← Back
City university
Campus Center / Cafeteria
2800 VICTORY BOULEVARD · BIN 5107291
💬 Discuss this project
1993Year Built
2Stories
W5Building Class
R3-2Zoning
633,280 sfGross Floor Area
20Units
32 Open Violations 1 unresolved · 31 paperwork only ▸FDNY Report ↗
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 8,838,314 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction45p · 2 filings · 20 docs
Floor 2Under Construction24p · 4 filings · 20 docs
Floor 1Under Construction54p · 4 filings · 20 docs
CellarUnder Construction52p · 3 filings · 20 docs
Basement1p · 1 filing
2 jobs · most recent 08/13/2026
Ventilation Systems
FiledStatusContractorScope
08/13/2026Permit IssuedR.A.M.S. MECHANICAL INCVentilation Systems
08/06/2025——Ventilation Systems
3 jobs · most recent 08/13/2026
Sprinkler System
FiledStatusContractorScope
08/13/2026——Sprinkler System
02/25/2026——25 heads
08/06/2025——Sprinkler System
3 jobs · most recent 08/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/13/2026Permit IssuedPAR PLUMBING CO., INCGas, Water/Sanitary
02/25/2026——Water/Sanitary
08/06/2025———
1 job · most recent 08/13/2026
Steel Concrete
FiledStatusContractorScope
08/13/2026Permit IssuedR.A.M.S. MECHANICAL INCSteel, Concrete
Building Lifecycle
All (119)Filed (21)Permit Issued (5)Signed Off (1)Violation (2)Objection (60)Special Inspection (30)
09/15/2026
Permit issued — Mechanical Systems
S01286455-S2-MS
09/10/2026
Permit issued — Plumbing
S01286455-S3-PL
09/10/2026
Permit issued — General Construction
S01286455-I1-GC
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
08/13/2026
Filed — Alteration
STRUCTURAL FILING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S01286455-P2
08/13/2026
Filed — Alteration
STRUCTURAL FILING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S01286455-P3
08/13/2026
Filed — Alteration
STRUCTURAL FILING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S01286455-P1
08/13/2026
Filed — Alteration
STRUCTURAL FILING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S01286455-P4
08/13/2026
Filed — Alteration
STRUCTURAL FILING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S01286455-P5
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
08/12/2026
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
08/12/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
05/20/2026
Filed — Alteration
UPGRADES TO EXISTING HVAC AND VFD UNITS IN BLDG. 1C AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01371150-I1
03/17/2026
Special inspection requirement — Mechanical Systems
03/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/17/2026
Special inspection requirement — Final
03/17/2026
Special inspection requirement — Shutoff dampers
03/17/2026
Special inspection requirement — Maintenance information
03/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
03/12/2026
Special inspection requirement — Maintenance information
03/12/2026
Special inspection requirement — Post-installed Anchors
03/12/2026
Special inspection requirement — Mechanical Systems
03/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/12/2026
Special inspection requirement — Final
03/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/25/2026
Filed — Alteration
Plumbing and sprinkler modifications including removal and installation of new fixtures, piping and heads on floors cellar, 1 and 2 to accommodate bathroom renovations throughout the existing school building as per plans filed herewith.
S01294518-P1
02/19/2026
Special inspection requirement — Final
02/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/19/2026
Special inspection requirement — Maintenance information
02/19/2026
Special inspection requirement — Shutoff dampers
02/19/2026
Special inspection requirement — Mechanical Systems
02/02/2026
Objection resolved — Addressed
02/02/2026
Objection resolved — Addressed
02/02/2026
Special inspection requirement — Post-installed Anchors
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Plumbing
12/02/2025
Objection raised — Admin
11/30/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/20/2025
Filed — Alteration
Plumbing and sprinkler modifications including removal and installation of new fixtures, piping and heads on floors cellar, 1 and 2 to accommodate bathroom renovations throughout the existing school building as per plans filed herewith.
S01294518-S1
11/17/2025
Objection raised — Plumbing
11/17/2025
Objection raised — Plumbing
11/17/2025
Objection raised — Plumbing
11/03/2025
Filed — Alteration
Plumbing and sprinkler modifications including removal and installation of new fixtures, piping and heads on floors cellar, 1 and 2 to accommodate bathroom renovations throughout the existing school building as per plans filed herewith.
S01294518-S3
11/03/2025
Special inspection requirement — Structural Steel - High Strength Bolting
11/01/2025
Filed — Alteration
Plumbing and sprinkler modifications including removal and installation of new fixtures, piping and heads on floors cellar, 1 and 2 to accommodate bathroom renovations throughout the existing school building as per plans filed herewith.
S01294518-S2
10/31/2025
Filed — Alteration
Plumbing and sprinkler modifications including removal and installation of new fixtures, piping and heads on floors cellar, 1 and 2 to accommodate bathroom renovations throughout the existing school building as per plans filed herewith.
