← Back
Two family converted from one family
2806 CORTELYOU ROAD
BROOKLYN · BIN 3119207
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R6Zoning
2,240 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 2,436 sf lot · 0.92 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/19/2023$1.2M—— → —$527/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY D. SACHS, PE101/06/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157101/06/2025
Building Lifecycle
All (14)Filed (1)Permit Issued (1)Signed Off (1)Violation (6)Special Inspection (5)
03/16/2026
Signed off — Alteration
B01145486-I1
01/22/2025
Permit issued — Solar
B01145486-I1-SL
01/06/2025
Filed — Alteration
B01145486-I1
11/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
11/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
11/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
11/20/2024
Special inspection requirement — Final
Ralph Pacifico
11/20/2024
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
05/23/2011
Violation issued (ECB, closed)
Construction
03/28/2006
Violation issued (HPD, closed)
B
12/29/2003
Violation issued (HPD, closed)
A
12/29/2003
Violation issued (HPD, closed)
B
02/27/2002
Violation issued (HPD, closed)
B
02/27/2002
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offGREGORY D. SACHS, PE01/22/2025
1 project · most recent 01/06/2025
FiledStatusContractorScope
01/06/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/20/2024Fire-Resistant Penetrations and JointsRalph Pacificospecial
11/20/2024Structural Stability – Alterations of existing buildingsRalph Pacificospecial
11/20/2024Energy Code Compliance InspectionsRalph Pacificoprogress
11/20/2024FinalRalph Pacificoprogress
11/20/2024Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026B01145486-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01145486-I1Open ↗
08/28/2026B01145486-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026B01145486-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01145486-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026B01145486-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01145486-I1Open ↗