ECB10/02/2025WORK WITHOUT A PERMIT. NOTED : AT TIME OF INSPECTION OBSERVED AT FRONT OF BUILDING A CANOPY WAS ERECTED WITH FIBERGLASS ROOF,AND 2 STAINLESS COLUMNS, THERE IS NO PERMIT IN DEPT RECORDS FOR THIS WORK ., OBTAIN P$250 due
Two stories - detached, small or mid-size · 2,000 sf lot · 0.58 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.