BuildNYC
Elevator apt, fireproof without stores
Throggs Neck (NYCHA)
2801 DEWEY AVENUE · BIN 2091478
💬 Discuss this project
1952Year Built
6Stories
D3Building Class
R4Zoning
1,172,800 sfGross Floor Area
1,020Units
LL97 Covered3 Active Violations 1 unresolved · 2 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 856,440 sf lot · 1.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade Inspection using Rope Access1p · 1 filing · 3 docs
Floor 7Roofing Replacement & Rooftop Structure Renovation1 filing · 6 docs
Floor 6Roofing Replacement & Rooftop Structure Renovation1 filing · 6 docs
Floor 5Roofing Replacement & Rooftop Structure Renovation1 filing · 6 docs
Floor 4Roofing Replacement & Rooftop Structure Renovation1 filing · 6 docs
Floor 3Roofing Replacement & Rooftop Structure Renovation1 filing · 6 docs
Floor 2Roofing Replacement & Rooftop Structure Renovation1 filing · 6 docs
Floor 1Roofing Replacement & Rooftop Structure Renovation1 filing · 6 docs
Site & exteriorNYCHA Throggs Neck Houses sidewalk shedUnder Construction15p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5808/20/2026
NYC Department of Housing Preservation and Development203/21/2026
Gensler103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Smep Design & Consultation203/21/2026
AK Consulting Services403/21/2026
Superstructures Engineering + Architects103/21/2026
Dseny Engineering Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK EnterprisesScaffold508/20/2026
Smith Electrical ContractingElectrical303/21/2026
R.A. Phillips Electrical ContElectrical203/21/2026
Peter J. CatanzaroElectrical103/21/2026
Lit Mode Electrical ContgElectrical103/21/2026
Dynamic Electric SystemElectrical103/21/2026
Adam's European ContractingScaffold107/08/2026
Star-Delta ElectricElectrical103/21/2026
C.G.S. Electrical ContractingElectrical103/21/2026
C. B. ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections1471106/04/2025
Building Lifecycle
All (76)Filed (5)Permit Issued (8)Signed Off (2)Facade (FISP) (16)Violation (32)Objection (2)Special Inspection (11)
08/18/2026
Permit issued — Sidewalk Shed
X01215222-I1-SH
05/27/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
X01166171-I1
05/26/2026
Permit issued — Suspended Scaffold
X01166171-I1-SC
05/18/2026
Permit issued — Sidewalk Shed
X01215222-I1-SH
05/08/2026
Permit issued — Construction Fence
X01215225-I1-FN
06/24/2025
Cycle 10 facade report submitted
06/24/2025
Cycle 10 facade report signed — UNSAFE
06/19/2025
Cycle 10 facade inspection completed
06/04/2025
Filed — Alteration
Throggs Neck 14, Exterior Roof repairs: Removal/replacement/repairs of existing roof membrane, cracked masonry units, parapet, roof deck, drains, bulkhead stair, platform & door, spalled concrete. Install guard rail and Masonry chimney height reduction.
X01229515-I1
05/21/2025
Special inspection requirement — Fenestration areas
JACOB HAAS
05/21/2025
Special inspection requirement — Masonry
JACOB HAAS
05/21/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
05/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
05/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
JACOB HAAS
05/21/2025
Special inspection requirement — Final
JACOB HAAS
05/21/2025
Special inspection requirement — Air barrier - visual inspection
JACOB HAAS
05/21/2025
Special inspection requirement — Fenestration air leakage
JACOB HAAS
05/21/2025
Special inspection requirement — Insulation placement and R values
JACOB HAAS
05/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JACOB HAAS
05/06/2025
Permit issued — Construction Fence
X01215225-I1-FN
05/05/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2801 DEWEY AVENUE, BRONX, NY 10465 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01215225-I1
05/05/2025
Permit issued — Sidewalk Shed
X01215222-I1-SH
05/02/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 2801 DEWEY AVENUE, BRONX, NY 10465 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01215222-I1
04/30/2025
Violation issued (ECB, closed)
Construction
01/31/2025
Permit issued — Suspended Scaffold
X01166171-I1-SC
01/27/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Admin
01/23/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
X01166171-I1
12/02/2022
Violation issued (ECB, closed)
Local Law
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/27/2021
Violation issued (ECB, closed)
Boilers
05/27/2021
Violation issued (ECB, closed)
Boilers
05/27/2021
Violation issued (ECB, closed)
Boilers
07/23/2020
Signed off — Alteration
