systems
S00279211-I1-MS
04/28/2021
Permit issued — Mechanical Systems
S00279211-I1-MS
11/20/2020
Permit issued — Mechanical Systems
S00279211-I1-MS
11/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/25/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2020
Violation issued (ECB, closed)
Construction
04/14/2020
Violation issued (ECB, closed)
Cranes and Derricks
04/08/2020
Violation issued (ECB, open)
Boilers
02/06/2020
Permit issued — Mechanical Systems
S00279211-I1-MS
01/23/2020
Objection raised — Other
01/23/2020
Objection resolved — Addressed
01/21/2020
Objection raised — Other
01/21/2020
Objection resolved — Addressed
01/17/2020
Objection raised — Other
01/17/2020
Objection resolved — Addressed
01/10/2020
Filed — Alteration
REMOVAL OF EXISTING CHILLER AND ALL ASSOC. DUCTS/PIPING/WATER SUPPLY IN CENTRAL PLANT TO BE REPLACED WITH NEW AS PER PLANS IN OSP WITHIN CAMPUS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00279211-I1
12/10/2019
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
12/10/2019
Special inspection requirement — HVAC insulation and sealing
NELSON LOPEZ
12/10/2019
Special inspection requirement — Maintenance information
NELSON LOPEZ
12/10/2019
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
12/10/2019
Special inspection requirement — Final
Steve Grgas
06/20/2017
Violation issued (ECB, closed)
Local Law
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP01/25/2022
DOB NOWMechanical SystemsSigned-offMAJOR SYSTEMS MECHANICAL05/12/2021
DOB NOWMechanical SystemsSigned-offMAJOR SYSTEMS MECHANICAL04/28/2021
DOB NOWMechanical SystemsSigned-offMAJOR SYSTEMS MECHANICAL11/20/2020
DOB NOWMechanical SystemsSigned-offMAJOR SYSTEMS MECHANICAL02/06/2020
BISOTISSUEDVERDE ELECTRIC CORP11/04/2025
BISOTISSUEDVERDE ELECTRIC CORP06/24/2025
BISOTISSUEDVERDE ELECTRIC CORP04/22/2024
BISOTISSUEDJRCRUZ CORP03/26/2024
BISOTISSUEDJRCRUZ CORP03/01/2024
BISOTISSUEDJRCRUZ CORP06/28/2023
BISOTISSUEDVERDE ELECTRIC CORP05/01/2023
BISOTISSUEDJRCRUZ CORP03/24/2023
BISOTISSUEDVERDE ELECTRIC CORP04/27/2022
BISOTISSUEDVERDE ELECTRIC CORP09/01/2020
BISOTISSUEDGA INDUSTRIES INC08/31/2020
BISOTISSUEDARISTA CONTRACTING INC06/01/2020
BISPLISSUEDAMC PLBG, HTG & CLNG, INC02/24/2020
BISOTISSUEDVERDE ELECTRIC CORP01/17/2020
BISMHISSUEDPRIORE CONSTRUCTION SVCS01/02/2019
BISFSISSUEDNICHOLAS A. CANTATORE03/14/2018
BISMHISSUEDISLAND PUMP AND TANK, LLC11/16/2017
BISOTISSUEDISLAND PUMP AND TANK, LLC11/16/2017
BISEQISSUEDISLAND PUMP AND TANK, LLC11/16/2017
BISOTISSUEDISLAND PUMP AND TANK, LLC11/16/2017
BISOTISSUEDNY ASPHALT, INC09/19/2017
BISPLISSUEDWEST SHORE CONTRACTING, I08/22/2017
BISOTISSUEDRAY ANGELINI, INC08/02/2017
BISOTISSUEDJEMCO ELECTRICAL CONT INC04/20/2017
BISOTISSUEDISLAND PUMP AND TANK, LLC02/03/2017
BISFSISSUEDNICHOLAS A. CANTATORE02/03/2017
BISPLISSUEDDUO PLUMBING & HTG CORP.02/03/2017
BISOTISSUEDISLAND PUMP AND TANK, LLC01/03/2017
BISMHISSUEDISLAND PUMP AND TANK, LLC01/03/2017
BISEQISSUEDISLAND PUMP AND TANK, LLC01/03/2017
BISOTISSUEDODYSSIA GLOBAL COMM. CORP11/07/2016
BISOTISSUEDODYSSIA GLOBAL COMM. CORP01/29/2016
BISOTISSUEDM & J ELECTRICAL CONTRAC05/20/2015
BISOTISSUEDM & J ELECTRICAL CONTRAC05/20/2015
BISMHISSUEDM & J ELECTRICAL CONTRAC05/20/2015
+ 9 more permits on file
1 project · most recent 01/05/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/05/2026——Ventilation Systems
Ventilation
Greenheck GRSI-36 3,800 CFM · Exhaust Fan ×6
G-240-VG 3,800 CFM · Exhaust Fan ×5
G-200HP-VG 1,400 CFM · Exhaust Fan ×2
1 project · most recent 01/05/2026
Water/Sanitary
FiledStatusContractorScope
01/05/2026——Water/Sanitary
4 projects · most recent 06/24/2020
General Wiring
FiledStatusContractorScope
06/24/2020CompleteFREEDOM ELECTL & DATA INCGeneral Wiring
04/16/2020Permit IssuedVERDE ELECTRIC CORP.General Wiring
