← Back
BuildNYC
City university
Pump House
2800C VICTORY BOULEVARD · BIN 5130988
💬 Discuss this project
1993Year Built
2Stories
W5Building Class
R3-2Zoning
633,280 sfGross Floor Area
20Units
29 Active Violations 1 unresolved · 28 paperwork only ▸FDNY Report ↗
City university · Owner of record: Dormitory Authority of the State of New York · 8,838,314 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1CUNY College of Staten IslandUnder Construction8p · 1 filing · 19 docs
Site & exteriorCUNY College of Staten IslandUnder Construction7p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ramboll610/21/2025
O'Brien & Gere Engineers210/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fidelis ContractingGeneral Contractor404/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins400810/21/2025
Building Lifecycle
All (42)Filed (8)Permit Issued (3)Violation (1)Special Inspection (30)
03/04/2026
Permit issued — General Construction
S01173121-S3-EA
02/17/2026
Permit issued — General Construction
S01173121-S1-ST
02/17/2026
Permit issued — Structural
S01173121-S1-GC
10/21/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-P2
10/21/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-P4
10/21/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
NELSON LOPEZ
10/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NELSON LOPEZ
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
10/21/2025
Special inspection requirement — Final
Kevin Smith
10/21/2025
Special inspection requirement — Structural Steel - High Strength Bolting
NELSON LOPEZ
10/21/2025
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
10/21/2025
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
10/21/2025
Special inspection requirement — Structural Cold-Formed Steel
NELSON LOPEZ
10/21/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
10/21/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
10/21/2025
Special inspection requirement — Final
Kevin Smith
10/21/2025
Special inspection requirement — Subgrade Inspections
NELSON LOPEZ
10/20/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-P3
10/17/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-P1
10/17/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
10/17/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
10/17/2025
Special inspection requirement — Final
Kevin Smith
10/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
10/17/2025
Special inspection requirement — Duct leakage testing, insulation and design
NELSON LOPEZ
10/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
10/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
10/09/2025
Special inspection requirement — Structural Cold-Formed Steel
NELSON LOPEZ
10/09/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
10/09/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
10/09/2025
Special inspection requirement — Final
Kevin Smith
10/09/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
10/09/2025
Special inspection requirement — Final
Kevin Smith
10/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
10/09/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
10/09/2025
Special inspection requirement — Duct leakage testing, insulation and design
NELSON LOPEZ
10/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
08/21/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-S1
06/26/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-S3
06/16/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-S2
05/19/2025
Filed — Alteration
Mechanical Processing work associated with the College of Staten Island Pump House renovation. No change of use, egress or occupancy
S01173121-I1
06/08/2013
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFidelis Contracting03/04/2026
DOB NOWGeneral ConstructionPermit IssuedFidelis Contracting02/17/2026
DOB NOWStructuralPermit IssuedFidelis Contracting02/17/2026
1 project · most recent 10/21/2025
Steel Concrete
FiledStatusContractorScope
10/21/2025Permit IssuedFidelis ContractingSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
10/21/2025Subsurface Conditions – Fill Placement & In-Place DensityNELSON LOPEZspecial
10/21/2025Fenestration and door U-factor and product ratingsNELSON LOPEZenergy_progress
10/21/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
10/21/2025FinalKevin Smithprogress
10/21/2025Structural Steel - High Strength BoltingNELSON LOPEZspecial
10/21/2025Structural Steel - WeldingNELSON LOPEZspecial
10/21/2025Structural Steel - DetailsNELSON LOPEZspecial
10/21/2025Structural Cold-Formed SteelNELSON LOPEZspecial
10/21/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
10/21/2025Post-installed AnchorsNELSON LOPEZspecial
10/21/2025FinalKevin Smithprogress
10/21/2025Subgrade InspectionsNELSON LOPEZspecial
10/17/2025Maintenance informationNELSON LOPEZenergy_progress
10/17/2025Mechanical SystemsNELSON LOPEZspecial
10/17/2025FinalKevin Smithprogress
10/17/2025HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
10/17/2025Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
10/17/2025HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
10/17/2025HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
10/09/2025Structural Cold-Formed SteelNELSON LOPEZspecial
10/09/2025Post-installed AnchorsNELSON LOPEZspecial
10/09/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
10/09/2025FinalKevin Smithprogress
10/09/2025Mechanical SystemsNELSON LOPEZspecial
10/09/2025FinalKevin Smithprogress
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CUNY College of Staten IslandEducationFloor 1
Project S01173121 Alteration · Permit Entire · 05/19/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026S01173121-S2Request digital key ↗
08/18/2026S01173121-P4Request digital key ↗
08/18/2026S01173121-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026S01173121-P1Open ↗
09/02/2026S01173121-P1Open ↗
09/02/2026S01173121-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026S01173121-S1Open ↗
08/18/2026S01173121-S2Open ↗
08/18/2026S01173121-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026S01173121-P1Open ↗
09/02/2026S01173121-P4Open ↗
09/01/2026S01173121-S1Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026S01173121-S3Open ↗
08/13/2026S01173121-P3Open ↗
08/13/2026S01173121-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026S01173121-S3Open ↗
08/13/2026S01173121-S1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01173121-S3Open ↗