S01294518-I1
10/31/2025
Special inspection requirement — Lighting controls
10/31/2025
Special inspection requirement — Interior lighting power
10/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/23/2025
Objection resolved — Addressed
Latest 60 of 119 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY1909/16/2026
DORMITORY AUTHORITY STATE OF NEW1103/21/2026
CSI DORMITORY AUTHORITY103/21/2026
CUNY503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING1003/21/2026
OUTSOURCE CONSULTANTS, INC.803/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIERRA MECHANICAL CONTRACTINGGeneral Contractor307/08/2026
GRYPHON CONSTRUCTION INCGeneral Contractor109/12/2026
R.A.M.S. MECHANICAL INCGeneral Contractor109/16/2026
PAR PLUMBING CO., INCPlumbing109/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001208/13/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. MECHANICAL INC09/15/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedGRYPHON CONSTRUCTION INC09/10/2026
DOB NOWMechanical SystemsSigned-offSIERRA MECHANICAL CONTRAC11/24/2020
DOB NOWMechanical SystemsSigned-offSIERRA MECHANICAL CONTRAC09/23/2020
BISOTISSUEDPOSYLIO GC CORPORATION08/27/2015
BISEQISSUEDPOSYLIO GC CORPORATION07/21/2015
BISEQISSUEDPOSYLIO GC CORPORATION07/13/2015
BISEQISSUEDPOSYLIO GC CORPORATION07/13/2015
BISOTISSUEDC&M DOOR CONTROLS INC11/07/2011
BISOTISSUEDC&M DOOR CONTROLS INC10/21/2011
BISOTISSUEDMAMMOTH INC01/12/2010
BISOTISSUEDTDX CONSTRUCTION CORP.11/20/1997
BISSPISSUEDPETRI MECHANICAL CO; INC.02/12/1997
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
09/02/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
08/12/2026Post-installed AnchorsNELSON LOPEZspecial
08/12/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
08/12/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
08/12/2026Sprinkler SystemsNELSON LOPEZspecial
03/17/2026Maintenance information—energy_progress
03/17/2026Final—progress
03/17/2026HVAC-R and service water heating system controls—energy_progress
03/17/2026Shutoff dampers—energy_progress
03/17/2026Mechanical Systems—special
03/12/2026Energy Code Compliance Inspections—progress
03/12/2026Post-installed Anchors—special
03/12/2026Fire-Resistant Penetrations and Joints—special
03/12/2026HVAC-R and service water piping design and insulation—energy_progress
03/12/2026Duct leakage testing, insulation and design—energy_progress
03/12/2026HVAC-R and service water heating equipment—energy_progress
03/12/2026Maintenance information—energy_progress
03/12/2026HVAC-R and service water heating system controls—energy_progress
03/12/2026Final—progress
03/12/2026Mechanical Systems—special
02/19/2026Shutoff dampers—energy_progress
02/19/2026Mechanical Systems—special
02/19/2026Final—progress
02/19/2026Maintenance information—energy_progress
02/19/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 64.
▾Documents — 225 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
08/19/2026S01185775-I1Request digital key ↗
08/19/2026S01185775-S5Request digital key ↗
08/19/2026S01185775-S4Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00373871-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION24
06/12/2025520029371Open ↗
05/12/2025520029371Open ↗
02/26/2025540063937Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION8
09/01/2015540054616Open ↗
07/22/2015520245672Open ↗
07/14/2015520245388Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
01/29/2026520016401Open ↗
12/01/2022520290649Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01185775-I1Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/18/2026S01085573-I1Open ↗
08/18/2026S01286455-P5Open ↗
08/18/2026S01286455-P4Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/27/2018540054616Open ↗
06/08/2018540054616Open ↗
06/08/2018540054616Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
07/22/2015520245672Open ↗
07/13/2015520245388Open ↗
07/13/2015520245397Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/28/2026S01286455-P5Open ↗
09/28/2026S01286455-S3Open ↗
08/27/2026S01286455-P4Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/22/2015520245672Open ↗
07/13/2015520245388Open ↗
07/13/2015520245397Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
12/12/2014540063937Open ↗
09/30/2014540054616Open ↗
08/27/2014540054616Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S00373871-I1Open ↗
08/23/2026S00373871-I1Open ↗
08/23/2026S00373871-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/22/2011520072224Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
09/09/2015540063937Open ↗
07/24/2015540063937Open ↗
12/12/2014540063937Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/02/2020520290649Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01185775-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/18/2026S01286455-P5Open ↗
08/18/2026S01286455-P4Open ↗
08/18/2026S01286455-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/22/2018520290649Open ↗
08/11/2015540063937Open ↗
08/11/2015540054616Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/22/2011520072224Open ↗
02/24/2010520029371Open ↗
10/05/2009520016401Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/24/2011520072224Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/17/2018540054616Open ↗
07/29/2015540054616Open ↗
07/28/2015540063937Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/08/2018540054616Open ↗
06/08/2018540054616Open ↗
06/08/2018540054616Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/08/2018540054616Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/14/2018540054616Open ↗
08/11/2015540054616Open ↗
08/05/2015540063937Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/18/2026S01286455-P4Open ↗
08/18/2026S01286455-P2Open ↗
08/18/2026S01286455-P1Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
07/22/2015520245672Open ↗
07/13/2015520245388Open ↗
07/13/2015520245397Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
03/12/2025520245397Open ↗
03/12/2025520245388Open ↗
12/01/2022520290649Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL2
03/11/2025520245397Open ↗
03/11/2025520245388Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT17
11/23/2022520290649Open ↗
11/23/2022520290649Open ↗
11/22/2022520290649Open ↗
Showing 3 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/06/2025520016401Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION10
08/17/2018540054616Open ↗
07/19/2018540054616Open ↗
06/08/2018540054616Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET7
03/22/2018520290649Open ↗
07/22/2015520245672Open ↗
07/13/2015520245388Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
08/27/2018540054616Open ↗
06/08/2018540054616Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/12/2014540063937Open ↗
08/27/2014540054616Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/22/2018520290649Open ↗
07/13/2015520245388Open ↗
07/13/2015520245397Open ↗
▸BISSupporting Document: Fee Exempt1
07/22/2015520245672Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01185775-I1Open ↗