04/16/2020Permit IssuedVERDE ELECTRIC CORP.—
09/25/2018CompleteHUNTER ELECTRIC, INC.General Wiring
2 projects · most recent 01/05/2026
Steel Concrete
FiledStatusContractorScope
01/05/2026——Steel, Concrete
09/26/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/23/2025Subsurface Conditions – Fill Placement & In-Place DensityNELSON LOPEZspecial
12/23/2025Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
12/23/2025Structural Steel - High Strength BoltingNELSON LOPEZspecial
12/23/2025Structural Steel - DetailsNELSON LOPEZspecial
12/23/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
12/23/2025Post-installed AnchorsNELSON LOPEZspecial
12/23/2025Structural Steel - WeldingNELSON LOPEZspecial
12/19/2025FinalTimothy Kivistoprogress
07/09/2025Subgrade Inspections—special
07/09/2025Final—progress
07/09/2025Subsurface Investigations (Borings/Test Pits)—special
07/09/2025Excavations - Sheeting, Shoring, and Bracing—special
07/09/2025Subsurface Conditions – Fill Placement & In-Place Density—special
12/10/2019Mechanical SystemsNELSON LOPEZspecial
12/10/2019HVAC insulation and sealing NELSON LOPEZenergy_progress
12/10/2019Maintenance informationNELSON LOPEZenergy_progress
12/10/2019Energy Code Compliance InspectionsNELSON LOPEZprogress
12/10/2019FinalSteve Grgasprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Cuny CsiEducation—
Project S00279211 Alteration · LOC Issued · 01/10/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 402 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/18/2026S01253365-I1Request digital key ↗
08/17/2026S01334657-I1Request digital key ↗
08/17/2026S01334657-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026S00279211-I1Request digital key ↗
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION49
12/19/2025520194977Open ↗
12/02/2025520194968Open ↗
11/26/2025520194968Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION32
06/25/2025520369039Open ↗
03/24/2023540175692Open ↗
09/01/2020520369039Open ↗
Showing 3 of 32 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/02/2020540175692Open ↗
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
06/01/2020520372338Open ↗
06/01/2020520372338Open ↗
03/06/2020520398132Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026S00541837-I1Open ↗
08/17/2026S01334657-S2Open ↗
08/17/2026S01334657-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026S00279211-I1Open ↗
09/02/2026S00279211-I1Open ↗
09/02/2026S00279211-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026S00279211-I1Open ↗
09/01/2026S01334657-I1Open ↗
08/25/2026S01334657-S2Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
07/02/2020540175692Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/02/2020540175692Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment11
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
07/12/2018520332729Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/04/2019520369039Open ↗
01/16/2018520280008Open ↗
08/09/2017520280008Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
07/12/2018520332729Open ↗
03/22/2018520290612Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
06/01/2020520372338Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S00279211-I1Open ↗
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
06/01/2020520372338Open ↗
03/14/2019520369039Open ↗
02/11/2019520372338Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/24/2020520372338Open ↗
07/02/2020540175692Open ↗
03/30/2020520372338Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/18/2018520305063Open ↗
08/01/2017540119450Open ↗
Showing 2 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
08/08/2025520194968Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/08/2025520194968Open ↗
▸BISFENESTRATION AREAS1
