DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
ECB01/14/200550A/50B/48AB/50C FUCTION VT BOLIER 10HP NB41863 OIL 1982 50A)IMPROPER ARRANGEMENT OF THE BLOWDOWN VALVES INSTALL A SCREW TYPE(SCOW) VALVE AT THE OUTLET END OF THE BLOWDOWN LINE. 50B)NO DISCHARGE PIPE ON THENothing owed — awaiting certificate of correction
ECB11/21/200048A 48B 49 T.W.C.O. MANUAL RESET SWITCH REMOVED TO RESTORE IN THE PANEL.2.WATER COLUMN DRAIN REDUCED AND NEED 2ND VALVE TO INSTALL.3.BLOW DOWN LINE VALVE DEFECTIVE (BROKEN)4/RT SIDE HAND HOLE TO CLEAN OFF CEMENothing owed — awaiting certificate of correction
ECB08/08/19983A,6A,19A,49Q,. BOILER WATER FEED LINE LEAKING, S.V STUCK.FLUE PIPE COCORRODED.Nothing owed — awaiting certificate of correction