← Back
City university
2800 VICTORY BOULEVARD
STATEN ISLAND · BIN 5153979
💬 Discuss this project
1993Year Built
2Stories
W5Building Class
R3-2Zoning
—Gross Floor Area
20Units
2 Open Violations ▸FDNY Report ↗
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 0.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 17 docs
Floor 1Under Construction7p · 1 filing · 10 docs
CellarUnder Construction7p · 2 filings · 15 docs
Basement5p · 1 filing · 17 docs
2 jobs · most recent 07/31/2024
FiledStatusContractorScope
07/31/2024Permit IssuedSIRINA FIRE PROT CORP—
07/19/2021Permit IssuedSIRINA FIRE PROT CORP1 outlets
1 job · most recent 04/02/2026
Storm
FiledStatusContractorScope
04/02/2026——Storm
1 job · most recent 04/29/2021
General Wiring
FiledStatusContractorScope
04/29/2021Permit IssuedRNW ELECTRIC CORPGeneral Wiring
1 job · most recent 04/02/2026
Concrete
FiledStatusContractorScope
04/02/2026——Concrete
Building Lifecycle
All (57)Filed (8)Permit Issued (7)Violation (3)Inspection (10)Objection (16)Special Inspection (13)
09/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2026
Objection raised — Other
06/01/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Other
05/29/2026
Objection resolved — Addressed
05/26/2026
Filed — No Work
S01399068-I1
04/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/02/2026
Filed — Alteration
College of Staten Island, Bldg 2M, Flood Mitigation related improvements: Installing flood gate in front of two entrances.
S01369932-S1
04/01/2026
Filed — Alteration
College of Staten Island, Bldg 2M, Flood Mitigation related improvements: Installing flood gate in front of two entrances.
S01369932-S2
03/31/2026
Filed — Alteration
College of Staten Island, Bldg 2M, Flood Mitigation related improvements: Installing flood gate in front of two entrances.
S01369932-I1
03/31/2026
Filed — Alteration
College of Staten Island, Bldg 2M, Flood Mitigation related improvements: Installing flood gate in front of two entrances.
S01369932-S3
03/31/2026
Special inspection requirement — Post-installed Anchors
03/23/2026
Special inspection requirement — Final
03/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/11/2026
Permit issued — Sprinklers
S00197351-I1-EW-SP
03/10/2026
Special inspection requirement — Concrete - Cast-In-Place
03/10/2026
Special inspection requirement — Post-installed Anchors
03/10/2026
Special inspection requirement — Final
Paul Millman
03/10/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/10/2026
Special inspection requirement — Final
Paul Millman
03/18/2025
Permit issued — Sprinklers
S00197351-I1-EW-SP
12/10/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
11/27/2024
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
11/26/2024
Objection resolved — Addressed
08/09/2024
Objection raised — Scope
07/31/2024
Filed — Alteration
HEREWITH FILING SPRINKLER WORK IN CELLAR & 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00197351-P1
03/16/2024
Permit issued — Sprinklers
S00197351-I1-EW-SP
03/16/2024
Permit issued — Standpipe
S00544550-I1-EW-SD
03/13/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/17/2022
Permit issued — Sprinklers
S00197351-I1-EW-SP
05/06/2022
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
05/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
02/16/2022
Permit issued — Standpipe
S00544550-I1-EW-SD
08/05/2021
Objection raised — Scope
08/05/2021
Objection resolved — Addressed
07/19/2021
Filed — Alteration
HEREWITH FILING STANDPIPE WORK IN CELLAR FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00544550-I1
06/22/2021
Special inspection requirement — Standpipe Systems
NELSON LOPEZ
06/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2021
Permit issued — Sprinklers
S00197351-I1-EW-SP
09/26/2019
Objection raised — Structural
09/26/2019
Objection resolved — Addressed
09/26/2019
Objection raised — Structural
09/26/2019
Objection resolved — Addressed
09/26/2019
Objection raised — Structural
09/26/2019
Objection resolved — Addressed
09/26/2019
Objection raised — Structural
09/26/2019
Objection resolved — Addressed
09/19/2019
Filed — Alteration
HEREWITH FILING SPRINKLER WORK IN CELLAR & 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00197351-I1
