💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R6Zoning
5,681 sfGross Floor Area
7Units
Over six families without stores · Owner of record: 2819 WEST 17 ST LLC · 2,375 sf lot · 2.39 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Roof44p · 3 filings · 20 docs
Floor 440p · 1 filing · 20 docs
Floor 336p · 1 filing · 20 docs
Floor 239p · 1 filing · 20 docs
Floor 142p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO707/08/2026
H2 CONSULTING PE PC404/09/2026
2819 W 17 ST203/21/2026
2819 WEST 17 ST403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2021$825K—Private party → 2819 WEST 17 ST LLC$145/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H2 CONSULTING PE PC808/17/2026
SYNERGIC DESIGN ARCHITECTS110/15/2024
ASR ENGINEERING PC205/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H2 CONSULTING PE PC1203/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L2 CONSTRUCTION INCGeneral Contractor1003/21/2026
VMC PLUMBING & HEATING INPlumbing607/08/2026
CASE PLUMBINGPlumbing303/22/2026
JASCO, INCGeneral Contractor207/08/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
ACCORD POWER INCGeneral Contractor104/09/2026
CASE PLUMBING LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H2 CONSULTING PE PC835708/17/2026
SYNERGIC DESIGN LLC8561110/15/2024
LCW ENGINEERING, PC1103107/24/2023
Building Lifecycle
All (125)Filed (11)Permit Issued (10)Signed Off (5)Inspection (9)Objection (60)Special Inspection (30)
08/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
REMOVE 1ST, 2ND FLOOR AND ROOF. REINFORCE EXISTING FOUNDATION AND INSTALL NEW FOUNDATION. ADD 1ST, 2ND, 3RD, 4TH FLOOR ON TOP OF EXISTING AND NEW FOUNDATION. BACKFILL CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00494715-A2
07/08/2026
Special inspection requirement — Lowest Floor Elevation
Harry Hong
07/08/2026
Special inspection requirement — Lighting controls
Harry Hong
07/08/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Harry Hong
07/08/2026
Special inspection requirement — Footing and Foundation
Harry Hong
07/08/2026
Special inspection requirement — Protection of exposed foundation insulation
Harry Hong
07/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Harry Hong
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Harry Hong
07/08/2026
Special inspection requirement — Mechanical Systems
Harry Hong
07/08/2026
Special inspection requirement — Structural Steel - Details
Harry Hong
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Harry Hong
07/08/2026
Special inspection requirement — Metering
Harry Hong
07/08/2026
Special inspection requirement — Shutoff dampers
Harry Hong
07/08/2026
Special inspection requirement — Exterior lighting power
Harry Hong
07/08/2026
Special inspection requirement — Fenestration air leakage
Harry Hong
07/08/2026
Special inspection requirement — Concrete - Cast-In-Place
Harry Hong
07/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Harry Hong
07/08/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Harry Hong
07/08/2026
Special inspection requirement — Masonry
Harry Hong
07/08/2026
Special inspection requirement — Structural Cold-Formed Steel
Harry Hong
07/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Harry Hong
07/08/2026
Special inspection requirement — Final
Harry Hong
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Harry Hong
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Harry Hong
07/08/2026
Special inspection requirement — Air barrier - visual inspection
Harry Hong
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Harry Hong
07/08/2026
Special inspection requirement — Maintenance information
Harry Hong
07/08/2026
Special inspection requirement — Fenestration areas
Harry Hong
07/08/2026
Special inspection requirement — Lighting in dwelling units
Harry Hong
07/08/2026
Special inspection requirement — Insulation placement and R values
Harry Hong
06/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2026
Signed off — Alteration
CAP AND REMOVE EXISTING BATHROOM, KITCHEN FIXTURES. INSTALL PLUMBING FIXTURES AND SPRINKLER SYSTEM IN CONJUNCTION WITH ALT APPLICATION B00494715.