SH/2801 Dewey Avenue -Bldg 14-NYCHA Throggs Neck Houses SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SHED) FOR EXTERIOR WORK AT BUILDING FACADES .NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00307042-I1
02/20/2020
Permit issued — Sidewalk Shed
X00307042-I1-SH
02/18/2020
Filed — Alteration
SH/2801 Dewey Avenue -Bldg 14-NYCHA Throggs Neck Houses SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SHED) FOR EXTERIOR WORK AT BUILDING FACADES .NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00307042-I1
01/30/2020
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/05/2018
Cycle 8 facade report submitted
12/23/2017
Cycle 8 facade report signed — SAFE
12/14/2017
Cycle 8 facade inspection completed
03/13/2017
Violation issued (ECB, closed)
Boilers
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2014
Cycle 7 facade report submitted
04/14/2014
Cycle 7 facade report signed — SWARMP
11/06/2013
Cycle 7 facade inspection completed
02/25/2013
Cycle 6 facade report submitted
01/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2012
Cycle 6 facade report submitted
06/25/2010
Violation issued (ECB, closed)
Local Law
12/23/2009
Violation issued (ECB, closed)
Local Law
08/12/2009
Violation issued (ECB, closed)
Boilers
08/12/2009
Violation issued (ECB, closed)
Boilers
04/21/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/10/2009
Cycle 6 facade report submitted
04/10/2009
Violation issued (ECB, closed)
Construction
04/07/2009
Cycle 6 facade report signed — UNSAFE
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises08/18/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System05/26/2026
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises05/18/2026
DOB NOWConstruction FencePermit IssuedMNK Enterprises05/08/2026
DOB NOWConstruction FencePermit IssuedMNK Enterprises05/06/2025
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises05/05/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System01/31/2025
DOB NOWSidewalk ShedSigned-offAdam's European Contracting02/20/2020
BISOTISSUEDRoma Scaffolding02/12/2018
BISEQISSUEDRoma Scaffolding10/11/2017
BISOTISSUEDRoma Scaffolding09/25/2017
BISEQISSUEDRoma Scaffolding09/14/2017
BISEQISSUEDRoma Scaffolding08/28/2017
BISMHISSUEDMaric Mechanical03/25/2017
BISPLISSUEDArista Plumbing & Heating03/16/2017
BISEQISSUEDSkyworx Contracting10/11/2016
BISEQISSUEDEagle Scaffolding Services06/27/2016
BISEQISSUEDEagle Scaffolding Services06/27/2016
BISEQISSUEDEagle Scaffolding Services06/27/2016
BISFBISSUEDDouglas Simmons04/29/2016
BISMHISSUEDMaric Mechanical03/23/2016
BISFBISSUEDDouglas Simmons03/14/2016
BISMHISSUEDMaric Mechanical01/05/2016
BISPLISSUEDArista Plumbing & Heating01/05/2016
BISEQISSUEDSkyworx Contracting10/05/2015
BISEQISSUEDSkyworx Contracting10/05/2015
BISEQISSUEDAMC United07/16/2012
BISEQISSUEDAMC United07/16/2012
BISEQISSUEDM.S.S. Construction02/27/2012
BISPLISSUEDDynamic Contracting03/28/2011
BISEQISSUEDM.S.S. Construction03/02/2011
BISEQISSUEDMetro. Bridge & Scaf09/24/2010
BISPLISSUEDDynamic Contracting10/23/2009
BISEQISSUEDMetro. Bridge & Scaf03/18/2009
BISOTRE-ISSUEDNavillus Tile01/11/2008
BISEQISSUEDNavillus Tile06/11/2007
BISOTISSUEDNavillus Tile05/07/2007
BISFBISSUEDAnthony Patane/Dierks Heating Co08/23/1996
BISPLISSUEDLoewy/Dierks Plumbing08/23/1996
BISBLISSUEDAnthony Patane/Dierks Heating Co05/15/1996
+ 4 more permits on file
1 project · most recent 04/24/2025
FiledStatusContractorScope
04/24/2025Permit IssuedLit Mode Electrical Contg—
1 project · most recent 01/23/2025
FiledStatusContractorScope
01/23/2025Signed-offStructural Preservation System—
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/21/2025Fenestration areasJACOB HAASenergy_progress
05/21/2025MasonryJACOB HAASspecial
05/21/2025Post-installed AnchorsJACOB HAASspecial
05/21/2025Structural Stability – Alterations of existing buildingsJACOB HAASspecial
05/21/2025Tenant Protection Plan ComplianceJACOB HAASspecial
05/21/2025FinalJACOB HAASprogress
05/21/2025Air barrier - visual inspectionJACOB HAASenergy_progress
05/21/2025Fenestration air leakageJACOB HAASenergy_progress
05/21/2025Insulation placement and R valuesJACOB HAASenergy_progress
05/21/2025Fenestration and door U-factor and product ratingsJACOB HAASenergy_progress
01/30/2020FinalALEXIS SCHLESSINGERMANprogress
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/20/2026X01166171-I1Request digital key ↗
08/19/2026X01215222-I1Request digital key ↗
08/19/2026X01215225-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00307042-I1Request digital key ↗
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION23
09/18/2019240262112Open ↗
