DOB07/30/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: OBSERVED THE FOLLOWING CONDITIONS. AT EXPOSURE 4 CRACKS, MISSING BRICKS, SPALLED/ SPALLING AND DAMED JOINTS. REMEDY: REPAIR AND/OR REPLACE
ECB10/17/2025PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. OBSERVED LEANING PARAPET PANELS/MISSING/BROKEN PANELS, INADEQUATE LIGHT COVERINGS. REMEDY: COMPLY TO CODE SPECIFICATIONS.$2K due
DOB10/17/2025FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED STEP CRACKING SPALLING BRICK/ STONE WORK, AND DAMAGED MORTAR JOINTS ON EXPOSURE 4. REMEDY:REPAIR AND OR REPLACE
DOB01/08/2025FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/24/2024FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE CONDITIONS OF PSID#X0003788 BY THE AUGUST 1,2024 DEADLINE.TO DATE,THE DEPARTMENT HAS$12K due
DOB03/08/2022ERECT AND INSTALL APPROXIMATELY 90 LINEAR FEET OF TIGHT BOARD CONSTRUC TION FENCC ALONG THE FRONT EXPOSURE (1) ON KINGSBRIDGE TERRACE AND APPROXIMATELY 125 LINEAR FEET OF TIGHT BOARD CONSTRUCTION FENCE AT THE RIGHT SIDE EXPOSURE (4) OF THE PARKING LOT ALONG THE PUBLIC STAIRS TO SAFEGUARD THE PUBLIC AND PROPERTY
DOB03/08/2022EWO-EXP4 BRCK PARAPT PARTLY COLLPSD NEAR EXP1/4 CORNR& FELLONTO PUBLIC STAIRWAY ON W 229 ST. ON 3/8/22.REMAINING PARAPET @EXP4UNSTABLE& LEANING OUTWARD.APPRX 5'RMAINING PARPT @EXP1/4 IN DISREPAIR IMMED DEMO PARAPT @EXP1/4 CORNR DOWN TO ROOF STRCTR LVL & INSTAL TB FENCE.FILE PRMT W/IN 2DAYS.STRT WRK BY3/10/22
DOB03/08/2022FTM-BLDG IN EXTRME STATE DISRPR.SPALLNG CONCRT&CORRDED REBAR@MULTI LOCTN THROUGHOUT STRCTR.OPN JOIST,CRCKS&LOOSE BRCKS OBSVD @EXP4MULTI LOCTN @EXP1&3ENDS &AT EXP1 PARAPT.OPN JOINTS OBSVD @EXP3 WALL NYSPE IMMED EVALU BLDG& DSGN RPRS.FILE PRMTS BY 4/29/22.OBTN PRMT& STRT WRK BY5/15/22.COMPLT RPR&SIGN OFF PRMTS BY11/21/22
ECB03/08/2022MASONRY WALL PARTIAL COLLAPSE ONTO PUBLIC STAIRS THAT LEAD FROM KINGSBRIDGE TERRACE TO HEATH AVENUE. STRUCTURE LOOKS TO BE DILAPIDATION AND IS /OR COULD BECOME A HAZARDOUS TO THE PUBLIC., REPAIR AND/REPLACE$25K due
DOB03/08/2022EWO-EXP4 BRCK PARAPT PARTLY COLLPSD NEAR EXP1/4 CORNR &FELLONTO PUBLIC STAIRWAY ON W 229 ST. ON 3/8/22.RMAINING BRCK PARAPT @EXP4UNSTABLE &LEANING OUTWARD.LOOSE SPALLNG CONCRT@EDGE COLUMN&BEAMS @EXP4 IMMED INSTAL TB FENCE@EXP1&4,AND SWS @EXP4.STRT WRK BY3/8/22 PE DIRECT LOCATIONS PUBLIC PROTCTN.FILE PERRMIT W/IN 2DAYS
DOB09/25/1990V-DOB VIOLATION - ACTIVE
ECB06/03/2026AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED AT 1-STORY GARAGE WITHOUT REQUIRED LIGHTING AT STAIRWELL AREA, EXPOSURE 4. INADEQUATE ILLUMINATION UNDER SHED CREATES UNSAFE CONDITION AND POTENTIAL TRIP HAZARD FORHearing held — result not yet published$2K proposed
ECB09/07/1995FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS DEFECT IS CRACKED AND SPALING CONCRETE CEILING AT VARIOUS AREARS 2ND AND 3RD STORY LEVELS OF GARAGE. REMEDY: MAKE ALL REPAIRS AND SUBMIT AN ENGINERS REPORT FOR STABITNothing owed — awaiting certificate of correction
ECB06/24/1992FAILURE TO MAINTAIN DEFECT IS CRACKED AND SPALLING CONCRETE CEILING AT VARIOUS AREAS 2ND AND 3RD LEVELS OF GARAGE. REMEDY: MAKE ALL REPAIRAND SUBMIT AN ENGINEERS REPORT FOR STABILITLY OF STRUCTURE.Nothing owed — awaiting certificate of correction
ECB09/25/1990FAILURE TO MAINTAIN: DEFECT IS: CRACKED AND SPALLING CONCRETE CEILINGS AT VARIOUS AREAS 2 & 3RD LEVELS OF GARAGE. REMEDY: MAKE ALL REPAIRS AND SUBMIT AN ENGINEERS REPORT FOR STABILITY OF STRUCTURE.Nothing owed — awaiting certificate of correction