B00588803-I1
04/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
REMOVE 1ST, 2ND FLOOR AND ROOF. REINFORCE EXISTING FOUNDATION AND INSTALL NEW FOUNDATION. ADD 1ST, 2ND, 3RD, 4TH FLOOR ON TOP OF EXISTING AND NEW FOUNDATION. BACKFILL CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00494715-A1
03/26/2026
Objection resolved — Addressed
03/25/2026
Objection raised — Scope
03/12/2026
Objection raised — Scope
03/12/2026
Objection resolved — Addressed
03/12/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
11/13/2025
Signed off — Alteration
Installation of 11.6 kw solar energy system on roof. No change of occupancy, use or egress.
B01126765-I1
07/31/2025
Objection raised — Zoning
07/28/2025
Signed off — Alteration
B00724479-I1
07/17/2025
Objection resolved — Addressed
07/17/2025
Objection resolved — Addressed
07/17/2025
Objection resolved — Addressed
07/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/06/2025
Permit issued — Plumbing
B00588803-I1-EW-SP
06/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/17/2025
Permit issued — Construction Fence
B00724479-I1-FN
03/17/2025
Objection resolved — Addressed
03/03/2025
Objection resolved — Addressed
02/13/2025
Objection raised — Accessibility
02/13/2025
Objection raised — Zoning
02/13/2025
Objection raised — Scope
02/13/2025
Objection raised — Zoning
02/13/2025
Objection raised — Zoning
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC06/06/2025
DOB NOWConstruction FenceSigned-offL2 CONSTRUCTION INC04/17/2025
DOB NOWSolarSigned-offACCORD POWER INC10/29/2024
DOB NOWSidewalk ShedSigned-offJASCO, INC05/28/2024
DOB NOWStructuralPermit IssuedL2 CONSTRUCTION INC05/03/2024
DOB NOWConstruction FenceSigned-offL2 CONSTRUCTION INC05/03/2024
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC10/03/2023
DOB NOWSidewalk ShedSigned-offJASCO, INC07/08/2023
DOB NOWEarth WorkPermit IssuedL2 CONSTRUCTION INC05/04/2023
DOB NOWConstruction FenceSigned-offL2 CONSTRUCTION INC04/28/2023
1 project · most recent 08/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedL2 CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu AOU24RLXFZH 22,000 BTU · Split System ×84
AOU18RLXFZH 18,000 BTU · Split System ×28
Mitsubishi Electric MXZ-3C30NAHZ4 30,000 BTU · Condensing Unit ×18
MXZ-2C20NAHZ3 20,000 BTU · Condensing Unit ×6
Ventilation
Broan NU TONE 50 CFM · Exhaust Fan ×112
General Electric JVX3300EJES 200 CFM · Kitchen Exhaust ×98
PVM9225SR1SS 200 CFM · Kitchen Exhaust ×21
Winair BPT14-14A 90 CFM · Exhaust Fan ×24
7 projects · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026CompleteINTELOGIC ELECTRIC, INC.2 meters, 2 new_meters
10/29/2024CompleteACCORD POWER ELECTRIC LLC—
05/31/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
05/31/2024CompleteINTELOGIC ELECTRIC, INC.—
07/08/2023Permit IssuedRICHARD NEU—
07/05/2023CompleteINTELOGIC ELECTRIC, INC.—
04/12/2018Permit IssuedJAMES WALTERS ELECTL2 meters, 2 new_meters
1 project · most recent 08/17/2026
Steel Masonry
FiledStatusContractorScope
08/17/2026Permit IssuedL2 CONSTRUCTION INCSteel, Masonry
1 project · most recent 08/17/2026
Earthwork
FiledStatusContractorScope
08/17/2026Permit IssuedL2 CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/30/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/08/2026HVAC-R and service water heating equipmentHarry Hongenergy_progress
07/08/2026Fenestration areasHarry Hongenergy_progress
07/08/2026Exterior lighting powerHarry Hongenergy_progress
07/08/2026Lighting in dwelling unitsHarry Hongenergy_progress
07/08/2026Fenestration air leakageHarry Hongenergy_progress
07/08/2026Fenestration and door U-factor and product ratingsHarry Hongenergy_progress
07/08/2026Lighting controlsHarry Hongenergy_progress
07/08/2026Insulation placement and R valuesHarry Hongenergy_progress
07/08/2026Interior lighting powerHarry Hongenergy_progress
07/08/2026Maintenance informationHarry Hongenergy_progress
07/08/2026Protection of exposed foundation insulationHarry Hongenergy_progress
07/08/2026Shutoff dampersHarry Hongenergy_progress
07/08/2026Concrete - Cast-In-PlaceHarry Hongspecial
07/08/2026Excavations - Sheeting, Shoring, and BracingHarry Hongspecial
07/08/2026Fire-Resistant Penetrations and JointsHarry Hongspecial
07/08/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Harry Hongspecial
07/08/2026MasonryHarry Hongspecial
07/08/2026Mechanical SystemsHarry Hongspecial
07/08/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationHarry Hongspecial
07/08/2026Structural Cold-Formed SteelHarry Hongspecial
07/08/2026Structural Stability – Alterations of existing buildingsHarry Hongspecial
07/08/2026Structural Steel - DetailsHarry Hongspecial
07/08/2026Energy Code Compliance InspectionsHarry Hongprogress
07/08/2026FinalHarry Hongprogress
07/08/2026Fire-Resistance Rated ConstructionHarry Hongprogress
Latest 25 of 150.
