Two family brick
2823 AVENUE X
BROOKLYN · BIN 3202593
💬 Discuss this project
1947Year Built
2Stories
B1Building Class
R4Zoning
1,876 sfGross Floor Area
2Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family brick · 2,033 sf lot · 0.92 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbing
Floor 24p · 1 filing · 20 docs
Floor 1
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TO THE OWNER OF PREMISES103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/04/2025$1000K—GSS21 CORP. → Private party$533/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AARON MCDONALD ARCHITECT307/08/2026
NIC 88 CORP210/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
PIPESTYLISTS, INCPlumbing107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371307/08/2026
AARON MCDONALD ARCHITECT5118206/25/2025
Building Lifecycle
All (45)Filed (5)Permit Issued (3)Signed Off (2)Violation (4)Inspection (5)Special Inspection (26)
08/14/2026
Signed off — Alteration
INSTALL NEW H.W.H., BOILER, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01241407-I1
08/10/2026
Signed off — Alteration
INSTALL NEW H.W.H., BOILER, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01241407-S1
07/13/2026
Special inspection requirement — Mechanical Systems
Aaron McDonald
07/13/2026
Special inspection requirement — Final
Aaron McDonald
07/13/2026
Special inspection requirement — Maintenance information
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
07/13/2026
Special inspection requirement — Insulation placement and R values
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
07/13/2026
Special inspection requirement — Lighting in dwelling units
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
07/08/2026
Filed — Alteration
INSTALL NEW H.W.H., BOILER, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01241407-P3
05/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
05/27/2026
Special inspection requirement — Mechanical Systems
Eric Sun
05/27/2026
Special inspection requirement — Final
Eric Sun
05/27/2026
Special inspection requirement — Insulation placement and R values
Eric Sun
05/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
05/27/2026
Special inspection requirement — Lighting in dwelling units
Eric Sun
05/27/2026
Special inspection requirement — Maintenance information
Eric Sun
05/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
01/29/2026
Permit issued — Plumbing
B01241407-S1-PL
11/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/17/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Filed — Alteration
INSTALL NEW H.W.H., BOILER, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01241407-P2
10/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
10/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/26/2025
Filed — Alteration
INSTALL NEW H.W.H., BOILER, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01241407-P1
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
09/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
09/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/07/2025
Permit issued — Plumbing
B01241407-S1-PL
06/25/2025
Filed — Alteration
INSTALL NEW H.W.H., BOILER, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01241407-S1
06/24/2025
Permit issued — General Construction
B01241407-I1-GC-CX
06/16/2025
Filed — Alteration
INSTALL NEW H.W.H., BOILER, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01241407-I1
10/07/2008
Violation issued (ECB, open)
Construction
10/07/2008
Violation issued (ECB, open)
Construction
04/12/2000
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
04/12/2000
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP01/29/2026
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/07/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY06/24/2025
1 project · most recent 07/08/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Signed-offCUBE BUILDERS GROUP NYAir Conditioning Systems
Cooling
Gree LIV18HP230V1EO MUL18HP230V1R32AO 18,000 BTU · Vrf Outdoor ×4
MUL24HP230V1R32AO 22,000 BTU · Condensing Unit ×1
1 project · most recent 07/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/08/2026Signed-offW.R. PLBG AND HTG CORPGas, Water/Sanitary
2 projects · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026CompleteKJK ELECTRIC INCGeneral Wiring
07/01/2025CancelledKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/17/2025Pass-Final PL - UndergroundPassView ↗
10/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/13/2026Mechanical SystemsAaron McDonaldspecial
07/13/2026FinalAaron McDonaldprogress
07/13/2026Maintenance informationAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
07/13/2026Insulation placement and R valuesAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
07/13/2026Lighting in dwelling unitsAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
05/27/2026HVAC-R and service water piping design and insulationEric Sunenergy_progress
05/27/2026Mechanical SystemsEric Sunspecial
05/27/2026FinalEric Sunprogress
05/27/2026Insulation placement and R valuesEric Sunenergy_progress
05/27/2026HVAC-R and service water heating system controlsEric Sunenergy_progress
05/27/2026Lighting in dwelling unitsEric Sunenergy_progress
05/27/2026Maintenance informationEric Sunenergy_progress
05/27/2026HVAC-R and service water heating equipmentEric Sunenergy_progress
10/01/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
10/01/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
10/01/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/01/2025Energy Code Compliance InspectionsEric Sunprogress
10/01/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
09/24/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/24/2025Energy Code Compliance InspectionsEric Sunprogress
09/24/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
09/24/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
Latest 25 of 26.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01241407-P3Request digital key ↗
08/21/2026B01241407-P2Request digital key ↗
08/21/2026B01241407-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B01241407-P1Open ↗
09/01/2026B01241407-P1Open ↗
08/25/2026B01241407-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01241407-P2Open ↗
08/21/2026B01241407-P1Open ↗
08/21/2026B01241407-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01241407-P1Open ↗
08/25/2026B01241407-P3Open ↗
08/24/2026B01241407-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B01241407-P2Open ↗
08/21/2026B01241407-P1Open ↗
08/21/2026B01241407-S1Open ↗
Showing 3 of 5 on file for this type