07/18/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUNY109/13/2026
DASNY2107/08/2026
DORMITORY AUTHORITY STATE OF NY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIRINA FIRE PROT CORPFire Protection707/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400107/19/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP03/11/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP03/18/2025
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP03/16/2024
DOB NOWStandpipePermit IssuedSIRINA FIRE PROT CORP03/16/2024
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP06/17/2022
DOB NOWStandpipePermit IssuedSIRINA FIRE PROT CORP02/16/2022
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP06/01/2021
BIS—ISSUEDINFINITY CONTRACTING SERV06/18/2025
BIS—ISSUEDINFINITY CONTRACTING SERV11/13/2024
BISPLISSUEDS & L PLUMBING & HEATING10/29/2024
BIS—ISSUEDINFINITY CONTRACTING SERV11/08/2023
BISPLISSUEDS & L PLUMBING & HEATING05/23/2023
BIS—ISSUEDINFINITY CONTRACTING SERV11/09/2022
BISPLISSUEDS & L PLUMBING & HEATING04/13/2022
BIS—ISSUEDINFINITY CONTRACTING SERV11/16/2021
BISPLISSUEDS & L PLUMBING & HEATING04/13/2021
BIS—ISSUEDINFINITY CONTRACTING SERV04/09/2021
BISOTISSUEDMAJOR SYSTEMS MECHANICAL07/12/2019
BISOTISSUEDJ-TRACK, LLC03/29/2019
BISOTISSUEDMAJOR SYSTEMS MECHANICAL03/14/2019
BISOTISSUEDJ-TRACK, LLC03/01/2019
BISOTISSUEDSTV CONSTRUCTION INC01/31/2019
BISPLISSUEDVARSITY PLBG AND HTG INC12/08/2017
BISSDISSUEDWELKIN FIRE PROTECTION LL12/04/2017
BISSPISSUEDWELKIN FIRE PROTECTION LL12/04/2017
BISOTISSUEDB N RESTORATION INC11/14/2017
BISOTISSUEDJ-TRACK, LLC07/10/2017
BISOTISSUEDJ-TRACK, LLC07/10/2017
BISOTISSUEDJ-TRACK, LLC07/10/2017
BISMHISSUEDJ-TRACK, LLC05/03/2017
BISSDISSUEDWELKIN FIRE PROTECTION LL12/02/2016
BISSPISSUEDWELKIN FIRE PROTECTION LL12/02/2016
BISPLISSUEDPAR PLUMBING CO., INC12/02/2016
BIS—ISSUEDJ-TRACK, LLC11/03/2016
BISOTISSUEDJ-TRACK, LLC03/24/2016
BISOTISSUEDJ-TRACK, LLC03/24/2016
BISMHISSUEDJ-TRACK, LLC03/24/2016
BISOTISSUEDJ-TRACK, LLC03/24/2016
BISOTISSUEDE-J ELECTRIC INSTALLATION01/22/2013
BISOTISSUEDE-J ELECTRIC INSTALLATION12/14/2012
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/10/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/31/2026Post-installed Anchors—special
03/23/2026Final—progress
03/23/2026Subsurface Conditions – Fill Placement & In-Place Density—special
03/10/2026Concrete - Cast-In-Place—special
03/10/2026Post-installed Anchors—special
03/10/2026FinalPaul Millmanprogress
03/10/2026Subsurface Conditions – Fill Placement & In-Place Density—special
03/10/2026FinalPaul Millmanprogress
11/27/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
11/27/2024Sprinkler SystemsNELSON LOPEZspecial
05/06/2022Sprinkler SystemsNELSON LOPEZspecial
05/06/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/22/2021Standpipe SystemsNELSON LOPEZspecial
▾Documents — 331 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/17/2026S01369932-I1Request digital key ↗
08/17/2026S01369932-S2Request digital key ↗
08/17/2026S01369932-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/21/2026S00197351-I1Request digital key ↗
08/21/2026S00197351-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026S01399068-I1Request digital key ↗
▸Applications & Permits63
▸BISPLAN / WORK APPROVAL APPLICATION34
03/13/2019520375353Open ↗
02/05/2019520371605Open ↗
02/05/2019520371605Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION26
04/13/2021520371605Open ↗
04/09/2021520371605Open ↗
07/15/2019520375353Open ↗
Showing 3 of 26 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/22/2017520296778Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
04/09/2021520371605Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
04/06/2021520371605Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
03/22/2019520306810Open ↗
03/15/2019520375353Open ↗
03/13/2019520375353Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026S01369932-S1Open ↗
08/17/2026S01369932-I1Open ↗
08/17/2026S01369932-S3Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/13/2019520375353Open ↗
08/01/2017520306810Open ↗
07/07/2017520306810Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/13/2019520375353Open ↗
