← Back
BuildNYC
Two stories - detached, small or mid-size
2804 POND PLACE
BRONX · BIN 2016675
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R5AZoning
1,950 sfGross Floor Area
1Units
5 Active Violations 2 old, status unconfirmed ▸FDNY Report ↗
Two stories - detached, small or mid-size · 1,975 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/26/2017$413K—HU MANAGEMENT LLC → Private party$212/sf building
10/08/2014$213K—Private party → Private party$109/sf building
07/14/2014$199K—— → —$102/sf building
Building Lifecycle
All (12)Violation (12)
08/11/2024
§ 27-2043 ADMIN. CODE: PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT ... IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT…
HPD violation · open
11/22/2019
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
10/30/2019
Failure to comply w/ the commissioner's order contained in summons/violation#35432876L issued on 7/20/19 and to file a certificate of correction…
ECB violation · closed
10/17/2019
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2019; DOB's record still lists it as active
10/17/2019
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · open · Issued 2019; DOB's record still lists it as active
09/17/2019
Failure to comply with the commissioner's order contained in summons/ iolation#35432875J issued on 7/20/19 and to file a correction pursua t to…
ECB violation · closed
09/17/2019
Failure to comply with the commissioner's order contained in summons/violation#35432876L issued on 7/20/19 and to file a correction pursuantto…
ECB violation · closed
07/22/2019
At time of inspection at the above address on the above date , i observed in cellar fernco couplings installed on drain lines and it prohibited ,…
ECB violation · open
07/22/2019
Electrical work without a permit electrical work in porgress in the attic customer claims that the wires became exposed as a result at the fallen…
ECB violation · open
07/22/2019
At time of inspection at the above address on the above date , i observed in cellar gas boiler and hot water heater installed without any permit on…
ECB violation · open
07/20/2019
Failure to maintain building walls or appurtenances. At the time of inspection at the above address on the above date the chimney has collapsed…
ECB violation · open
07/20/2019
Work without a permit. At the time of inspection at the above address ib the above date it was bserved in the attic that construction actiity was…
ECB violation · closed
Nothing on file for this building.
1 project · most recent 08/28/2019
FiledStatusContractorScope
08/28/2019CompleteAlef Electrical Contracting—
Nothing on file for this building.
Nothing on file for this building.