08/08/2025520194968Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/08/2025520194968Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/02/2021520372338Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/08/2025520194968Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00279211-I1Open ↗
▸Inspections & Test Reports38
▸BISTECHNICAL REPORT: RESPONSIBILITY14
04/29/2024520398132Open ↗
04/29/2024520398132Open ↗
01/13/2023520398132Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
10/15/2025540175692Open ↗
01/13/2020520369039Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/13/2020520369039Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
07/27/2020520398132Open ↗
03/14/2019520369039Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
10/14/2025540175692Open ↗
04/29/2024520398132Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
08/08/2025520194968Open ↗
11/02/2021520372338Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
08/08/2025520194968Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/29/2024520398132Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
04/29/2024520398132Open ↗
▸BISMASONRY1
11/02/2021520372338Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
10/14/2025540175692Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
10/14/2025540175692Open ↗
▸BISPOST-INSTALLED ANCHORS1
04/29/2024520398132Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
04/29/2024520398132Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
03/14/2019520369039Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
04/29/2024520398132Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/29/2024520398132Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01253365-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01253365-I1Open ↗
▸Approvals, Objections & Sign-offs51
▸BISADMINISTRATIVE OBJECTIONS15
03/06/2020520398132Open ↗
02/11/2019520372338Open ↗
01/04/2019520369039Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
10/14/2025540175692Open ↗
05/01/2024520398132Open ↗
12/02/2022520290612Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/17/2026S01334657-S1Open ↗
08/17/2026S01334657-S2Open ↗
08/17/2026S01334657-I1Open ↗
Showing 3 of 6 on file for this type
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL5
03/14/2019520369039Open ↗
12/07/2018520332729Open ↗
Showing 2 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/14/2019520369039Open ↗
Showing 1 of 4 on file for this type
▸BISFINAL4
10/14/2025540175692Open ↗
08/08/2025520194968Open ↗
04/29/2024520398132Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
06/25/2025520369039Open ↗
09/01/2020520369039Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
06/05/2018520290612Open ↗
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT34
11/23/2022520290612Open ↗
11/23/2022520290612Open ↗
11/22/2022520290612Open ↗
Showing 3 of 34 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/17/2024540175692Open ↗
04/30/2024520398132Open ↗
11/02/2021520372338Open ↗
▸Filing & Intake Forms50
▸BISEFILING COVER SHEET22
03/06/2020520398132Open ↗
02/11/2019520372338Open ↗
01/04/2019520369039Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION19
05/01/2024520398132Open ↗
01/17/2023540175692Open ↗
01/17/2023540175692Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM6
06/25/2025520369039Open ↗
09/01/2020520369039Open ↗
03/27/2020520369039Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/02/2020540175692Open ↗
Showing 1 of 3 on file for this type
▸Other Documents10
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
12/07/2022540175692Open ↗
04/11/2022540175692Open ↗
04/11/2022540175692Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/11/2022540175692Open ↗
03/22/2018520290612Open ↗
Showing 2 of 4 on file for this type
▸BISPROOF OF FEE EXEMPTION1
03/06/2020520398132Open ↗