← Back
Over six families without stores
2828 STILLWELL AVENUE
BROOKLYN · Coney Island-Sea Gate · BIN 3321738
💬 Discuss this project
1930Year Built
2Stories
C1Building Class
R6Zoning
3,962 sfGross Floor Area
8Units
Rent Stabilized87 Open Violations 85 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 2828 STILLWELL AVE LLC · 3,198 sf lot · 1.24 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction22p · 2 filings · 20 docs
Floor 1Under Construction15p · 2 filings · 20 docs
Sub-BasementUnder Construction18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AANS403/21/2026
NYCHPD103/21/2026
2828 STILLWELL AVE LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/02/2020$901K—Private party → 8221 STILLWELL AVE 4 LLC$228/sf building
03/02/2020$958K—8221 STILLWELL AVE 4 LLC → AANS LLC$242/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VERSATILE ENGINEERING, P.C.1208/06/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SMART PLBG & HTG CORPPlumbing1007/08/2026
SMART PLBG HTGGeneral Contractor403/22/2026
JACOBS DEVELOPMENT CORPORATIONGeneral Contractor303/21/2026
DYNAMIC DEVELOPMENT AND CGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2541008/06/2023
Building Lifecycle
All (131)Filed (12)Permit Issued (7)Signed Off (5)Violation (60)Inspection (9)Objection (24)Special Inspection (14)
08/24/2026
Signed off — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-I1
05/06/2026
Violation issued (HPD, closed)
A
03/11/2026
Permit issued — General Construction
B00578862-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2025
Signed off — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-S1
09/18/2025
Signed off — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-S2
09/18/2025
Signed off — Alteration
PAA IN ORDER TO SHOW AS BUILT CONDITION OF THE GAS RISER, AS PER DOB PLUMBING INSPECTOR COMMENTS
B00578862-S1
07/21/2025
Signed off — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-S3
06/11/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (ECB, open)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2023
Violation issued (HPD, open)
B
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
08/06/2023
Filed — Alteration
PAA IN ORDER TO SHOW AS BUILT CONDITION OF THE GAS RISER, AS PER DOB PLUMBING INSPECTOR COMMENTS
B00578862-P2
08/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/04/2023
Special inspection requirement — Tenant Protection Plan Compliance
08/02/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2023
Permit issued — Plumbing
B00578862-S1-PL
06/05/2023
Permit issued — Boiler Equipment
B00358311-S3-BE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2023
Filed — Alteration
PAA IN ORDER TO SHOW AS BUILT CONDITION OF THE GAS RISER, AS PER DOB PLUMBING INSPECTOR COMMENTS
B00578862-S1
03/27/2023
Filed — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-S3
03/27/2023
Violation issued (HPD, closed)
A
03/24/2023
Filed — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-P5
03/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/15/2023
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/10/2023
Filed — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-P4
02/10/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/10/2023
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
02/06/2023
Filed — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-P3
02/06/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
02/06/2023
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
02/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/02/2023
Permit issued — Boiler Equipment
B00358311-S2-BE
01/15/2023
Filed — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-S2
12/27/2022
Violation issued (HPD, closed)
C
12/27/2022
Violation issued (HPD, closed)
C
12/09/2022
Violation issued (HPD, closed)
C
12/09/2022
Violation issued (HPD, closed)
C
11/16/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/09/2022
Permit issued — Plumbing
B00358311-S1-PL
09/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/22/2022
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
09/21/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Other
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC DEVELOPMENT AND C03/11/2026
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP06/10/2023
DOB NOWBoiler EquipmentSigned-offSMART PLBG & HTG CORP06/05/2023
DOB NOWBoiler EquipmentSigned-offSMART PLBG & HTG CORP02/02/2023
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP11/09/2022
DOB NOWBoiler EquipmentSigned-offSMART PLBG & HTG CORP08/09/2022
DOB NOWGeneral ConstructionPermit IssuedJACOBS DEVELOPMENT CORPOR07/11/2022
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI08/01/2019
BISFBISSUEDBLUE DIAMOND FUEL OIL CORP12/12/2002
2 projects · most recent 08/06/2023
Gas
FiledStatusContractorScope
08/06/2023Signed-offSMART PLBG & HTG CORPGas
03/27/2023Signed-offSMART PLBG & HTG CORPGas
2 projects · most recent 06/08/2020
General Wiring
FiledStatusContractorScope
06/08/2020Permit IssuedFOREST BROOK ELEC'L CONTRGeneral Wiring
04/10/2019CompleteDELTEX ELECTRICAL CONT. I—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/06/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
11/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/08/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
08/08/2023Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
08/04/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
08/04/2023Tenant Protection Plan Compliance—special
03/24/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/15/2023Heating SystemsMAURICIO ANDRADEspecial
02/15/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/10/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/10/2023Heating SystemsMAURICIO ANDRADEspecial
02/06/2023Heating SystemsMAURICIO ANDRADEspecial
02/06/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/22/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/22/2022Heating SystemsMAURICIO ANDRADEspecial
10/25/2021Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/02/2026B00358311-P4Request digital key ↗
09/02/2026B00358311-P3Request digital key ↗
09/02/2026B00358311-P5Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00358311-I1Request digital key ↗
08/15/2026B00358311-P1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/29/2020340779688Open ↗
06/07/2019340679509Open ↗
▸BISWORK PERMIT APPLICATION1
06/07/2019340679509Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00578862-S1Open ↗
08/27/2026B00578862-P1Open ↗
08/27/2026B00578862-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026B00578862-I1Open ↗
08/31/2026B00578862-P2Open ↗
08/30/2026B00358311-P4Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/07/2019340679509Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/07/2019340679509Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/29/2020340779688Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/07/2019340679509Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/08/2019340679509Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/07/2019340679509Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026B00578862-P2Open ↗
08/27/2026B00578862-S1Open ↗
08/27/2026B00578862-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/02/2020340779688Open ↗
06/07/2019340679509Open ↗
▸Energy Compliance5
▸BISAS-BUILT ENERGY ANALYSIS1
11/08/2019340679509Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/07/2019340679509Open ↗
▸BISNYCECC ANALYSIS1
06/07/2019340679509Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/08/2019340679509Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/07/2019340679509Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/07/2019340679509Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/08/2019340679509Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/08/2019340679509Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
11/08/2019340679509Open ↗
11/08/2019340679509Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
08/01/2019340679509Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
10/29/2020340779688Open ↗
06/07/2019340679509Open ↗
▸BISBOROUGH INTAKE FORM1
11/08/2019340679509Open ↗