02/01/2018240116628Open ↗
02/01/2018240116637Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION22
02/13/2018240194561Open ↗
10/05/2017240201107Open ↗
09/25/2017240194561Open ↗
Showing 3 of 22 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/02/2011210115365Open ↗
▸Seals & Professional Certifications79
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
05/16/2018240194561Open ↗
05/07/2018240114559Open ↗
03/05/2018240201107Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
09/18/2019240262112Open ↗
02/01/2018240116628Open ↗
02/01/2018240116637Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
02/01/2018240116628Open ↗
02/01/2018240116637Open ↗
06/27/2016220537541Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
09/18/2019240262112Open ↗
10/05/2017240201107Open ↗
09/12/2017240198059Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
09/18/2019240262112Open ↗
10/05/2017240201107Open ↗
09/12/2017240198059Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
07/12/2012220196927Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026X01215225-I1Open ↗
08/13/2026X01229515-I1Open ↗
08/13/2026X00307042-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
10/09/2026X00307042-I1Open ↗
09/01/2026X01229515-I1Open ↗
09/01/2026X01229515-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X01229515-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
12/09/2016240114559Open ↗
04/29/2016240114559Open ↗
09/22/2015240114559Open ↗
▸BISSCHEDULE B - PLUMBING2
09/22/2015240114559Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
05/05/2011220031908Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/10/2017240114559Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES5
09/18/2019240262112Open ↗
10/05/2017240201107Open ↗
09/12/2017240198059Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026X00307042-I1Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/18/2019240262112Open ↗
10/05/2017240201107Open ↗
06/21/2016220537550Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
05/16/2018240194561Open ↗
08/17/2017240194561Open ↗
01/05/2016240114559Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/18/2019240262112Open ↗
08/17/2017240194561Open ↗
08/17/2017240194561Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/16/2018240194561Open ↗
05/07/2018240114559Open ↗
10/27/2015240114559Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/18/2019240262112Open ↗
08/17/2017240194561Open ↗
09/22/2015240114559Open ↗
▸BISNYCECC ANALYSIS3
09/18/2019240262112Open ↗
08/17/2017240194561Open ↗
09/22/2015240114559Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/16/2018240194561Open ↗
05/07/2018240114559Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/12/2017240198059Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/18/2019240262112Open ↗
10/05/2017240201107Open ↗
09/12/2017240198059Open ↗
Showing 3 of 8 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
10/05/2017240201107Open ↗
09/12/2017240198059Open ↗
08/27/2017240195837Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs35
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
07/12/2018240114559Open ↗
05/16/2018240194561Open ↗
05/07/2018240114559Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/12/2018240114559Open ↗
10/21/2016240116628Open ↗
06/21/2016220537550Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026X01166171-I1Open ↗
08/13/2026X01229515-I1Open ↗
08/13/2026X00307042-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
07/12/2012220196927Open ↗
Showing 1 of 4 on file for this type
▸BISSHED LETTER2
03/02/2012220104964Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00307042-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026X00307042-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
09/18/2019240262112Open ↗
05/16/2018240194561Open ↗
05/07/2018240114559Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET8
06/21/2016220537569Open ↗
06/21/2016220537541Open ↗
06/21/2016220537550Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
09/18/2019240262112Open ↗
10/05/2017240201107Open ↗
09/12/2017240198059Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
07/12/2018240114559Open ↗
05/16/2018240194561Open ↗
03/05/2018240201107Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
02/01/2018240116628Open ↗
02/01/2018240116637Open ↗
10/26/2017240198059Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/05/2015240116628Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
09/22/2015240114559Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01166171-I1Open ↗