▾Documents — 264 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00724479-I1Request digital key ↗
08/27/2026B00899436-I1Request digital key ↗
08/27/2026B00588803-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
07/03/2025322121137Open ↗
06/06/2025322121770Open ↗
10/13/2022340842538Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/23/2023340842538Open ↗
▸Zoning, Tax Lot & Property Records21
▸DOB NOWZD1: DOB Zoning Diagram8
08/23/2026B00494715-I1Open ↗
08/23/2026B00494715-A1Open ↗
08/19/2026B00494715-A2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/23/2026B00494715-I1Open ↗
08/23/2026B00494715-A1Open ↗
08/19/2026B00494715-A2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/23/2026B00494715-A1Open ↗
08/23/2026B00494715-I1Open ↗
08/19/2026B00494715-A2Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/26/2025322121770Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications161
▸DOB NOWProgress Inspector Seal & Signature92
09/01/2026B00494715-P8Open ↗
09/01/2026B00494715-P8Open ↗
08/28/2026B01126765-I1Open ↗
Showing 3 of 92 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature57
09/01/2026B00494715-P8Open ↗
09/01/2026B00494715-P8Open ↗
09/01/2026B00494715-P8Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00724479-I1Open ↗
08/27/2026B00588803-I1Open ↗
08/25/2026B01055027-I1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/13/2022340842538Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/23/2026B00494715-A1Open ↗
08/19/2026B00494715-A2Open ↗
Showing 2 of 6 on file for this type
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST2
08/23/2023340842538Open ↗
10/13/2022340842538Open ↗
▸BISSTREET TREES SITE PLAN1
08/23/2023340842538Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/13/2022340842538Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/23/2023340842538Open ↗
▸BISSTREET TREE SIGNOFF1
08/23/2023340842538Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/23/2026B00494715-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026B00588803-I1Open ↗
08/23/2026B00494715-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/23/2026B00494715-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT6
08/23/2026B00494715-A1Open ↗
08/19/2026B00494715-A2Open ↗
08/13/2026B00494715-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00494715-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00494715-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/26/2025322121770Open ↗
06/26/2025322121770Open ↗
06/26/2025322121770Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/04/2025340842538Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026B00494715-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00494715-I1Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
07/03/2025322121137Open ↗
06/26/2025322121770Open ↗
10/12/2023340842538Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
06/06/2025322121770Open ↗
04/29/2025322121137Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/13/2022340842538Open ↗
▸Other Documents26
▸DOB NOWSite Survey: Initial6
08/23/2026B00494715-A1Open ↗
08/19/2026B00494715-A2Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/23/2026B00494715-A1Open ↗
08/19/2026B00494715-A2Open ↗
Showing 2 of 6 on file for this type
▸BISPLOT DIAGRAM3
06/09/2025322121770Open ↗
04/29/2025322121137Open ↗
04/29/2025322121137Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/20/2025322121137Open ↗
05/20/2025322121137Open ↗
04/29/2025322121137Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
10/10/2023340842538Open ↗
10/13/2022340842538Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
06/26/2025322121770Open ↗
08/23/2023340842538Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/10/2023340842538Open ↗
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00494715-I1Open ↗