08/01/2017520306810Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/25/2026S00544550-I1Open ↗
08/28/2026S00197351-I1Open ↗
08/28/2026S00197351-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01369932-I1Open ↗
08/28/2026S01369932-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
02/05/2019520371605Open ↗
09/19/2017520208212Open ↗
08/01/2017520208212Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
03/25/2019520315356Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
02/15/2019520296778Open ↗
02/05/2019520371605Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/06/2021520371605Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/24/2017520306810Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
11/01/2017520306810Open ↗
▸Environmental & Asbestos10
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
03/22/2019520306810Open ↗
12/06/2017520208221Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
04/06/2021520371605Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01369932-S1Open ↗
08/17/2026S01369932-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026S00197351-I1Open ↗
08/13/2026S00544550-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/13/2019520375353Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/13/2019520375353Open ↗
03/13/2019520375353Open ↗
02/05/2019520371605Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/10/2020520375353Open ↗
10/27/2020520375353Open ↗
03/12/2018520208221Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/06/2021520371605Open ↗
04/06/2021520371605Open ↗
10/27/2020520375353Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/06/2021520371605Open ↗
04/06/2021520371605Open ↗
04/06/2021520371605Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
01/22/2019520208221Open ↗
01/17/2018520208221Open ↗
Showing 2 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
08/10/2017520208212Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPOST-INSTALLED ANCHORS1
04/06/2021520371605Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
04/05/2021520371605Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS1
04/06/2021520371605Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/09/2021520371605Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/09/2021520371605Open ↗
▸Approvals, Objections & Sign-offs49
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
11/16/2020520375353Open ↗
05/30/2019520296778Open ↗
04/12/2019520315356Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
03/13/2019520375353Open ↗
02/05/2019520371605Open ↗
08/01/2017520306810Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/05/2019520371605Open ↗
01/29/2019520296778Open ↗
04/23/2018520296778Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/15/2026S01399068-I1Open ↗
08/13/2026S01369932-S2Open ↗
08/13/2026S01369932-S3Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
02/05/2019520371605Open ↗
Showing 1 of 5 on file for this type
▸BISBSA/CPC APPROVAL1
05/30/2019520296778Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT21
11/10/2020520375353Open ↗
03/22/2019520306810Open ↗
03/13/2019520375353Open ↗
Showing 3 of 21 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
04/09/2021520371605Open ↗
04/01/2019520208221Open ↗
03/04/2019520208221Open ↗
Showing 3 of 6 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
04/01/2019520208221Open ↗
03/04/2019520208221Open ↗
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET17
03/13/2019520375353Open ↗
02/05/2019520371605Open ↗
02/05/2019520371605Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM15
05/30/2019520296778Open ↗
04/12/2019520315356Open ↗
04/02/2019520315356Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION12
04/02/2021520371605Open ↗
05/28/2019520371605Open ↗
02/15/2019520296778Open ↗
Showing 3 of 12 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
04/01/2019520208221Open ↗
04/01/2019520208221Open ↗
03/13/2019520375353Open ↗
Showing 3 of 9 on file for this type
▸BISPLOT DIAGRAM5
05/28/2019520371605Open ↗
05/28/2019520371605Open ↗
02/05/2019520371605Open ↗
Showing 3 of 5 on file for this type
▸BISPRELIMINARY1
04/02/2021520371605Open ↗
▸BISPERMANENT CERTIFICATE1
04/02/2021520371605Open ↗