← Back
BuildNYC
Over six families without stores
2817 FOSTER AVENUE
BROOKLYN · BIN 3120506
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R6Zoning
16,400 sfGross Floor Area
20Units
Rent Stabilized41 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: Foster Building · 5,000 sf lot · 3.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
Floor 4New water heater and plumbing fixtures replacementUnder Construction5p · 2 filings · 11 docs
Floor 3New water heater and plumbing fixtures replacementUnder Construction5p · 2 filings · 11 docs
Floor 2New water heater and plumbing fixtures replacementUnder Construction5p · 2 filings · 11 docs
Floor 1New water heater and plumbing fixtures replacementUnder Construction6p · 2 filings · 11 docs
CellarNew water heater and plumbing fixtures replacementUnder Construction6p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Foster Building103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2023$2.1M—C & E LAND, LLC → FOSTER BUILDING LLC$126/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Daniel Gerdes Architect203/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Millien Design and Consultan403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliant Electrical Contractingspecialty_contractor408/14/2026
Infiniti Esc PlumbingPlumbing207/08/2026
Reliant Electrical Cont'gElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc-HI-Tech Associates6963103/21/2024
Asr Engineering8404103/21/2024
Building Lifecycle
08/13/2026
Permit renewed — General Construction
Renewed without changes
B00999073-I1-GC
08/13/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/08/2026
§ 27-2005 HMC: REFIT DOOR IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD violation · open
04/08/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD violation · open
04/08/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE FOYER LOCATED AT APT 3C, 3rd…
HPD violation · open
196 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedReliant Electrical Contracting08/13/2026
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing10/10/2025
DOB NOWGeneral ConstructionPermit IssuedReliant Electrical Contracting12/19/2024
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing10/03/2024
DOB NOWGeneral ConstructionPermit IssuedReliant Electrical Contracting06/14/2024
BISFBISSUEDApra Fuel Oil BYRS Group12/26/2008
BISPLISSUEDAngelo & Carlos12/26/2008
1 project · most recent 03/21/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/21/2024Signed-offInfiniti Esc PlumbingGas, Water/Sanitary
2 projects · most recent 01/19/2026
General Wiring Lighting
FiledStatusContractorScope
01/19/2026CompleteReliant Electrical Cont'gGeneral Wiring
06/07/2024CompleteReliant Electrical Cont'gGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/08/2024HVAC-R and service water heating system controlsIGOR LISOVENKOenergy_progress
04/08/2024MeteringIGOR LISOVENKOenergy_progress
04/08/2024HVAC-R and service water heating equipmentIGOR LISOVENKOenergy_progress
04/08/2024Permanent certificateIGOR LISOVENKOenergy_progress
04/08/2024Maintenance informationIGOR LISOVENKOenergy_progress
04/02/2024Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
04/02/2024Energy Code Compliance InspectionsIGOR LISOVENKOprogress
01/31/2024Fire-Resistant Penetrations and JointsAKM RAHMANspecial
01/31/2024Energy Code Compliance InspectionsIGOR LISOVENKOprogress
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account